CRACKING ON FLOOR

FACTOR :

Drying shrinkage.

Step placement of concrete from well barrow.

The fast evaporation process

HOW TO OVERCOME

The dump placed correctly into the face of concrete.

The time to place concrete must suitable.

Page 4: DEFECTS IN CONCRETE

CRACKING ON BEAM

FACTOR :

Corruption of reinforcement.

Quality of concrete is less.

Standard form of cover concrete is not followed.

HOW TO OVERCOME

Use quality concrete.

Use water free from other particles.

The contractor has to be honestly.

Page 5: DEFECTS IN CONCRETE

CRACKING ON THE COLUM

FACTOR :

Silt of plastic.

HOW TO OVERCOME

Perfect vibration.

Perfect curing.

Page 6: DEFECTS IN CONCRETE

CRACKING ON WALL

FACTOR :

Joint uneffective.

Curing process is not sufficient

HOW TO OVERCOME:

Plaster back on the surface.

make the process of curing on time.

Page 7: DEFECTS IN CONCRETE

FACTOR OF CONCRETE

DAMAGE

1. Design errors.

2. Construction errors.

3. The problem of quality of construction

materials.

4. Geotechnical problems.

5. Problems that can not be predicted.

Page 8: DEFECTS IN CONCRETE

Lakaran jenis keretakan yang boleh berlaku pada struktur konkrit.

Page 9: DEFECTS IN CONCRETE

1. Errors can occur when making

the assumption the total cost,

followed by carelessness when

making detailed.

2. The design process using the

standard code can produce work

that is not well satisfied.

1. DESIGN ERRORS.

3. The designer must balance

between the theoretical and

practical design.

4. Errors in design will lead to

cracks due to excessive stress

applied to the structural elements.

Page 10: DEFECTS IN CONCRETE

The diagram describes the mechanisms of cracking due to loading.

Page 11: DEFECTS IN CONCRETE

communication between the engineer and contractor should be

agree well.

Job skills are main factors to the occurrence of any structural

damage.

ERRORS DURING

CONSTRUCTION

Page 12: DEFECTS IN CONCRETE

To produce high quality

concrete, the materials used,

such as cement and

aggregates must be in good

condition and meet the set

specifications.

All contractors working

on construction sites should

be monitored to ensure good

quality work.

MATERIALS QUALITY

PROBLEMS

Page 13: DEFECTS IN CONCRETE

GEOTECHNICAL PROBLEMS

Geotechnical problems

refers to the basic structure

or pile and the soil itself is a

problem.

insufficient number of

piles during piling or error,

or is likely also the loss of

soil bearing strength due to

the close working.

Page 14: DEFECTS IN CONCRETE

Explosion Effect

Effects of Accident

(Collision)

Earthquake Effects

Concrete Deterioration

Factors

Fire Effects

PROBLEMS CAN NOT BE

PREDICTED

Page 15: DEFECTS IN CONCRETE

TQVM PN.NORHAYATI BT PALIL

Page 16: DEFECTS IN CONCRETE

PREPARED BY :

SURAYA BT ISMAIL

ADAM BIN YUSOFF

ABDULLAH TARMIZI BIN ABD RAHMAN

RAJA NOOR AMIRA

AHMAD FITREE

YOUNG JIA EE