22
Adi Irfan Che Ani Building Surveying Division, Royal Institution of Surveyors Malaysia Dec 2014

BS M'sia

Embed Size (px)

Citation preview

Page 1: BS M'sia

Adi Irfan Che Ani

Building Surveying Division,

Royal Institution of Surveyors Malaysia

Dec 2014

Page 2: BS M'sia
Page 3: BS M'sia

REGISTER

Pay subscription fee

Maintain CPD

Page 4: BS M'sia

1 Carry out dilapidation survey or pre-construction condition

survey of existing buildings;

Carry out pre-purchase building survey of building condition

through inspection and checking;

Checking of procedural requirements of drawings and buildings

to ensure compliance to by-laws and regulations;

Inspect and prepare programmes for implementing

maintenance management, asset, facilities and refurbishment

works of building; and

Inspect and prepare reports on conditions of buildings, post-

occupancy evaluation of buildings conditions and risk

assessment.

3

4

5

2

Page 5: BS M'sia
Page 6: BS M'sia

Registered BS: 46 only

Page 7: BS M'sia
Page 8: BS M'sia
Page 9: BS M'sia
Page 10: BS M'sia
Page 11: BS M'sia

Building Surveyors (BS) Continuous Professional Development Program (CPD) is to ensure the registered building surveyors of the

Royal Institution of Surveyors Malaysia (RISM) have an equivalent level of competence in practicing building surveying scope of work, in order

to provide the best service to the community and country.

CPD introduced collection points system through the involvement of Building Surveyors in various events or activities organized by the

Building Surveying Division RISM / RISM / government or organizer who are registered / recognized by the Building Surveying Division

RISM / RISM.

Building surveyors need to collect the prescribed number of points during their active period of the registration and the number of points

accumulated will be used for renewal purpose in the future.

Page 12: BS M'sia

Keeping up to date

More rounded professional

Equivalent level of competence in practicing building surveying scope of work

Page 13: BS M'sia

‘Clause No. 8.0 – For each transfer class of membership application, the CPD points must be the pre-requisite of the candidate to be followed and completed, before the

transfer is going to be approved. In the event of non-fulfilment, the transfer application shall be suspended and

pending until the candidate complete the CPD points required

For Registered BS, license renewal is pending approval(required 20 points per year)

Page 14: BS M'sia

Attending seminar/talk/course/training/etc

CPD via points collection

Refer to guidelines

More details, follow this link

Page 15: BS M'sia

RISM Membership

Categories

CPD Points per

annum

Fellow (F) / RBS / PBS 20

Corporate (M) / RBS / PBS 20

Graduate (G) / GBS 15

Probationer (P) 10

• RBS = Registered Building Surveyor• PBS = Professional Building Surveyor• GBS = Graduate Building Surveyor

Page 16: BS M'sia

Date of Implementation: Jan 2012

Renewal: 31 Dec every year

CPD credit hours calculated in the current year of renewal shall be a rolling average of the one in the previous year i.e. For 2013, it can be counted from 2012 CPD program

NO double counting is allowed

CPD credit hours shall be submitted in the format as per form below

Page 17: BS M'sia

Failure to submit this form is non-compliance, even though the CPD hours collection is more than required

Page 18: BS M'sia
Page 19: BS M'sia
Page 20: BS M'sia
Page 21: BS M'sia
Page 22: BS M'sia