Pre-Production

Style sheet

Layout 1This is the colour of the text I will use and the style of text.

I like this style of lay out because the title is bold and stands out at the top. Also I like that the director is at the bottom left because it fits in there well to fill in the empty space.

Layout 2

I would like to make the revile behind the actor as the walk by the camera. To make the title scene and the opening clip.

I would like to do it like layout 1 but also use this way to revile the title.

Props & LocationsProps/Costume needed Locations needed

None Bramham house

Camera The hut in Tadcaster

Tripod Tadcaster woods

microphone Sutton tunnel

Bramham woods around Bramham house

Contingency PlanningPotential Issue Solution

if the weathers bad. it would make my film look scarier and better.

if I lost footage and couldn’t go back to that location for some reason.

I know the people that live in tadcaster mansion so I could ask if we could film in the abandon part of the house.

if the actor didn’t turn up. ring another person to come do it.

if couldn’t finish editing in time. go to the learning centre and finish it there.

if run out of food and people are getting hungry or thirsty.

stop the shoot and go get food and drink.

sound could be too loud and messed up. make sure sound is the correct level.

Health and SafetyPotential Issue How will the issue be

avoided?

ScheduleDay Plan of Action Resources Required

Day 1 plan out the shots I want to get pen and paper

Day 2 find locations to fit the shots I want to get internet, transport to get to locations (bike or on foot)

Day 3 get opening shots and the shots I want at this one location

camera, tripod

Day 4 next locations and get the shots for that camera, tripod

Day 5 next locations and get the shots for that get the finale shots

camera, tripod camera, tripod

Day 6 make the script for the voice over get actor to record the voice over

pen and paper microphone and

computer

Day 7 edit computer

Day 8 edit computer