16
Cockermouth Eight Months On

Cockermouth 8 Mnths On

Embed Size (px)

DESCRIPTION

A return to Cockermouth after the floods on on the eve of the visit by Princess Anne

Citation preview

Page 1: Cockermouth 8 Mnths On

Cockermouth

Eight Months On

Page 2: Cockermouth 8 Mnths On
Page 3: Cockermouth 8 Mnths On
Page 4: Cockermouth 8 Mnths On

Main Street

Abandonment

Page 5: Cockermouth 8 Mnths On

Restoration

Page 6: Cockermouth 8 Mnths On

Adaptation

Page 7: Cockermouth 8 Mnths On

Wordsworth House

Flood Level

Page 8: Cockermouth 8 Mnths On

Education

Page 9: Cockermouth 8 Mnths On

Riverside

Despair

Hope

Page 10: Cockermouth 8 Mnths On
Page 11: Cockermouth 8 Mnths On
Page 12: Cockermouth 8 Mnths On

Brewery Bridge

Page 13: Cockermouth 8 Mnths On
Page 14: Cockermouth 8 Mnths On

Defence

1 Million from the EA

Page 15: Cockermouth 8 Mnths On

Workington North Station

• At the end of September 2010 Workington North Railway Station closed

• Serving 2000 passengers following the bridge collapse this has now dropped to 60.

Page 16: Cockermouth 8 Mnths On

Credits

• Photos

Mark OLLIS

• based on the Cockermouth flood trail leaflet – purchased to raise funds for town’s recovery