Page 1: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Future new entrance into existing science bldg, connecting the two bldgs. with covered walkway from the anatomy labs. Rebar Cages are for walkway columns

Page 2: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Entrance to exit foyer at anatomy labs & cadaver rooms. Rebar Cages shown are for columns at new covered walkway connecting two bldgs.

(Note width of door here is 4’-4”)

Page 3: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Future courtyard space. Shade structures will be erected.

Page 4: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Different view of Courtyard Space, looking toward new building. Shade structures will be erected.

Page 5: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Future covered walkway between existing bldg. and foyer to chemistry labs

Page 6: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

North side of bldg., looking at doors to new electrical room, and beyond that the door to the exit foyer leading to science/chemistry labs. Covered walkway will connect the new bldg. to old bldg.

Page 7: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Interior shot looking at the exit door from foyer at chemistry/science labs to the new covered walkway connecting to existing bldg.

Page 8: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Conduit stub ups for panels – Located in main electrical room

Page 9: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Additional conduit stub ups for panels – Located in main electrical room

Page 10: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Looking into space for future Beds & Equip, Medical Supplies & utility roomsThis doorway is door #110 on plans

Page 11: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Taken from the medical supplies room, looking out at the beds & equipment space. Door 112C is straight ahead, and door 110 to the right

Page 12: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Plumbing wall for student restrooms

Page 13: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Also student restrooms, looking into space that will become the custodial, fire riser, and vestibule spaces. You can see the waste lines for sinks & a 4” wall cleanout. A sliver of door 102 can be seen to the left.

Page 14: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Conduit stub ups inside future electrical sub panel room. Just beyond, to the right, is the door from meeting room to exterior of bldg.

Page 15: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Mens & Womens Faculty Toilets

Page 16: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Another shot of the Mens & Womens Faculty Toilets: the in-wall plumbing.

Page 17: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

This is the cadaver room (closest) and the cat storage room (beyond). These rooms both have floor drains and depressed slabs, and will get ceramic tile flooring. The cat storage room has build up concrete bases for cabinets to

sit on.

Page 18: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

This is the anatomy / physiology lab. The round protrusions are for the duct that will run up into the center of each of the student work tables.

Page 19: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Looking at the exterior wall of Meeting room and adjacent Dean’s office. These windows will look out onto the courtyard area between the two buildings

Page 20: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

This opening will become the sliding door entrance at south side of bldg., leading into the corridor to simulation center and anatomy labs

Page 21: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

This space will be home to the Simulation center, with its SIM labs, observation rooms and control booths. Interior walls will be framed to create each room. The door seen to the left is door 137B

Page 22: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Also of the Simulation Center space, looking to the north. The opening in the CMU wall is the space shown as the study area, with hall/corridor beyond.

Page 23: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Plumbing for the Patient Toilet, located off the patient room SIM lab.

Page 24: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

This is the main entrance hall, looking out toward where the revolving door entrance will be. To the right is the entrance area to the student restrooms.

Page 25: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

In the main entry hall, this will be the home of two display cases, set back into an alcove space. These will be to the right, as a person enters through the revolving door.

Page 26: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Future home of the nursing faculty offices & copy room. Door seen straight ahead is the door to the maintenance storage room.

Page 27: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Also in the future faculty offices. Right ahead will be the space for rooms designated as 125 and 124 on plans, with exterior door 126B seen to the right.

To the left, where all the scaffolding is placed, is the location of new sliding entrance, door 127A

Page 28: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

This is the future home of the new Nursing Fundamentals Lab. This space is adjacent to the faculty offices, and has double doors connecting it to the beds & equipment room

Page 29: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

Chemistry Lab space. Chemical balance room to the far right corner, and then chemistry lab adjacent. Doorway seen to the right is the door for exit foyer

Page 30: Dr. Prem Reddy Health Sciences Building - Construction Update - October 2014

These are the stone columns that line corridor 127, between the science labs and the rotunda space. There will be glass running between the columns along this wall, that will look out onto the courtyard space.