View
375
Download
4
Tags:
Embed Size (px)
DESCRIPTION
Citation preview
Electric Vehicles: Powering Up and Charging Forward
Andy Hoskinson
September 16, 2010
• $230 million• 6 States & DC• Nissan Leaf / Chevy Volt• Approx. 8000 EVs• Over 15,000 EVSE
•EV Project in San Diego
•EV Chargers
•1000+ residential Level 2 EV chargers free for EV Project Participants
•1,450 Publicly Available Level 2 EV chargers
•60 Commercial DC Fast Chargers
•Infrastructure Planning – 2010 Jan through Sept
•Installations – November 2010 through June 2011
•Data collection – July 2011 through December 2012
•EV Project in San Diego (continued)
•City permitting coordination
•Permit processes
•Requirements
•Installations by professional contractor network managed by ECOtality
Charging Network
Electric Vehicles: Powering Up and Charging Forward
Andy Hoskinson
September 16, 2010