Project SLOPE 1 WP 7 – Piloting the SLOPE demonstrator Technical Meeting 5 Jul 16

4th Technical Meeting - WP7

Embed Size (px)

Citation preview

Page 1: 4th Technical Meeting - WP7

Project SLOPE1

WP 7 – Piloting the SLOPE demonstrator

Technical Meeting 5 Jul 16

Page 2: 4th Technical Meeting - WP7

Project SLOPE

T.7.3 – Trials and validation cycle

Trento, July 2016

Kühmaier Martin, Pichler Gerhard, Kastner Maximilian Institute of Forest EngineeringUniversity of Natural Resources and Life Sciences, Vienna

Picchi GianniCNR IVALSA

Umberto di StasoFondazione Graphitech

Technical Meeting 5 Jul 16

Page 3: 4th Technical Meeting - WP7

Contents of the presentation

1. Overview

2. Introduction

3. Survey site Annaberg

4. Performed activities on the survey site I

5. Survey site Montesover (Sover)

6. Performed activities on the survey site II

7. Prospective plans for the harvesting demo

8. Time study Sover

9. Deliverable D7.031

Technical Meeting 5 Jul 16

Page 4: 4th Technical Meeting - WP7

1. Overview

• Status: in progress• Length: until month 36• Involved Partners Leader: BOKU Participants: GRAPHITECH, CNR, COMBOLAB, MHG, BOKU,

GRE, TRE, ITENE Aim: Trials and validation of the SLOPE system on survey sites

in Austria and Italy• Outputs: Deliverables D7.031, D7.032, D7.04 and D7.05

Technical Meeting 5 Jul 16

Page 5: 4th Technical Meeting - WP7

2. Introduction

• The objective of this task is to validate the new SLOPE system in a mountainous forest scenario

• The new system will be currently tested in Sover (Italy) and in Annaberg (Austria) in autumn 2016

• The efficiency of the SLOPE system will be measured by methods which were explained in D7.02

• This should lead to the strengths and weaknesses of the new system and support improvement

Technical Meeting 5 Jul 16

Page 6: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

Deliverables Progress

100 100

0 0 0 0

75

00

10

20

30

40

50

60

70

80

90

100

D7.0

1 Pr

otoc

ol fo

rth

e de

finiti

on o

fev

alua

tion

met

hodo

logy

(BO

KU)

D7.0

2 Pr

otoc

ol fo

rth

e ex

perim

enta

lde

sign

of

dem

onst

ratio

nac

tiviti

es (B

OKU

)

D7.0

4 De

mo

repo

rtfo

r qua

lity

cont

rol

(BO

KU)

D7.0

5 De

mo

repo

rtfo

r tim

ber s

uppl

ype

rfor

man

ce &

ERP

(CN

R)

D7.0

6 Re

port

s and

man

uals

for o

ff-th

e-jo

b tr

aini

ng (C

NR)

D7.0

7 M

anua

ls,

guid

elin

es a

ndle

arni

ng p

acka

ges

for o

n-th

e-jo

btr

aini

ng (C

NR)

D7.0

31 D

emo

repo

rtfo

r dat

a co

llect

ion

I(G

RAPH

ITEC

H)

D7.0

32 D

emo

repo

rtfo

r dat

a co

llect

ion

II(M

HG)

Deliverables Status

Page 7: 4th Technical Meeting - WP7

3. Survey site Annaberg

• Study site is located in the Austrian province Salzburg, in the village Annaberg im Lammertal

• Survey area (8 ha) lies on Promberg (905 m - 1144 m)• SLOPE harvesting area (0.42 ha; 1031 m - 1128 m)

Technical Meeting 5 Jul 16

Page 8: 4th Technical Meeting - WP7

3. Survey site Annaberg

• SLOPE harvesting area (0.42 ha; first section): first 200 m x 30 m section is the SLOPE harvesting area UAV+TLS survey was performed in autumn 2015 northwest exposed slope range of 60 % - 100 % small flatter part in the upper sector 30 % - 60 % 90 % spruce; 10 % firs and larches spread over the harvesting area 80 years old stock: 466 m3

number of stems: 345 basal area: 34.8 m2

mean dbh: 33.7 cm mean hight (hLorey): 30.2 m yield class spruce: 15.4 m3/ha/year

Technical Meeting 5 Jul 16

Page 9: 4th Technical Meeting - WP7

3. Survey site Annaberg

• SLOPE harvesting area (0.42 ha; first section): Preliminary clearing: Extraction of about 115 RFID marked trees

(150 m3) → this is about a third of the standing trees

• Additional harvesting area ÖBF agreement (second section): Also 200 m x 30 m about half a hectare Same forest stand characteristics Another 115 trees (150 m3)

• In total over the whole harvesting area of 400 m x 30 m about 230 trees (about 300 m3), which should be extracted during the SLOPE

demo in autumn 2016 in AustriaTechnical Meeting

5 Jul 16

Page 10: 4th Technical Meeting - WP7

Survey areaSLOPE harvesting area

Additional harvesting area ÖBF agreement

Technical Meeting 5 Jul 16

Page 11: 4th Technical Meeting - WP7

4. Performed activities on the survey site I

• Selection of the cable line in SAGIS and generating GPS coordinates (survey area, SLOPE harvesting area)

• Marking corner points and borders of the survey area and harvesting area with colour spray on the basis of GPS data in Annaberg

• Marking cable line adapted on terrain conditions with marking tape• Making a complete enumeration for the SLOPE harvesting area

Technical Meeting 5 Jul 16

Page 12: 4th Technical Meeting - WP7

4. Performed activities on the survey site I

Marking harvesting treeswith white colour spray

UAV survey by COASTWAY 05.10.-09.10.2015

TLS survey by TREEMETRICS 02.11.-06.11.2015

Technical Meeting 5 Jul 16

Page 13: 4th Technical Meeting - WP7

4. Performed activties on the survey site I

• RFID tree marking and angle count sampling in Annaberg by BOKU 14.06.2016-15.06.2016

Technical Meeting 5 Jul 16

Page 14: 4th Technical Meeting - WP7

5. Survey site Montesover (Sover)

• Study site is located in the Italian province of Trento, in the territory of the municipality of Sover

• Survey area (10 ha) lies on Montesover (880 m - 1360 m)• SLOPE harvesting area (0.93 ha; 920 m - 1025 m)

Technical Meeting 5 Jul 16

Page 15: 4th Technical Meeting - WP7

5. Survey site Sover

• SLOPE harvesting area (0.93 ha): UAV survey was performed in summer 2014 TLS survey was performed in summer 2015 north exposed slope range of 70 % - 100 % landing area downhill on area close to public road 85 % spruce; 15 % larches and firs Main strata about 90 years old stock: 297 m3

number of stems: 182 basal area: 34.8 m2

mean dbh: 42.7 cm mean hight (hLorey): 21.2 m

Technical Meeting 5 Jul 16

Page 16: 4th Technical Meeting - WP7

5. Survey site Sover

• SLOPE harvesting area (0.93 ha): Maturity harvest (selective cutting): Extraction of 91 RFID marked trees

(Just Picea abies was marked) Other trees (including other species) will be extracted during the

operations

Technical Meeting 5 Jul 16

Page 17: 4th Technical Meeting - WP7

6. Performed activities on the survey site II

RFID marking and tag model testing

10.10.2014

Technical Meeting 5 Jul 16

Page 18: 4th Technical Meeting - WP7

6. Performed activities on the survey site II

RFID update all tested types changed to SLOPE model

17.04.2016

TLS survey and additional RFID marking03-07.08.2015

UAV survey28-31.07.2014

Technical Meeting 5 Jul 16

Page 19: 4th Technical Meeting - WP7

6. Performed activities on the survey site II

RFID replacement after felling25.06.2016

Felling of trees, cableway installation

24-25.06.2016

Technical Meeting 5 Jul 16

Page 20: 4th Technical Meeting - WP7

• Extracting trees with a modified Tecno carriage (RFID scanning unit) and processing trees with an modified ARBRO 1000 (RFID scanning/marking, determining timber quality)

• Performing a time study for the new SLOPE system (modified carriage and processor head) and a cost calculation for the performance evaluation

7. Prospective plans for the harvesting demo

Technical Meeting 5 Jul 16

Page 21: 4th Technical Meeting - WP7

8. Time study

Greifenberg Tecno carriage:• Integrated RFID tag reader effects on productivity

• Time study is done in the progress time procedure

• A mobile computer called ALGIZ 7 (with time study software) is used for recording the different working steps and the consumed time

• Determination of the time consumption of the single working cycle elements happens with Microsoft Excel

• Calculating productivity

Technical Meeting 5 Jul 16

Page 22: 4th Technical Meeting - WP7

8. Time study

ARBRO processor head:• Is able to determine timber quality effects on productivity

• Has integrated sensors, RFID reader to scan the tree and an RFID marker to staple new RFID tags on each produced log effects on productivity

• The time study will be video based

• The process will be recorded with a small action cam which is mounted on the cab of the excavator

• With a special time study software from METLA (Ari Lauren) Finland the video material will be analysed to calculate productivity

Technical Meeting 5 Jul 16

Page 23: 4th Technical Meeting - WP7

8. Scenarios for Austrian demo

• Scenario 1• Pre-Felling of 250 trees by ÖBf• Extracting of 250 trees by Greifenberg tower yarder• Processing of 250 trees by SLOPE processor• Estimated time consumption: 1 month

• Scenario 2• Pre-Felling of 250 trees by ÖBf• Extracting of 250 trees by Greifenberg tower yarder• Processing of 250 trees by ÖBf processor• Pre-Felling of 50 trees by ÖBf, extracting and storing next to road• Marking of 50 trees with RFID tag • Processing of 50 trees by SLOPE processor• Estimated time consumption: 1 week

• Scenario 3• ?

Technical Meeting 5 Jul 16

Page 24: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

9. Deliverable 7.031

• Deliverable 7.031 – Demo Report for Data Collection I• Due date: M27• Gives an overview of all collected data until the first demo

phase. The documentation will also include metadata information to allow an assessment of data quality.

• Updated with the real collected data right after the first pilot tests

Page 25: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

• D.7.031 Structure1. Metadata Inventory2. Metadata Statistics3. Metadata Collection After the First Pilot Demonstration

9. Deliverable 7.031

Page 26: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

• Metadata Inventory• Contains all the metadata related to information collected

until the first Pilot Demonstration in Sover

9. Deliverable 7.031

Page 27: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

• Metadata Inventory• 65 Metadata collected, equally distributed by the 3 test

case scenarios (Sover, Piscine, Annaberg)

9. Deliverable 7.031

Page 28: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

• Metadata Inventory

9. Deliverable 7.031

Page 29: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

• Expected Metadata Collection After the First Pilot Demonstration• Contains all the metadata related to information that are expected

to be collected in these days (133 measurements)

• Mainly sensors information

• To be confirmed after the first pilot

9. Deliverable 7.031

Page 30: 4th Technical Meeting - WP7

Contact info

Martin Kühmaier: [email protected] Picchi: [email protected]

Umberto di Staso: [email protected] Pichler: [email protected]

Maximilian Kastner: [email protected]

Thank you for your attention!!

Technical Meeting 5 Jul 16

Page 31: 4th Technical Meeting - WP7

References & Picture sources

ZAMG, 2015. Climate data Abtenau:• http://www.zamg.ac.at/fix/klima/oe71-00/klima2000/klimadaten_oesterreich_1971_frame1.htm

(22.12.2015)

Last downloaded on 22.06.2016:• http://www.holz-broeker.de/images/ansicht-luftbild-saegewerk-schnittholz.jpg• http://www.riebli-forst.ch/weitere-dienstleistungen/holztransporte/• http://www.dronelife.com/cms/sites/default/files/product/eBee_0.jpg• http://www.woodbusiness.ca/images/heads-arbro.jpg• http://www.blaueberge.at/region-sommer.html#!lightbox[annaberg]/1/• http://www.greifenberg.it/teleferiche/siberian/gallery_6.jpg• http://www.greifenberg.it/carrellipescanti/tecnoextremepower/gallery_1.jpg

Gianni Picchi: picture Annaberg UAV survey and Montesover survey site Maximilian Kastner: picture ALGIZ 7 mobile computer Franz Holzleitner: picture Action cam mounted on a cab

Technical Meeting 5 Jul 16

Page 32: 4th Technical Meeting - WP7

SLOPEIntegrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas

Technical Meeting 5 Jul 16

WORK PACKAGE 7: PILOTING THE SLOPEDEMONSTRATOR

FONDAZIONE GRAPHITECH

Page 33: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

Deliverables Progress

100 100

0 0 0 0

75

00

10

20

30

40

50

60

70

80

90

100

D7.0

1 Pr

otoc

ol fo

rth

e de

finiti

on o

fev

alua

tion

met

hodo

logy

(BO

KU)

D7.0

2 Pr

otoc

ol fo

rth

e ex

perim

enta

lde

sign

of

dem

onst

ratio

nac

tiviti

es (B

OKU

)

D7.0

4 De

mo

repo

rtfo

r qua

lity

cont

rol

(BO

KU)

D7.0

5 De

mo

repo

rtfo

r tim

ber s

uppl

ype

rfor

man

ce &

ERP

(CN

R)

D7.0

6 Re

port

s and

man

uals

for o

ff-th

e-jo

b tr

aini

ng (C

NR)

D7.0

7 M

anua

ls,

guid

elin

es a

ndle

arni

ng p

acka

ges

for o

n-th

e-jo

btr

aini

ng (C

NR)

D7.0

31 D

emo

repo

rtfo

r dat

a co

llect

ion

I(G

RAPH

ITEC

H)

D7.0

32 D

emo

repo

rtfo

r dat

a co

llect

ion

II(M

HG)

Deliverables Status

Page 34: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

T.7.3 Trials and Validation Cycle

• Deliverable 7.031 – Demo Report for Data Collection I• Due date: M27• Gives an overview of all collected data until the first demo

phase. The documentation will also include metadata information to allow an assessment of data quality.

• Updated with the real collected data right after the first pilot tests

Page 35: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

T.7.3 Trials Recommendation and validation cycle

• D.7.031 Structure1. Metadata Inventory2. Metadata Statistics3. Metadata Collection After the First Pilot Demonstration

Page 36: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

T.7.3 Trials Recommendation and validation cycle

• Metadata Inventory• Contains all the metadata related to information collected

until the first Pilot Demonstration in Sover

Page 37: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

T.7.3 Trials Recommendation and validation cycle

• Metadata Inventory• 65 Metadata collected, equally distributed by the 3 test

case scenarios (Sover, Piscine, Annaberg)

Page 38: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

T.7.3 Trials Recommendation and validation cycle

• Metadata Inventory

Page 39: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

T.7.3 Trials Recommendation and validation cycle

• Expected Metadata Collection After the First Pilot Demonstration• Contains all the metadata related to information that are expected

to be collected in these days (133 measurements)

• Mainly sensors information

• To be confirmed after the first pilot

Page 40: 4th Technical Meeting - WP7

Technical Meeting 5 Jul 16

Thanks