FOUNDATION IN NATURAL AND BUILT ENVIRONMENT MARCH 2015 INTRODUCTION TO CONSTRUCTION INDUSTRY [ QSB30105 ] FINAL PROJECT : DEVELOPMENT PROPOSAL NAME : CHIN KE NI KELLY (0324021) CRYSTAL CHIA FYE JZNG (0323964) TUTOR : MS. ANN SEE PENG

ICI FINAL PROJECT ( GROUP )

  • Upload
    kellyxc

  • View
    14

  • Download
    2

Embed Size (px)

Citation preview

Page 1: ICI FINAL PROJECT ( GROUP )

FOUNDATION IN NATURAL AND BUILT ENVIRONMENTMARCH 2015

INTRODUCTION TO CONSTRUCTION INDUSTRY [ QSB30105 ]

FINAL PROJECT :DEVELOPMENT PROPOSAL

NAME : CHIN KE NI KELLY (0324021) CRYSTAL CHIA FYE JZNG (0323964)

TUTOR : MS. ANN SEE PENG

Page 2: ICI FINAL PROJECT ( GROUP )

1. PROJECT INTRODUCTION

For this final assignment, we were assigned to search

for a specific empty land outside the boundaries of

Taylor’s University to initiate a small construction

project as a group of 2 along with an individual project

proposal.

The size of the land chosen should be between 50m x

50m (2500m2) - 50m x 70m (3500m2) which is

mentioned in the project brief. Furthermore, we are also

required to serve one of the proposal mentioned, which

includes : Recreation, Commercial, Industrial,

Agricultural, Tourism, and Residential area.

The objective of this project is to enable students to

develop an understanding of the building team, its

organization, duties and inter-relations. Besides that, it is

to develop an awareness of their professional

responsibilities and to appreciate their profession in

the construction industry.

Page 3: ICI FINAL PROJECT ( GROUP )

The learning outcomes of this project is that students

will be able to explain the need to coordinate and

develop an understanding of coherent working relations

among various industry players and to improve the

communication channels. Secondly, students will have

the ability to document their observations and

understanding from interview session and research

resources as well as to communicate their findings in a

systematic and convincing presentation and reports.

Lastly, students will have the ability to justify the

feasibility of a development and improve the proposal to

serve the purpose of the development.

Page 4: ICI FINAL PROJECT ( GROUP )

2. P ROJECT SITE 2.1 Project Location

The piece of land we selected is an undeveloped piece of

barren land, thus we decided to select this particular

land. The land is located at Persiaran Damai Utama 2,

Puchong, Selangor. Besides that, the total size of the

land is 8114m2, therefore we chose to develop 3500m2

of the land.

The chosen land is faced to the North, and there are a

few commercial blocks located right in the opposite of

the land. Furthermore, there is a T-junction beside the

land that is linked to the Kinrara Residence.

Page 5: ICI FINAL PROJECT ( GROUP )

2.2 Site Location

ZoningRED ZONE - Our SiteBLUE ZONE – Residential AreaYELLOW ZONE – Commercial Area

Page 6: ICI FINAL PROJECT ( GROUP )

2.3 Images Of The Site

The view of the land from the roadside.

The main road from the right side of the land.

The main road from the left side of the land.

Page 7: ICI FINAL PROJECT ( GROUP )

Commercial blocks across the streets from the land.

Residential area located near the land.

Page 8: ICI FINAL PROJECT ( GROUP )

2.4 Site Analysis

Our total area of site is 8114m2 and it is totally flat, empty and abandon. We decided the size of our land to be 3500 m2.

The amount of rainfall of our site is 2,800mm to 3,000mm

Our land is facing to the north.

Legend

Sunrise

Sunset

Wind Direction

sunset sunris

e

Page 9: ICI FINAL PROJECT ( GROUP )

Legend

Bad view

Good View

Road direction

Site

Page 10: ICI FINAL PROJECT ( GROUP )

2.5 Site Context

A. Kinrara Residence

B

C

A

D

Page 11: ICI FINAL PROJECT ( GROUP )
Page 12: ICI FINAL PROJECT ( GROUP )

B. Flat

C. Commercial Blocks

Page 13: ICI FINAL PROJECT ( GROUP )
Page 14: ICI FINAL PROJECT ( GROUP )

D. Our Site