FUJITSU CONFIDENTIAL © Copyright 2011 Fujitsu Telecommunications Europe Limited
FTTH Dutch Light
Keith VinningFujitsu Telecommunications Europe Ltd
What Fujitsu is doing
UK opportunities
What we are not doing
Technologies
PIA
Challenges
2 FUJITSU CONFIDENTIAL © Copyright 2011 Fujitsu Telecommunications Europe Limited
Presentation
What is Fujitsu’s role in providing for the ‘Final Third’ Fujitsu is working to deliver a Wholesale open Access network in Areas that benefit from
match funding through BDUK, ERDF or other Public funding initiatives. Currently we are progressing through the ‘Competitive Dialogue’ procurement process with
proposals to The Welsh Assembly Cumbria North Yorkshire BDUK frame contract Individual council projects
First Contracts not expected to be awarded until 2012 with work commencing Q2 2012 Funding arrangements from European sources – fluid at the moment. Need to move quickly if we are to meet 2015 deadline in the final third. Some challenges
Customer Demand Access Funding Reduction in the intervention area Progress
Positive opportunity for Fujitsu
Fujitsu Open Access Network Business Relationship Model
UK&I
FTEL
Customer FrontService DeskHelp Design
Network DesignNetwork Build
Network Operate
Infrastructure Providers
OSP, ISP, Cabinet Install, Customer installations
Trackside Fibre
Duct + Pole Access
Leased /Shared B/haul Fibre
Independent Community Networks
Wholesale Network Operator
Retail Network Operators
Public Service Network Solutions
Business and
Residential
Services
Consumers of Fujitsu Wholesale Services
Fujitsu OAN Service Delivery Mechanisms – Fibre Copper Wireless
Fujitsu TalkTalk and VM trial of BT PIA - The Wirral
Overhead
DP
ODF BT Duct
BT Duct
3.2 km Spine or Core
100% PIA
425m DP to pole62% Footway
38% Carriageway
85% PIA69mtrs new dig
Fujitsu Active Ethernet Switch
Aggregation
11 final drop ConnectionsAve. 25m
100% PIA
BreakoutJoint
MeetMe
Chamber
New Access Fibre Delivery ALANew Access Fibre Delivery ALA
Greasby BT Telephone Exchange Greasby BT Telephone Exchange
VM POP (Birkenhead)
LLU Multi User AreaLLU Multi User Area
New Access Fibre Delivery RFoG New Access Fibre Delivery RFoG
BT DP
BT Footway Box
Existing RFoG
Backhaul
Existing RFoG
Backhaul
Existing Talk Talk
Backhaul
Existing Talk Talk
Backhaul
Talk Talk POP
6 FUJITSU CONFIDENTIAL © Copyright 2011 Fujitsu Telecommunications Europe Limited
Wirral Trial Installation Fibre Connections
pticreach
BT Exchange Arrowebrook
0.2dB Loss
BT Jointin Cable Chamber
0.2db Loss
TalkTalkService Only
0.2dB Loss
OverheadBlown
Fibre DP
BTCablelink(12f)
Loss not included in Fujitsu Budget
BT Pole 1752
BT Pole 1754
BT Pole 1760
BT Pole 1750
Virgin MediaSplitters
BlownFibre
to Home
Fujitsu (12f)
Fujitsu (12f)
5.0dB
Spine & Access Connections
0.2dB Loss
TalkTalkService Only
VM POP (Birkenhead)
Talk Talk POP
FujitsuLink Cable(16f; 2x 8f)
Emtelle
OpticReach
OpticReach
OpticReach
Fujitsu (12f)
Fujitsu Interface Joint @ PIA Spine Interface
Overhead Fibre DP’s
Residential Estate Greasby
Breakdown Joint
Virgin MediaJoint
VM Meet Me Chamber
0.2dB Loss
Note: Loss Budget @ 1550nM Cable Loss 0.24dB/km
0.5dB Loss0.5dB Loss
0.0dB Loss
0.2dB Loss
Fujitsu Breakout Joint
(Spine to Distribution)
Fujitsu Spine 2.8km (144f)0.67dB Loss
0.2dB Loss
7 FUJITSU CONFIDENTIAL © Copyright 2011 Fujitsu Telecommunications Europe Limited
Wirral Trial Installation Fibre Connections – Virgin Media ISP (RFOG)
0.2dB Loss
Virgin MediaJoint
FujitsuLink Cable(16f; 2x 8f)
0.2dB Loss
Overhead Fibre DP’s
Fujitsu Breakout Joint
(Spine to Distribution)
BT Pole 1752
BT Pole 1754
BT Pole 1760
BT Pole 1750
Virgin MediaSplitters
BlownFibre
to Home
Fujitsu (12f)
5.0dB
Spine & Access Connections
Residential Estate Greasby
Fujitsu (12f)
ILM TestF1 = 1.92dBF2 = 1.52dBF3 = 1.14dBF4 = 1.27dB
ILM TestF1 = 1.17dBF2 = 1.83dBF3 = 0.71dBF4 = 0.88dB
OTDR TestF1 = 0.68dBF2 = 0.62dBF3 = 0.36dBF4 = 0.32dBF5 = 0.62dB
OTDR TestF1 = 0.48dBF2 = 0.47dBF3 = 0.26dB
Pole 1750 Pole 1752 Pole 1754 Pole 1760
Note: Loss Budget @ 1550nM Cable Loss 0.24dB/km
Fujitsu Interface Joint @ PIA Spine Interface
Fujitsu Spine 2.8km (144f)
VM POP (Birkenhead)
Loss not included in Fujitsu Budget
Emtelle
OpticReachOpticReach
OpticReach
Fujitsu (12f)
OverheadBlown
Fibre DP
A
B
B
B
B
Measured Fibre Tests BA to
Fujitsu Breakdown Joint
0.5dB Loss
0.5dB Loss
0.2dB Loss
0.0dB Loss
0.2dB Loss
0.2dB Loss
0.67dB Loss
Final Drop Connections
8 FUJITSU CONFIDENTIAL © Copyright 2011 Fujitsu Telecommunications Europe Limited
9 FUJITSU CONFIDENTIAL © Copyright 2011 Fujitsu Telecommunications Europe Limited
Happy customer and contented council
Local Authority Highways Group Feedback:
“It was a pleasure to help your company through the process. As for feedback, my inspector Norman Pratt had no issues other than the one lady's access to her property, to their credit the lads onsite conducted themselves professionally in his opinion. As for myself, I can only say that it was a help that you made contact with us prior to the works starting, and the discussions that took place after viewing the plans were a benefit to both parties. These discussions also gave Wirral Council a heads up into what to expect and what we expected from your company. The co-ordination was also successful regarding the access to apparatus and suitable times (i.e. weekend works)”
Wirral Borough Council
10 FUJITSU CONFIDENTIAL © Copyright 2011 Fujitsu Telecommunications Europe Limited