Primary Copper Plant Design

Extractive Metallurgy of CopperDavenport, King, Schlesinger, Biswas

Page 2: Copper extractionplantdesign
Page 3: Copper extractionplantdesign
Page 4: Copper extractionplantdesign
Page 5: Copper extractionplantdesign
Page 6: Copper extractionplantdesign
Page 7: Copper extractionplantdesign
Page 8: Copper extractionplantdesign
Page 9: Copper extractionplantdesign
Page 10: Copper extractionplantdesign

Economics of Pyrometallurgical Processing of 0.75% Copper Sulphide Ores

Page 11: Copper extractionplantdesign

Fixed Investment

Study estimate: Green field plant with construction beginning in 2002

Page 12: Copper extractionplantdesign

Effect of Ore GradeConsider 0.5% and 1.0% copper ores• Mine investment costs– Identical production rate means 0.5% copper ore

mined at twice the rate of 1% copper ore• Twice as much plant and equipment (e.g. trucks)• Twice as much investment

• Concentrator investment costs– Condition same as mines

• Smelter – Influenced by grade of concentrate and not ore

Page 13: Copper extractionplantdesign

Operating Costs

Assumes 90% copper recovery

Page 14: Copper extractionplantdesign

• Variations in direct operating costs– Ore grade• Amount of ore handled increases with decreasing

grade

– Underground mining• Cost is twice that of open pit mining• Used for extracting higher ore grades than open pit

mining

Page 15: Copper extractionplantdesign

Total Production Cost

• FCI = US$ 8.5/year/kg Cu• Working capital: 10% of FCI• Direct operating costs: US$ 1.1/year/kg Cu• Indirect operating costs: 12% of FCI• Total production cost (DOC + IOC): US$ 2.2/kg

Page 16: Copper extractionplantdesign

• The price-profit situation– Copper prices above $2.2/kg is profitable– Underground and open pit ore bodies viable at

ore grades of 1.5% and 0.75% respectively– In older plants IOC would be lower• Some companies made profits even at $1.5/kg• Some others shut down

Page 17: Copper extractionplantdesign

Concentrator: FCI

Page 18: Copper extractionplantdesign
Page 19: Copper extractionplantdesign
Page 20: Copper extractionplantdesign
Page 21: Copper extractionplantdesign
Page 22: Copper extractionplantdesign
Page 23: Copper extractionplantdesign
Page 24: Copper extractionplantdesign
Page 25: Copper extractionplantdesign
Page 26: Copper extractionplantdesign

Hydrometallurgical Processing Economics

Page 27: Copper extractionplantdesign