CASE HISTORY
SEINONDATHE PARTICIPATION PROCESS FOR FLOOD RISK MANAGEMENT
PLANS (DIRECTIVE 2007/60/EC)
Workshop SEINONDA: new perspective and ideas from European young people
Sabrina FranceschiniRegional Department for Communication, training and participation tools
13° EUROPEAN YOUTH PARLIAMENT FOR WATER
March 16°, 2016 - BURIER
Patrizia ErcoliRegional Department for Soil and Coast Protection and Drainage System
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
Overview
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
The participation process SEINONDA
2007 EU Flood Directive on the assessment and management of flood risks
POLICY
The purpose of this Directive is to establish a framework for the assessment and management of flood risks, aiming at the reduction of the adverse consequences for human health, the environment, cultural heritage and economic activity associated with floods in the Community.
Flood event: Temporary covering by water of land not normally covered by water. This shall include floods from rivers, mountain torrents, Mediterranean ephemeral water courses, and floods fromthe sea in coastal areas, and may exclude floods from sewerage systems
Secchia river(Jan. 19, 2014)
Lido di Savio (Mars 2010)
Calendasco, Piacenza (2011)
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
ISPRA Report on the Hydrogeological instability in Italy: hazard and risk indicators(233/2015) - http://www.isprambiente.gov.it/it
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
22’’759759’’962962
Inhabitants
1015 kmq1015 kmq
Urban and artificial areas
254254’’337 n.337 n.
Economic activities
1313’’274 n.274 n.
Cultural heritage
P3 – Floods with a high probability
P2 – Floods with a medium probability
P1 – Floods with a low probability (extreme event scenarios)
FLOOD HAZARD MAPS and SPECIFIC RECEPTORS POTENTIALLY AT RISK in EMILIA-ROMAGNA REGION
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
Hazard and risk maps are available for consultation by citizens, Mayors, public institutions, for self – protection actions, planning decisions, emergency response
This map (Trebbia River) represents the areas that can be
flooded for different scenarios
Ä
Ä
Do you know if you live in a flood zone?
Flood scenarios
http://ambiente.regione.emilia-romagna.it/suolo-bacino/sezioni/piano-di-gestione-del-rischio-alluvioni/cartografia
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
Risk assessment cycle and risk mitigation strategy
PROTECTION
PREPARDNESS
RECOVERY AND REVIEW
PREVENTION
RISK RISK ASSESSMENT ASSESSMENT
CYCLECYCLE
FLOODSFLOODS
EMERGENCY RESPONSE
PREVENTION Land use planning policies, Regulation, Removal or relocation, Limit soil compaction and sealing, Conserve, protect and, where possible, Restore vegetation and forest in mountainous areas, riparian woodland and meadows, Conserve, protect and, where possible, restore degraded wetlands and flood plains, Reconnect of floodplains to the river by e.g. relocating dykes, opening natural levees, Conserve Sandbanks and sand dunes, Improve knowledge
PROTECTION Maintenance programmes, Construct areas for controlled flooding, Construct and/or heighten dikes, protect, heighten and develop sandbanks, dams or on-line storage areas, beach nourishment and protection
PREPARDNESS Flood forecasting and warning, Contingency planning, public awareness and preparedness, risk communication and education, Inform and teach people what to do before, during and after a flood
EMERGENCY RESPONSE
Emergency Event Response Planning, Inform and teach people what to do before, during and after a flood, Evacuation, Develop contingency plans
RECOVERY AND REVIEW
Individual and societal Recovery, Clean-up and restoration activities (buildings, infrastructure, etc.), Health and mental health supporting actions, incl. managing stress, Disaster financial assistance (grants, tax), incl. disaster legal assistance, disaster unemployment assistanceTemporary or permanent relocation, Environmental recovery, Clean-up and restoration activities, Lessons learnt from flood events
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
Some examples of flood events in E-R Region:
The coastal storm of 6th February 2015
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
14-15 sept. 2015 Trebbia and Nure flood event
««
«
«
«
oo
o
o
o
o!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!Bore
Varsi
Pione
Marra
RiglioPerino
Gariga
Ramiola
Valdena
Teruzzi
Rovegno
Pessola
Bettola
Bedonia
Valverde
Tarsogno
Noveglia
Bobbiano
Torriglia
Romagnese
Mormorola
Groppallo
Farfanaro
Vicobarone
S. Nicolo'
S. Michele
Pellegrino
Nociveglia
Grammatica
Frassineto
Gropparello
Cassimoreno
Casalporino
Barbagelata
Alpe Gorreto
Piacenza urbana
Casaselvatica
Selva Ferriere
Albareto Parma
Varano Marchesi
Monticelli
Casoni di S. Maria di Taro
Diga del Brugneto
S. Stefano d'Aveto
Pieve di Cusignano
Bosco di Corniglio
Castellazzo Villanova d'Arda
Bardi
Ponte Nibbiano Tidoncello
Farini
Bobbio
Tornolo
Fornovo SIAP
Ciriano
Cabanne
Vigoleno
Veggiola
Saliceto
Pradella
Piacenza
Rivergaro
Montanaro
Lugagnano
Corniglio
Ostia Parmense
Luretta
Rottofreno
Salsominore
Case Bonini
Fidenza SIAP
Ferriere Idro
Ponte Nibbiano
Ponte Lamberti
Ponte dell'Olio
Berceto
Trebbia Valsigiara
Pontenure
Castellina di Soragna
Salsomaggiore
Pianello Val Tidone
Ponteceno
Fiorenzuola d'Arda
Piacenza SIAP
TREBBIA
TIDONE
NURE
CENO
CHIAVENNA
ARDA
Farini village – Nure Basin
Trebbia Basin
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
The effects of the 13-14° September 2015 flood event (Nure and Trebbia rivers)
Flood damage data:
• Three persons died;
• over 100 people evacuated;
• 505 buildings damaged
• 80 little village isolated
• 11 provincial roads damaged
• Over 200 km of roads damaged
• 4000 public utilities like electricity, gas supply and water distribution, disrupted
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
Rio Lavezza (Albinea, RE) - modification or removal
of structures or the alteration of channels
Pre-lavori Post-lavori
Pre-lavori
durante-lavori
post-lavori
Some examples of measure programs in E-R (Dir.2000/60 & Dir. 2007/60)
Tevere river (Verghereto, FC) - Removal
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
PROTEZIONE: alcuni esempi
Panaro river -Storage area
Parma river -Storage area
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
The participation process
Goals
• To share the flood hazard and risk maps
• To engage citizens and stakeholders during all process
• To reach new ideas and proposals
• To create new networks and partnerships
• To train and prepare the general public
LEVEL OF INVOLVEMENT
Target
Citizens, Associations, Local Authorities, Private companies
Planning
The project lasted 2 years and half.
From May 2013 to December 2015
Coordinator
Emilia-Romagna Region
Regional Department for Soil and Coast Protection and Drainage System
PARTICIPATORY PLANNING
EMPOWERMENT/GESTIONE
CONSULTATION
INFORMATION
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
Process Storytelling
From May 2013 to December 2015
PLANNING OF ACTIVITIES
OFFLINE ONLINE
ST
AR
TS
TA
KE
HO
LD
ER
S E
NG
AG
EM
EN
TE
ND
May 2013 Kick-off Meeting Project Team
December 2013
Feb. – Apr. 2014
Jun. – Oct. 2014
March 2015
May – Jun 2015
Dec. 2015
Institutional Meeting
2 Workshops with local community and stakeholders
National Water Conference
3 Technical Meeting with local institutions
Opening virtual square in e-participation portal
9 Technical Meetings with local institutions
Sept – Opt 20153 Workshops with local community and
stakeholders
Final FRMP Adoption
On-line forum
Pool
Blog
Process documents
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
The workshops
Challenging problems are transformed into creative ideas, innovations, strategies and solutions through dialogue, leadership, communication and participatory interaction.
We used various technique like:
•Team Building and Action Planning (for internal workshops)
•LegoSeriousPlay, MODI’ Digital Mosaic, Knowledge and World Café, Idea Boxes ( to involve the target)
Methodology
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
The Workshops
§ River and drainage system maintenance: regulations, methods, costs, critical points (PREVENTION / PROTECTION MEASURE)
§ Coastal areas maintenance: regulations, methods, costs, critical points (PREVENTION / PROTECTION MEASURE)
§ Emergency plans (PREPARATION MEASURE)
§ Regional Alert System (PREPARATION MEASURE)
Themes:
How the public perceives the problemWhat action the public requires
SEINONDA virtual square
ONLINE TOOLS
TO INFORM
TO INVOLVE
ID CARDlink
BIOGRAPHYlink
FAQlink
WORKBOOKlink
FORUMlink
DOCUMENTSlink
BLOGlink
POOLSlink
GLOSSARYlink
SEINONDA banner advertising
ONLINE CAMPAING
Figures
• 29 days• form 11/11 to 9/12 of 2015• Budget : €10.000,00• Total impressions: 12.304.516• Total click: 20.917• Total visits: 26.090• Total visitators: 23.103• conversion rate 3,04%
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
Results
In two years of project ( from 2014 to 2015)
SOME FIGURES…
IDEAS/ PROPOSALS
TOTAL PARTICIPANTS
1301
MEETING/WORKSHOP
19
WS PARTICIPANTS PROFILES
FEEDBACK PARTICIPANT PRESS RELEASE
185
ON LINE CONTACT
…from tomorrow I’ll try to share this experience
with my friends…
2926 Visitors
12.409
Download
518
Contributions
311
86
14
28109
36
13
Voluntary Associations
Private Companies
Freelancers
Institutions
Citizens
Universities
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
Impacts
- The regional strategy in Flood Risk Management (FRMP) has been re-defined also with the contribution of citizens ideas
- More attention to public involvement in risk management (schools, young people, associations, volunteers, etc)
- Development of new communication channels between public institutions and citizens, especially during emergency situations
- Improvement of the cooperation between different public institutions
- Development of new tools for establishing cooperation between public institutions and citizens in watercourses maintenance
- Empowerment of Mayors and citizens
- New partnership between Research team – public institutions and private companies
- Build resilient communities
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
Behind the scene
What resources were strategic…
Key factors
TRAINING
PROJECT TEAM BUDGET
About 30,000 Professional meeting
support
«Cabina di Regia»
33 members (16 women)
Emilia Romagna Region: Servizio Difesa del Suolo, della Costa e Bonifica, Servizio Comunicazione,
Educazione alla Sostenibilità e Strumenti di Partecipazione, Servizio Tutela e Risanamento Risorsa
Acqua, Servizio Geologico, Sismico e dei Suoli; Servizio Tecnico di Bacino Romagna, Po di Volano e
della Costa, Reno, dei Bacini degli Affluenti del Po
Autorità di Bacino del fiume Po, del Reno, Interreg.le Marecchia e Conca, dei Bacini Regionali
Romagnoli
Consorzio della Bonifica Renana, Parmense, di Piacenza
Agenzia Regionale di Protezione Civile, Agenzia Regionale per la Protezione Ambientale
Assessorato Sicurezza Territoriale, difesa del suolo e della costa, protezione civile
About 20,000 Professional organization
support
About 10,000Advertising
PROFESSIONAL SUPPORT
FUTOUR company helps Region for
discuss so as to take decisions and co-
create the future.
PROMOTIONAL CHANNELS
Below the line (poster, workbook, IDCard,
ecc), Online: web eParticipation platform,
Social media, Banner Advertising
25 internal meeting to
prepare the workshops
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
Challenges and solutions
Challenge 4
Institutions and Local Authorities go face to face with public: communication and participation is a risk? Public participation in decision making
Challenge 3
Solution 4Solution 3
Clarify public role and competences in a transparent and smart modality.
New language approach and new perspective
Discuss about technical problems and themes (hazard and risk maps, Flood Risk Management Plans, etc) with citizens and local communities (non expert stakeholders)
Challenge 2
Feedback mechanisms and participation are essential ingredients to developed effective policies
Challenge 1
Solution 2Solution 1
Stakeholder engagement with innovative mechanisms
Team building and Action Planning
New orchestration capability needs to be developed
13° EUROPEAN YOUTH PARLIAMENT FOR WATER PARTICIPATION PROCESS SEINONDA Burier, 16° march 2016
Tips to share
Tip 1
Taking the time to process design and internal sharinge tip
Tip 2
Do not be discouraged by the (normal) difficulty: every problem is a challenge to overcome
Tip 3
Do not be afraid to do things they have never done: innovation goes from there!
Tip 3
Participation is a hard task for citizens, but can be extremely interesting: dedicate your time in these initiatives!!
Thank you J
Sabrina Franceschini
Patrizia Ercoli
http://ambiente.regione.emilia-romagna.it/suolo-bacino/sezioni/piano-di-gestione-del-rischio-alluvioni/piano-
gestione-del-rischio-alluvioni
http://partecipazione.regione.emilia-romagna.it/iopartecipo/valutazione-e-gestione-del-rischio-di-
alluvioni/verso-il-piano-di-gestione-del-rischio-di-alluvioni