14
Integrity – Transparency – Professionalism – Respect Presented by: Jamie Buchanan, Group CEO, powerPerfector Stuart Parker, Group Property & Environment Director, NX Group. National Express in the Fast Lane to Sustainability Energy Solutions powerPerfector

Case Study: National Express in the Fast Lane to Sustainability

Embed Size (px)

Citation preview

Page 1: Case Study: National Express in the Fast Lane to Sustainability

Integrity – Transparency – Professionalism – Respect

Presented by:

Jamie Buchanan, Group CEO, powerPerfector

Stuart Parker, Group Property & Environment

Director, NX Group.

National Express in the Fast

Lane to Sustainability

Energy SolutionspowerPerfector

Page 2: Case Study: National Express in the Fast Lane to Sustainability

powerPerfector

• Established 2005

• 80+ dedicated team members

• 2011 – Acquired IP, global

manufacturing and distribution rights

• 2012 – Manufacturing begins in the UK

• Committed to Greening the UK and

beyond

The Company

Page 3: Case Study: National Express in the Fast Lane to Sustainability

powerPerfector’s integrated energy efficiency solution

powerPerfector

conditions your power

and optimises your

voltage supply level.

Your entire building

is supplied with an

optimised voltage

and is protected

from common

transients.

Our partnership with

best-in-class technologies

allows for custom

integrated solution.

Page 4: Case Study: National Express in the Fast Lane to Sustainability

Working in partnership to save you more

Voltage Power

Optimisation

Lighting

Other energy

conservation

measures

Combined Heat

and Power

Management,

control &

optimisation

Collaboration with

strategic partners to

offer the best of breed

technical solution

Page 5: Case Study: National Express in the Fast Lane to Sustainability

Five steps to reduce energy costs

• Guaranteed savings

• Third party measurement and verification

• Optional energy performance contract (EPC)

Page 6: Case Study: National Express in the Fast Lane to Sustainability

Working in partnership to save you more

• National Express and PowerPerfector

• To date - Voltage Power Optimisation, Radiant Heating, Air source heat

pumps

• Pending – T5 and LED Lighting installations, Heating and Building

Controls

• Additional value:

• Assistance with tendering

• Incorporated into rail franchise bids

• Project planning and identification of short/long term measures

• Shared vision for supporting UK jobs/growth

Page 7: Case Study: National Express in the Fast Lane to Sustainability

National Express in the fast lane to sustainabilityAn energy efficiency case study

Stuart Parker

Group Property & Environment Director

Page 8: Case Study: National Express in the Fast Lane to Sustainability

About us

• 2011 revenue - £2.2billion

• 2011 profits - £138million

• 10,000 people

• Bus, coach and rail in UK

• ‘Yellow’ School Bus services in:

– USA (32 states)

– Canada (4 provinces)

• Bus & Coach travel in Spain and Morocco

• Future opportunities

Page 9: Case Study: National Express in the Fast Lane to Sustainability

Business drivers

Reputation

Efficiency and cost saving

Risk and compliance

Page 10: Case Study: National Express in the Fast Lane to Sustainability

UK overview

• Heavily regulated with targets

• Carbon Reduction Commitment

• Mandatory Carbon Footprint reporting

• European and UK legislation (e.g. emission targets)

• Internal 10% year on year carbon reduction target

• Our emissions

Page 11: Case Study: National Express in the Fast Lane to Sustainability

Energy saving in our depots and stations

• Using less energy:

• Using the waste we create:

• Creating our own energy:

• Overall results: 10% reduction in carbon use at bus garages

Page 12: Case Study: National Express in the Fast Lane to Sustainability

Future projects

National Express is committed to going the extra mile to achieve

sustainability

• Lighting upgrade – mixture of T5/ LEDs at bus and coach stations

• Further round of VPO® within the bus depots and coach stations

• Decentralised heating projects at four bus garages

• Building controls (to reduce energy consumption and improve

employee engagement).

Page 13: Case Study: National Express in the Fast Lane to Sustainability

What we have achieved to date

• All project subject to Measurement & Verification (EEVS Insight Ltd) to corroborate energy savings estimates.

Co