Upload
aidy
View
3.320
Download
4
Tags:
Embed Size (px)
DESCRIPTION
BasicAirportOperation - TerminalFacilities&Care
Citation preview
LEARNING & DEVELOPMENT MANAGEMENT LEARNING & DEVELOPMENT MANAGEMENT
Basic Airport OperationsBasic Airport OperationsTerminal Facilities & CareTerminal Facilities & Care
bybyHaji Ahmad Rafik bin Mohd TahirHaji Ahmad Rafik bin Mohd Tahir
Vision:
“To provide world class
airport
services
to all our customers”
Vision:
“To provide world class
airport
services
to all our customers”
2©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
Selamat DatangSelamat Datang
At the end of the lecture, you will be able to understand:
Functions & responsibilities,Functions & responsibilities,Operations,Operations,Set-up and planningSet-up and planningFacilities, O & MFacilities, O & M
ENGINEERING DIVISION – Terminal FacilitiesENGINEERING DIVISION – Terminal Facilities
3©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
Malaysia Airport (Sepang) Sdn BhdMalaysia Airport (Sepang) Sdn Bhd
L E G A LS E C R E T A R IA T
Q U A L IT YA S S U R A N C E
A IR P O RTO P E R A T IO NS
C E N T RE(A O C )
T E R M IN A LS E R V IC ES
A IR S ID E S V CSF LIG HT
O P E R A T IONC E N T RE
S E N IO RM A N A G E R
O P E R A T IO NS
LO G IS T IC
F A SS
O P E R A T IO NS
M A N A G E RA V S E C
IN FRASTR UC TU RE
A G L/E P S &G A S S YS T E MS
E N G IN E E R INGS U P P O RT
R E P A IRM A IN T E N A N CE
O FV E H IC LES
S E N IO RM A N A G E R
E N G IN E E R ING(A irside Fac i li t ies)
B H SS E C U R ITYS Y S TE MS
T TS
M T B /C P/S A T E LLITE
M O S Q U E
P LB &cO M M U N IC A T IO N
S E N IO RM A N A G E R
E N G IN E E R ING(T e rm ina l Fac i l it ies)
T E R M IN A LC O N C E S S ION
A D V E R T IS INGP R O M O T IO N
B U S IN E SSD E V E LO P M E NT
M A N A G E RC O M M E R C IA L
T E R M IN A L
F IREP R E V E N T IONO P E R A T IO N &
T E C H N IC AL
S T A N D A RDT R A IN ING
A N DLO G IS T IC
M A N A G E RA F R S
M A R K E T ING
P U B LICR E LA T IO NS
S E N IO RM A N A G E R
M A R K E T IN G& P R
PR O CU R EMENTC O NTRACT
IN VEN TOR Y MGT& INSUR AN CE
BU DG ETING &FINANC E PLAN NING
& C ASH MGT
F IN A N C IALS Y S TE M &A C C O U NT
S E N IO RM A N A G E RF IN A N C E
E M P LO Y EER E LA T ION
G E N E R ALA D M IN IST R AT IO N
M A N A G E RH U M A N
R E S O U R C E S
B U S IN E SSC E N T RE
F R O NTO F F ICE
H O U S EK E E P ING
M A N A G E RA IR S IDET R A N S IT
H O T E L
B ILLIN G
O P E R A T IO NS
AD MIN ISTRATIO NS
M A N A G E RF R E E
C O M M E R C IA LZ O N E
LA N D S ID EP R O PE R TY
C A R P A RKM A N A G E M E NT
S C AF
M A N A G E RC O M M E R C IA L
L A N S ID E
SENIO R G ENERALM ANAG ER
4©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
ENGINEERINGENGINEERING(TERMINAL FACILITIES)(TERMINAL FACILITIES)
Track Transit SystemTrack Transit SystemManagerManager
SecretarySecretary
Main Terminal BuildingMain Terminal Building
Contact PierContact Pier
Satellite 'A' BuildingSatellite 'A' Building
Motor Transport WorkshopMotor Transport Workshop
MTB/SAT/MTWMTB/SAT/MTWManagerManager
Trunk Radio SystemTrunk Radio System
SENIOR MANAGER ENGINEERINGSENIOR MANAGER ENGINEERING
TERMINAL FACILITIES DIVISIONTERMINAL FACILITIES DIVISION
BHS/SSBHS/SSManagerManager
PLBPLBManagerManager
Ground Power UnitGround Power Unit
Pre Conditioned AirPre Conditioned Air
CommunicationsCommunications
PABXPABX
Visual Docking GuidanceVisual Docking Guidance
Passenger Passenger LoadingLoadingBridgesBridges
CCR Operation/Sec. CCR Operation/Sec. Sys.Sys.
EPS / PLC EPS / PLC
TTS OperationsTTS Operations
TTS Support UnitTTS Support Unit
Mechanical SystemMechanical System
Planning/Tub/Planning/Tub/WorshopWorshop
7©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
SCOPE OF WORKSSCOPE OF WORKS
OPERATION AND MAINTENANCE OF BUILDING OPERATION AND MAINTENANCE OF BUILDING MECHANICAL AND ELECTRICAL SYSTEM AT MAIN MECHANICAL AND ELECTRICAL SYSTEM AT MAIN TERMINAL BUILDING, CONTACT PIER AND SATELLITE TERMINAL BUILDING, CONTACT PIER AND SATELLITE BUILDINGBUILDING
MAINTENANCE OF BUILDING STRUCTURE, CIVIL AND MAINTENANCE OF BUILDING STRUCTURE, CIVIL AND ARCHITECTURAL FINISHES AT MAIN TERMINAL ARCHITECTURAL FINISHES AT MAIN TERMINAL BUILDING, CONTACT PIER AND SATELLITE BUILDINGBUILDING, CONTACT PIER AND SATELLITE BUILDING
MAINTENANCE OF SUPPORT VEHICLES AND MAINTENANCE OF SUPPORT VEHICLES AND OPERATION VEHICLESOPERATION VEHICLES
PROVIDE TECHNICAL INPUT IN ENHANCEMENT WORK PROVIDE TECHNICAL INPUT IN ENHANCEMENT WORK AND DEVELOPMENT WORKAND DEVELOPMENT WORK
9©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
MAIN TERMINAL BUILDING
6 LEVELS TOTAL FLOOR AREA – 241,000 SQM
CONTACT PIER 4 LEVELS TOTAL FLOOR AREA – 95,000 SQM
SATELLITE “A” BUILDING 4 LEVELS TOTAL FLOOR AREA – 143,404 SQM
EXTERNAL FINISHES WALL CONCRETE WALL DOUBLE GLAZE GLASS WALL
ROOF INTERNAL FINISHES
FLOOR CARPET, GRANITE, VINYL,
TILES PARTITION BRICK WALL, PLASTER BOARD CEILING TIMBER PANELING
BUILDING DATABUILDING DATA ARCHITECTURAL FINISHESARCHITECTURAL FINISHES
10©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
11©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
MECHANICAL MECHANICAL SYSTEMSYSTEM
DESIGN CONCEPTDESIGN CONCEPT : ENERGY SAVINGENERGY SAVING FUTURE EXPANSION FUTURE EXPANSION PROVISION FOR RECYCLED PROVISION FOR RECYCLED
WATERWATER
AIR CONDITIONING AND AIR CONDITIONING AND MECHANICAL VENTILATION MECHANICAL VENTILATION SYSTEMSYSTEM
PLUMBING SYSTEMPLUMBING SYSTEM FIRE PROTECTION FIRE PROTECTION
SYSTEMSYSTEM FIRE ALARM SYSTEMFIRE ALARM SYSTEM WASTE COLLECTION WASTE COLLECTION
SYSTEMSYSTEM ELEVATORSELEVATORS,
ESCALATORS AND ESCALATORS AND TRAVELLATORSTRAVELLATORS
FIRE VEHICLESFIRE VEHICLESULTRA LARGE FIRE TENDER 8X8ULTRA LARGE FIRE TENDER 8X8EMERGENCY RESCUE VEHICLEEMERGENCY RESCUE VEHICLECOMMAND CONTROL VEHICLECOMMAND CONTROL VEHICLETURN TABLE LADDERTURN TABLE LADDERWATER TENDERWATER TENDERAMBULANCE AMBULANCE RUNWAY SWEEPERS, ROAD SWEEPER AND RUNWAY SWEEPERS, ROAD SWEEPER AND SCRUBBERSSCRUBBERSRUNWAY FRIICTION TESTERRUNWAY FRIICTION TESTERLIGHT VEHICLES I.E VANS, CARS, 4X4 ETCLIGHT VEHICLES I.E VANS, CARS, 4X4 ETC
OPERATION AND SUPPORT OPERATION AND SUPPORT VEHICLESVEHICLES
12©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
13©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
AIR CONDITIONING &AIR CONDITIONING &MECHANICAL VENTILATION SYSTEMMECHANICAL VENTILATION SYSTEM
AIR CONDITIONING SYSTEMAIR CONDITIONING SYSTEM CHILLED WATERCHILLED WATER AIR DISTRIBUTION SYSTEM FOR AIR CONDITIONING SYSTEM AIR DISTRIBUTION SYSTEM FOR AIR CONDITIONING SYSTEM FAN COIL UNITSFAN COIL UNITS SPOT COOLING SYSTEMSPOT COOLING SYSTEM.. CHILLEDCHILLED WATER PUMPWATER PUMP
MMECHANICAL VENTILATION SYSTEMECHANICAL VENTILATION SYSTEM SMOKE EXTRACTION SYSTEMSMOKE EXTRACTION SYSTEM PRESSURIZATION SYSTEMPRESSURIZATION SYSTEM SMOKE SPILL SYSTEMSMOKE SPILL SYSTEM
CONTROL SYSTEM CONTROL SYSTEM
INTERFACING WITH BMS SYSTEMINTERFACING WITH BMS SYSTEM
14©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
ZONING ZONING CONCEPTCONCEPT
PUBLIC AREAPUBLIC AREA
OFFICESOFFICES
CONCESSIONCONCESSION
PUBLIC AREAPUBLIC AREA
PLANT AREAS AT THE GROUND LEVELPLANT AREAS AT THE GROUND LEVEL
CONSTANT AIR VOLUME CONSTANT AIR VOLUME
OFFICES AND CONCESSIONOFFICES AND CONCESSION AIR HANDLERS ARE LOCATED ADJACENT TO THE AIR HANDLERS ARE LOCATED ADJACENT TO THE
SERVED SERVED AREA AREA
VARIABLE AIR VOLUMEVARIABLE AIR VOLUME
MAIN TERMINAL BUILDINGMAIN TERMINAL BUILDING -- 147 147 Nos.Nos.
CONTACT PIERCONTACT PIER -- 147 Nos.147 Nos.
SATELLITE BUILDING SATELLITE BUILDING -- 136 Nos.136 Nos.
AIR DISTRIBUTION SYSTEMAIR DISTRIBUTION SYSTEM
15©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
TO TO RETURNRETURN CHILLED WATER TO GAS DISTRICT CHILLED WATER TO GAS DISTRICT COOLINGCOOLING
MAIN TERMINAL BUILDING -MAIN TERMINAL BUILDING - 4 DUTY, 2 STANDBY4 DUTY, 2 STANDBY
CONTACT PIERCONTACT PIER - - 4 DUTY, 2 4 DUTY, 2 STANDBYSTANDBY
SATELLITE ‘A’ BUILDING SATELLITE ‘A’ BUILDING - - 4 DUTY, 2 4 DUTY, 2 STANDBYSTANDBY
CHILLED PIPING CONFIGURATIONCHILLED PIPING CONFIGURATION
MAIN TERMINAL BUILDINGMAIN TERMINAL BUILDING - - TWO PIPE SYSTEM TWO PIPE SYSTEM
CONTACT PIER AND SATELLITE BUILDING - CONTACT PIER AND SATELLITE BUILDING - THREE PIPE THREE PIPE REVERSE RETURN REVERSE RETURN
SECONDARY CHILLED WATER SYSTEMSECONDARY CHILLED WATER SYSTEM
16©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
MECHANICAL VENTILATION SYSTEMMECHANICAL VENTILATION SYSTEM
NORMAL VENTILATION NORMAL VENTILATION SYSTEMSYSTEM
NON AIR-CONDITIONED OR NOT NON AIR-CONDITIONED OR NOT NATURALLY VENTILATED AREANATURALLY VENTILATED AREA
EXHAUST SYSTEM - HEPA EXHAUST SYSTEM - HEPA FILTERS FOR QUARATINE AREA FILTERS FOR QUARATINE AREA
SMOKE EXTRACTIONS SMOKE EXTRACTIONS SYSTEMSYSTEM
LOUNGES, OFFICES AND LOUNGES, OFFICES AND CONCESSION AREASCONCESSION AREAS
SMOKE REMOVAL AT CERTAIN SMOKE REMOVAL AT CERTAIN PUBLIC AREASPUBLIC AREAS
KITCHEN EXTRACTION SYSTEMKITCHEN EXTRACTION SYSTEM MAIN TERMINAL BUILDING - 182 MAIN TERMINAL BUILDING - 182
NOS.NOS. CONTACT PIER CONTACT PIER - 59 NOS - 59 NOS SATELLITE ‘A’ BUILDINGSATELLITE ‘A’ BUILDING - -
110 NOS110 NOS
PRESSURIZATION SYSTEMPRESSURIZATION SYSTEM ENCLOSED ESCAPE ROUTESENCLOSED ESCAPE ROUTES
17©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
18©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
FIRE PROTECTION SYSTEMFIRE PROTECTION SYSTEM
AUTOMATIC SPRINKLER SYSTEMAUTOMATIC SPRINKLER SYSTEM ORDINARY HAZARD GROUP 111 ORDINARY HAZARD GROUP 111
CLASSIFICATION (0113)CLASSIFICATION (0113) TANK 75000 LITRESTANK 75000 LITRES 2 PUMPSET SYSTEM FOR MAIN 2 PUMPSET SYSTEM FOR MAIN
TERMINAL BUILDINGTERMINAL BUILDING 1 PUMPSET SYSYTEM EACH 1 PUMPSET SYSYTEM EACH
FOR CONTACT PIER AND FOR CONTACT PIER AND SATELLITE BUILDINGSATELLITE BUILDING
PRESSURISED HYDRANT SYSTEMPRESSURISED HYDRANT SYSTEM
TANK 11400 LITRESTANK 11400 LITRES DIRECT TAPPING FROM MAIN DIRECT TAPPING FROM MAIN
AND BYPASS PIPELINEAND BYPASS PIPELINE HYDRANT RING WITH PILLARS HYDRANT RING WITH PILLARS
AT 90 M APARTAT 90 M APART DRY RISER SYSTEMDRY RISER SYSTEM ESCAPE STAIRCASEESCAPE STAIRCASE
SPRINKLER SYSTEM – CLASS SPRINKLER SYSTEM – CLASS ORDINARY HAZARD CLASS IIIORDINARY HAZARD CLASS III
DRY RISER SYSTEMDRY RISER SYSTEM HYDRANT SYSTEM (AT PERIMETER HYDRANT SYSTEM (AT PERIMETER
OF BUILDING ONLY).OF BUILDING ONLY). ADDRESSABLE FIRE ALARM AND ADDRESSABLE FIRE ALARM AND
DETECTION SYSTEM.DETECTION SYSTEM. FIXED GAS SYSTEM (CO2,,WET FIXED GAS SYSTEM (CO2,,WET
CHEMICAL, INERGEN).CHEMICAL, INERGEN). PORTABLE FIRE EXTINGUISHERS.PORTABLE FIRE EXTINGUISHERS. CONTROL SYSTEMS CONTROL SYSTEMS INTERFACING WITH THE BMS INTERFACING WITH THE BMS
SYSTEM.SYSTEM.HYDRAULIC HOSEREEL SYSTEMHYDRAULIC HOSEREEL SYSTEM AS FIRST-AID SYSTEM SYSTEM WITH FLOWRATE 150 L/MAS FIRST-AID SYSTEM SYSTEM WITH FLOWRATE 150 L/M WATER STORAGE TANK OF 9100 LITRES AT GROUND WATER STORAGE TANK OF 9100 LITRES AT GROUND LEVELLEVEL LOCATED AT 60 METRES APARTLOCATED AT 60 METRES APARTFIXED GAS SYSTEMFIXED GAS SYSTEM CO2 GAS SYSTEM FOR ELECTRICAL ROOMCO2 GAS SYSTEM FOR ELECTRICAL ROOM INERGEN SYSTEM FOR COMPUTER AND CONTROL ROOMINERGEN SYSTEM FOR COMPUTER AND CONTROL ROOM WET CHEMICAL SYSTEM FOR KITCHENWET CHEMICAL SYSTEM FOR KITCHENFIRE AND ALARM SYSTEMFIRE AND ALARM SYSTEM ONE MAIN CONTROL ROOM AT MAIN TERMINAL BUILDINGONE MAIN CONTROL ROOM AT MAIN TERMINAL BUILDING SUB-CONTROL ROOMS AT CONTACT PIER AND SATELLITE SUB-CONTROL ROOMS AT CONTACT PIER AND SATELLITE BUILDINGBUILDING INTERFACE WITH BMS AND TAMSINTERFACE WITH BMS AND TAMSFIRE EXTINGUISHERFIRE EXTINGUISHER
19©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
PLUMBING SYSTEMPLUMBING SYSTEM INCOMING PIPEWORK FROM MAIN INCOMING PIPEWORK FROM MAIN
RETICULATION PIPE SYSTEMRETICULATION PIPE SYSTEM DOMESTIC WATER SYSTEM – DOMESTIC WATER SYSTEM –
POTABLE, BASIN, & WC POTABLE, BASIN, & WC HOT WATER SYSTEM HOT WATER SYSTEM PUMP SYSTEM - POTABLE WATER, PUMP SYSTEM - POTABLE WATER,
DOMESTIC WATER SYSTEM, DOMESTIC WATER SYSTEM, DRAINAGE SUMP PUMP SYSTEMDRAINAGE SUMP PUMP SYSTEM
CONTROL SYSTEMCONTROL SYSTEM SANITARY SYSTEM SANITARY SYSTEM INTERFACING WITH BMS SYSTEM INTERFACING WITH BMS SYSTEM
COLD WATERCOLD WATER NO WATER SORAGE TANK AT TERMINAL NO WATER SORAGE TANK AT TERMINAL
COMPLEXCOMPLEX DIRECT TAPPING FROM EXTERNAL MAIN DIRECT TAPPING FROM EXTERNAL MAIN
PIPEPIPE AFTER THE BULK METER, PIPE BRANCHES AFTER THE BULK METER, PIPE BRANCHES
INTO THREE.INTO THREE. i) KITCHEN/FOOD OUTLETi) KITCHEN/FOOD OUTLET ii) TOILET BASINii) TOILET BASIN iii) WATER CLOSET/URINALiii) WATER CLOSET/URINAL FUTURE CONNECTION TO RECYCLED WATER FUTURE CONNECTION TO RECYCLED WATER
SYSTEMSYSTEM ESTIMATED DAILY WATER CONSUMPTION ESTIMATED DAILY WATER CONSUMPTION
FOR 25 MPPA IS 6.39 MILLION LITRESFOR 25 MPPA IS 6.39 MILLION LITRES
SANITARY PLUMBING SERVICESSANITARY PLUMBING SERVICES FULLY VENTED ONE PIPE SYSTEM FOR SOIL FULLY VENTED ONE PIPE SYSTEM FOR SOIL
AND WASTE PIPESAND WASTE PIPES KITCHEN SEWAGE TREATMENT SYSTEMKITCHEN SEWAGE TREATMENT SYSTEM FINAL CONNECTION TO THE CIVIL MANHOLEFINAL CONNECTION TO THE CIVIL MANHOLE ESTIMATED DAILY SEWER DISCHARGE FOR ESTIMATED DAILY SEWER DISCHARGE FOR
25 MPPA IS 5.94 MILLION LITRES.25 MPPA IS 5.94 MILLION LITRES.
HYDRAULIC SERVICESHYDRAULIC SERVICES
20©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
21©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
ESCALATORESCALATOR TYPE OF SERVICETYPE OF SERVICE -- PASSENGERPASSENGER TYPE OF OPERATIONTYPE OF OPERATION -- ELECTRICELECTRIC MAIN TERMINAL BUILDINGMAIN TERMINAL BUILDING -- 29 NOS29 NOS CONTACT PIERCONTACT PIER -- 41 NOS41 NOS SATELLITE ‘A’ BUILDING SATELLITE ‘A’ BUILDING -- 22 NOS22 NOS
TRAVELLATORTRAVELLATOR TYPE OF SERVICETYPE OF SERVICE -- PASSENGERSPASSENGERS TYPE OF OPERATIONTYPE OF OPERATION -- ELECTRICELECTRIC MAIN TERMINAL BUILDINGMAIN TERMINAL BUILDING - - 8 NOS 8 NOS CONTACT PIERCONTACT PIER -- 46 NOS46 NOS SATELLITE ‘A’ BUILDING SATELLITE ‘A’ BUILDING -- 20 NOS20 NOS
ELEVATORELEVATOR TYPE OF SERVICETYPE OF SERVICE - - PASSENGERS, EMPLOYEE AND PASSENGERS, EMPLOYEE AND
GOODSGOODS TYPE OF OPERATION TYPE OF OPERATION - - HYDRAULICS AND HOISTWAYHYDRAULICS AND HOISTWAY MAIN TERMINAL BUILDING MAIN TERMINAL BUILDING -- 47 NOS.47 NOS. CONTACT PIER CONTACT PIER -- 43 NOS.43 NOS. SATELLITE ‘A’ BUILDINGSATELLITE ‘A’ BUILDING -- 20 NOS20 NOS
22©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
23©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
WASTE COLLECTION SYSTEM (VACUUM)WASTE COLLECTION SYSTEM (VACUUM)
RUBBISH COLLECTION SYSTEMRUBBISH COLLECTION SYSTEM DUST CHUTE WITH LOADING DUST CHUTE WITH LOADING
DOORSDOORS TRANSFER PIPESTRANSFER PIPES SEPARATOR AND BAG FILTERSSEPARATOR AND BAG FILTERS VACUUM BLOWERSVACUUM BLOWERS COMPACTORS AND CONTAINERSCOMPACTORS AND CONTAINERS
COMMON EQUIPMENT FOR COMMON EQUIPMENT FOR RUBBISH AND KITCHEN RUBBISH AND KITCHEN WASTEWASTE
SUPERVISORY AND CONTROL SUPERVISORY AND CONTROL PANELSPANELS
KITCHEN WASTE COLLECTION KITCHEN WASTE COLLECTION SYSTEMSYSTEM• LOADING HOPPERSLOADING HOPPERS• TRANSFER PIPESTRANSFER PIPES• RECEIVING TANKS AND RECEIVING TANKS AND
FILTERSFILTERS• VACUUM BLOWERSVACUUM BLOWERS• STORAGE HOPPERSSTORAGE HOPPERS• CONTAINERSCONTAINERS
24©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
25©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
DESIGN CONCEPTSDESIGN CONCEPTSMODULAR MODULAR
RELIABILITYRELIABILITY
RESTORATION OF SERVICERESTORATION OF SERVICE
MAINTENANCEMAINTENANCE
PROVISION FOR EXPANSIONPROVISION FOR EXPANSION
SPECIAL REQUIREMENTSSPECIAL REQUIREMENTSPARALLEL REDUNDANT SYSTEMSPARALLEL REDUNDANT SYSTEMS
ARCHITECT’S PREFERRED LIGHTING ARCHITECT’S PREFERRED LIGHTING DESIGNDESIGN
ELECTRICAL & COMMUNICATION SYSTEMSELECTRICAL & COMMUNICATION SYSTEMS
ELECTRICAL SYSTEMELECTRICAL SYSTEMHIGH VOLTAGE 11 KV SYSTEM HIGH VOLTAGE 11 KV SYSTEM
AUTOMATIC STANDBY POWER AUTOMATIC STANDBY POWER GENERATOR SYSTEMGENERATOR SYSTEM
LV 415V/240V AND LIGHTING SYSTEM LV 415V/240V AND LIGHTING SYSTEM
EARTHING SYSTEMEARTHING SYSTEM
UNINTERRUPTIBLE POWER SYSTEMUNINTERRUPTIBLE POWER SYSTEM
LIGHTNING PROTECTION SYSTEMLIGHTNING PROTECTION SYSTEM
COMMUNICATION COMMUNICATION SYSTEMSSYSTEMS
TELEPHONE SERVICE SYSTEMTELEPHONE SERVICE SYSTEM
PUBLIC ADDRESS SYSTEMPUBLIC ADDRESS SYSTEM
INTERCOMMUNICATION INTERCOMMUNICATION SYSTEMSYSTEM
FIREMEN COMMUNICATION FIREMEN COMMUNICATION SYSTEMSYSTEM
MASTER ANTENNAE TV MASTER ANTENNAE TV SYSTEM SYSTEM
MASTER ELECTRIC CLOCK MASTER ELECTRIC CLOCK SYSTEMSYSTEM
28©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
PASSENGER LOADING PASSENGER LOADING BRIDGESBRIDGES
APRON GROUND APRON GROUND SERVICESSERVICES
COMMUNICATION COMMUNICATION SYSTEMSYSTEM
30©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
PLB & Apron Services and Comms UnitPLB & Apron Services and Comms UnitArea of ResponsibilityArea of Responsibility
PLBPassenger Loading BridgesGround Power Unit Pre Conditioned AirVisual Docking Guidance
SystemFire Foam SystemPotable Water System
COMMSTrunk Radio SystemPrivate Automated Branch Exchanged (PABX)
31©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
MaintenancMaintenancee
PLBAll maintenance work are carried out by in-house maintenance team.
COMMSAll maintenance work – outsourcedTRS – Motorola Technology Sdn. Bhd.PABX – Teraju Teknik Sdn. Bhd.
32©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
PLB - PLB - EQUIPMENTEQUIPMENT
Passenger Loading Bridge passenger embark/disembark from aircraft
Visual Docking Guidance System provide Visual Docking Guidance System provide guidance to pilot during dockingguidance to pilot during docking
Pre Conditioned Air supply cool air to Pre Conditioned Air supply cool air to aircraftaircraft
Ground Power Unit supply power to Ground Power Unit supply power to aircraftaircraft
34©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W) Satellite ASatellite A
35©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W) PLBPLB
36©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
GATESGATES
Total Gates – 46
20 gates at Contact Pier
26 gates at Satellite A.
NLA – 5 gates SJS – 13 gates
J – 11 gates M – 6 gates
L – 1 gate S – 10 gates
37©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
Types of GatesTypes of Gates
NLANLA == 1 wide body or 2 narrow body 1 wide body or 2 narrow body aircraft at aircraft at any one time. Future new any one time. Future new large aircraft.large aircraft.
SJSSJS == 1 wide body or 2 narrow body 1 wide body or 2 narrow body aircraft at aircraft at any one time.any one time.
JJ == wide body aircraft. wide body aircraft.
L L = = up to MD11/DC10/B767 aircraftup to MD11/DC10/B767 aircraft
MM = = up to A300/B757 aircraftup to A300/B757 aircraft
SS == up to B737 aircraftup to B737 aircraft
38©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
A11 A9 A7 A5 A3 B3 B5 B7 B9
B11
S S S S S S S S S S
WEST ARM
CONTACT PIER
EAST ARM
SJS
SJS
SJS
SJS
NLA
NLA
SJS
SJS
SJS
SJS
A10 A8 A6 A4 A2 B2 B4 B6 B8
B10
GATE ALLOCATION - CPGATE ALLOCATION - CP
39©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
C37
NLA
C35 J SOUTH J C36
C33 M J C34
C31 M SJS C32
C26 C24 C22 C1 C3
J J SJS J SJS
TTS FROM
CP
C27 NLAEAST ARM
SATELLITE A
WEST ARM
J M M SJS J L
C25 C23 C21 C2 C4 C6
C12 SJS M C11
C14 J M C13
C16 J NORT
H J C15
NLA
C17
GATE ALLOCATION - GATE ALLOCATION - SATSAT
40©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
COMMS -COMMS -EQUIPMENTEQUIPMENT
Private Automated Branch Exchanged Private Automated Branch Exchanged (PABX)(PABX)
Trunk Radio System Trunk Radio System
41©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
AMC
68XXX69XXX
MTB-A
63XXX64XXX
MTB-B
65XXX66XXX
CP
61XXX
ENG
67XXX
SAT-A
61XXX62XXX
TelekomExchange
11 PRI10 PRI
CDR System
MTB-A
STCP POLICE AFRSASU
VVIP
VVIP
AWS
= DAU(Distributed Access Unit) Carried 30 Digital Line/Unit
2 E
1 L
ink
2 E
1 L
ink
2 E1 Link 1 E1 Link
4 E1 Link2 E1 Link
1 E
1 L
ink
2 E1 Link1 E1
1 E1
1 E11 E1 1 E1 1 E1
1 E1
KLIA INTEGRATED TELEPHONE SYSTEM(KITSKLIA INTEGRATED TELEPHONE SYSTEM(KITS))
CDR System
ENG-C
LANNEC M-150 NEC M-150 NEC M-150
NEC M-100NEC M-140NEC M-140
ABBREVIATIONABBREVIATION
AFRS - Airport Fire & Rescue Services AMC - Airport Management CenterASU - Airside Safety UnitAWS - Automated WarehouseCDR - Call Detail Recorder CP - Contact Pier (Building)DAU - Distributed Access UnitE1 Link - Electronic CircuitENG - Engineering ComplexLAN - Local Area NetworkMTB A - Main Terminal BuildingMTB B - Main Terminal BuildingPOLICE - Balai Polis KLIASAT A - Satellite (Building)STCP - Short Term Car ParkVVIP - Kompleks Bunga Raya
42©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
Antenna System
CH 1 CH 2 CH 3 CH 15
Channel Bank
EmbasyAEB
Audio Switch
Centrel Electronic
Bank
SmartZoneController
DWM X 4
Dist. Panel
CIU X 8
ChannelBank
8-CHMBX
PABX
Modem
BITRUNR
LoggingRecorder
Antenna System
CH 1 CH 2 CH 3 CH 15
DWM X 4TAMS
User Station
User Station
AOC ConsoleSOC Console
PDRM Console
SITE - 1 (AMC)SITE - 1 (AMC) SITESITE - 2 (ENG) - 2 (ENG)
KLIA TRSKLIA TRS
43©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
BAGGAGE BAGGAGE HANDLINGHANDLING
SYSTEM SYSTEM OVERVIEWOVERVIEW
45
Malaysia Airports Holdings Berhad (487092-W)
OUTLINESOUTLINES
BHS SYSTEMBHS SYSTEM• Features of BHS Features of BHS
OperationOperation• BHS FacilitiesBHS Facilities• System FlowSystem Flow• Baggage ScreeningBaggage Screening• ResponsibilitiesResponsibilities
46©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
BHS/SS - RESPONSIBILITYBHS/SS - RESPONSIBILITY
BHS OperationBHS Operation• OMT operations system monitoring and OMT operations system monitoring and
command; command; • IMT operations allocations of make-up chutes, IMT operations allocations of make-up chutes,
breakdown conveyors and reclaim carousels;breakdown conveyors and reclaim carousels;• M&E recovery operations miss-loading, M&E recovery operations miss-loading,
remaining, jamming, transportation error etc.;remaining, jamming, transportation error etc.;• Manning of MCT stations at NM and EBS andManning of MCT stations at NM and EBS and• Tubs circulation operations.Tubs circulation operations.
47©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
BHS/SS - RESPONSIBILITYBHS/SS - RESPONSIBILITY
Mechanical systemMechanical system68 km of conveyor belts, 1614 motorized 68 km of conveyor belts, 1614 motorized
carts, carts, 4704 electric motors, 30K pulleys and rollers4704 electric motors, 30K pulleys and rollers
Electrical systemElectrical systemPLC Network PLC Network
200 Control panels, 20K sensors200 Control panels, 20K sensorsEPS SystemEPS System
8 MDBs8 MDBs 37 LDBs37 LDBs
48©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
BHS/SS - RESPONSIBILITYBHS/SS - RESPONSIBILITY
SS equipment maintenance, namelySS equipment maintenance, namely 29 Vivid VIS-M X-Ray machines;29 Vivid VIS-M X-Ray machines; 3 Vivid Workstations (14 monitors);3 Vivid Workstations (14 monitors); 6 InVision X-Ray machines;6 InVision X-Ray machines; 20 Barringer Sniffer machines;20 Barringer Sniffer machines; 74 Rap 520 X-Ray machines;74 Rap 520 X-Ray machines; 10 Rap 528 X-Ray machines; and10 Rap 528 X-Ray machines; and 114 Walk thru metal detectors114 Walk thru metal detectors;;
49©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
OutsourceOutsource M&E recovery operationsM&E recovery operations Manual Coding Terminal Manual Coding Terminal
operationsoperations Tubs circulation operationsTubs circulation operations Maintenance of ICT equipment Maintenance of ICT equipment
In houseIn house Maintenance of BHS equipmentMaintenance of BHS equipment Maintenance of SS equipmentMaintenance of SS equipment
BHS/SS – O&M StrategyBHS/SS – O&M Strategy
50©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
BHS SYSTEMBHS SYSTEM
FEATURES OF BHS OPERATION • Operation hours
24 hours / day, 365 days / year
• Check-in ServiceAnytime, anywhere
• Baggage Sorting Controluses IATA License Plate Tagsuses automatic bar code scanner for automatic
sorting and reconciliation
51©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
BHS SYSTEMBHS SYSTEM
FEATURES OF BHS OPERATION (cont.) • Security
In-line baggage (ILB) screening 4 level of screening full baggage tracking and
reconciliation
• Make-up chutes assignment is according to flight,
class and other parameters
BHS FACILITIES • Comprise the
MTB Sat ‘A’, and BHS Tunnelsystem
• Control Room CCR in MTB SCR in Sat ‘A’
1. CHECK-IN POSITIONS Departure Level : 216
(6 islands)
Bus & Rail GL : 4 each STCP : 8 Arrival Level : 6 Sat A : 4 2. DEPARTURE MAKE-UP POSITIONS
MTB SAT A Total Chutes: 100
(108) 85 (96) 185 (204) Usable (total)
Flights: 33 28 61 (If 3 chutes/ flight)
3. BREAK-DOWN POSITIONS MTB SAT A Total 12 12 24
4. RECLAIMS International : 9 + 1 reclaims (10 flights) Domestic : 2 + 1 reclaims (6 flights)
FLOWFLOW
52©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
BAGGAGE FLOW DIAGRAM
53©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
MAIN TERMINAL BUILDINGMAIN TERMINAL BUILDING
54©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
SATTELITE BUILDINGSATTELITE BUILDING
55©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
BHS TUNNEL BHS TUNNEL SYSTEMSYSTEM
56©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
BHS SYSTEMBHS SYSTEM
SYSTEM FLOW• Capacity
Departure Capacity 14 400 bph
Arrival Capacity 26 400 bph
57©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
BHS SYSTEMBHS SYSTEM
SYSTEM FLOW (Cont.)• Baggage Flow
Departure Flow
Check-in, Baggage Screening, Main Sorter & Final Sorter
Arrival Flow
Breakdown, High-speed belt conveyor & Reclaim
Transfer Flow
Breakdown, Baggage Screening, Transfer Sorter & Final Sorter
58©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
BHS SYSTEMBHS SYSTEM
SYSTEM FLOW (Cont.)• Baggage Flow (Cont.)
OOG Flow
OOG conveyor line
59©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
STANDARD BAGGAGE STANDARD BAGGAGE DESIGN PROCESSING TIMEDESIGN PROCESSING TIME
Departure
MTB to MTB : 7 min.
MTB to Sat. : 17.5 min.
Arrival
MTB to Reclaim : 5 min.
Sat. to Reclaim : 17.5 min.
Transfer
MTB to MTB : 6 min.
MTB to/from Sat. : 17.5 min.Sat. to Sat. : 9 min.
60©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
SERVICE LEVEL STANDARDSERVICE LEVEL STANDARD
1. Check-in Service Operating Hours 24 hours
2. Operating Time of Check-in - International flight - Domestic flight
3 hours2 hours
3. Closing Time of Check-in - International flight - Domestic flight
30 min.20 min.
4. Required Baggage Delivery Time- International flight- Domestic flight
17.5 min.5 min.
61©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
SECURITY PROCESSSECURITY PROCESS
Hold Baggage Screening
- 4 stages of in-line screening- most advanced baggage
security system as recognized by U.S. FAA- Passenger profiling- Random selection- High risk/Threatened flight
62©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
FLOW DIAGRAM FOR IN-LINE SCREENINGFLOW DIAGRAM FOR IN-LINE SCREENING
Departure/TransferBags
Level 1 X-ray
Level 2 Work station
Level 3 CT scan
Level 4 Sniffer
Explosive ProofContainer
REJECT
REJECT
REJECT
REJECT
Final Sorter
CLEAR
CLEAR
CLEAR
CLEAR
Selected Bag as Level 1
63©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
DISTRIBUTION OF DISTRIBUTION OF RESPONSIBILITIESRESPONSIBILITIES
No.
Description
AgencyZ
1 Check-In MAS/KLAS/SQ
2 Security Screening MA Sepang
3 Early Baggage Storage MA Sepang
4 Make-up Chutes/ Breakdown Allocation
MA Sepang
64©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
No. Description Agency 5 Baggage Transfer MAS/KLAS/AA
6 Loading/Unloading to/from aircraft MAS/KLAS/AA
7 Transportation from Aircraft to Breakdown Areas
MAS /KLAS/AA
DISTRIBUTION OF RESPONSIBILITIESDISTRIBUTION OF RESPONSIBILITIES
65©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
CHECK-IN COUNTER SHOWING WEIGH, LABEL, CHECK-IN COUNTER SHOWING WEIGH, LABEL, INDEX & COLLECTING CONVEYORSINDEX & COLLECTING CONVEYORS
66©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
AUTOMATIC BARCODE READERS LEVEL 1 & HOLD BAGGAGE IN-AUTOMATIC BARCODE READERS LEVEL 1 & HOLD BAGGAGE IN-LINE SCREENING MACHINE AT MTB, MEZZANINE LEVEL FOR LINE SCREENING MACHINE AT MTB, MEZZANINE LEVEL FOR
CHECKED-IN BAGGAGECHECKED-IN BAGGAGE
67©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
OOG BAGGAGE CHECK-IN FACILITY AT MTBOOG BAGGAGE CHECK-IN FACILITY AT MTB
68©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
A CLOSE-UP VIEW OF 70m RECLAIM A CLOSE-UP VIEW OF 70m RECLAIM CAROUSEL AT MTB, ARRIVAL LEVELCAROUSEL AT MTB, ARRIVAL LEVEL
BHS CENTRAL CONTROL ROOM (CCR) AT MTB, GROUND FLOORBHS CENTRAL CONTROL ROOM (CCR) AT MTB, GROUND FLOOR
Main FunctionsMain Functions
•Allocations of make-up Allocations of make-up chutes, breakdown conveyors chutes, breakdown conveyors and reclaim Carousels; andand reclaim Carousels; and
• Systems recoverySystems recovery
70©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
BAGGAGE RECONCILIATION MONITOR AND BARCODE BAGGAGE RECONCILIATION MONITOR AND BARCODE SCANNERSCANNER
71©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
SCANNING RESULTS ON RECONCILIATION MONITOR FORSCANNING RESULTS ON RECONCILIATION MONITOR FORA CORRECTLY SORTED BAGA CORRECTLY SORTED BAG
72©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
FINAL SORTER FS1 AT MTB GROUND LEVELFINAL SORTER FS1 AT MTB GROUND LEVELin the front is the dynamic flight sign panelin the front is the dynamic flight sign panel
73©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
FINAL SORTER FS1 SHOWING MAKE-UP CHUTES AND STAGING RACKSFINAL SORTER FS1 SHOWING MAKE-UP CHUTES AND STAGING RACKS
74©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W) MS 2 FAILURE JANUARY 2004MS 2 FAILURE JANUARY 2004
75©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W) MS 2 FAILURE JANUARY 2004MS 2 FAILURE JANUARY 2004
76©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W) MS 2 FAILURE JANUARY 2004MS 2 FAILURE JANUARY 2004
77©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W) MS 2 FAILURE JANUARY 2004MS 2 FAILURE JANUARY 2004
78©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
THE TRACK THE TRACK TRANSIT TRANSIT SYSTEMSYSTEM
80©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W) SYSTEM OVERVIEWSYSTEM OVERVIEW
Fully automated computer controlledTransportation over elevated guideway between the Contact Pier and Satellite ADedicated Track consisting of two dual direction guide waysi.e. Guideway 1 and Guideway 2Train can operate in automatic or in manual modes
81©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
SYSTEM OVERVIEWSYSTEM OVERVIEW
Manual mode to restore serviceLength of each lane - 1280 metersFour CX-100 vehicles, two for each guidewayOperates as two (2) - Vehicle Trains, one train on each guidewayAllows for expansion by adding a third vehicle to each train i.e. three (3) - Vehicle Trains
82©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
OPERATING MODESOPERATING MODES
Synchronized Double Shuttle Mode5:00 a.m. – 12:00 p.m.
Offset Synchronized Double Shuttle Mode Single Shuttle Mode
10:30 a.m. – 11:30 a.m. & 01:00 p.m. -02:00 p.m.
Unsynchronized Double Shuttle Mode On-Call Mode
12:00 p.m. – 5:00 a.m.
The Central Operator selects the operating mode for each guideway
83©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
MAINTENANCMAINTENANCEE
Maintenance Works by In-House Maintenance Team Except
Substations Gen-set Uninterruptible Power Supply (UPS)
84©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
ON-GOING PROJECTON-GOING PROJECT
Expansion of the TTS from a two (2)-vehicle trains to a Three (3) vehicle trainDate of completion in July 2005
85©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
FUTURE FUTURE PROJECTPROJECT
A Spurline Expansion ProjectElectrical & Mechanical (E&M)
One (1) 3-Vehicle Trains (CX- 100 Vehicles)Automatic Train Control (ATC) expansionPower supply and Distribution expansionMaintenance Depot Equipment – Storage facilityCentral Control Screen upgrades
Civil325 meters of elevated guidewayMaintenance depot buildingActivate one existing switchInstall crossoverInstall 2 switches in maintenance area
86©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
THE TRACK TRANSIT SYSTEMTHE TRACK TRANSIT SYSTEM
87©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
THE TRACK TRANSIT THE TRACK TRANSIT SYSTEMSYSTEM
88©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
THE TRACK TRANSIT SYSTEMTHE TRACK TRANSIT SYSTEM
89©2004 All Rights Reserved. Learning & Development Mgmt.
Malaysia Airports Holdings Berhad (487092-W)
End of End of PresentationPresentation