Daechang Solution Co., Ltd
Ha Neul Ahn
Parallel Session 1.1 : Performance of Outstanding Enterprise Participating in the Cluster Program
Contents
1 Overview of Daechang Solution
2 Overview of Cluster Project
3 Milestones of Cluster Project
4 Outcomes
Overview of Daechang Solution > Company at a glance
Establish
-ment
May 1 1953
Annual Revenue
KRW62.8bil (2014) Headcount
Production Capacity
Carbon steel casting
and alloy steel Key
Products
Weight
Overview of Daechang Solution > Company at a glance
History 2013 Changed company name to Daechang Solution Co., Ltd.
2012 Acquired stakes of Cryos Co., Ltd.
2012 Received Silver Tower Industry Medal in recognition of
‘outstanding capital asset development’ (CEO Park Jeong Ho)
2011 Designated as advanced technology center (ATC) by
Ministry of Knowledge Economy
2009 Newly built and started operation of Ulju Plant
2008 Received Presidential Medal in recognition of outstanding
capital asset development
2007 Listed in KOSDAQ
2007 Changed company name to Daechang Metal Co., Ltd.
2006 Designated as world-class product producer (MOTIE)
1953 Founded Daechang Cast Iron Industry Company
(Youngdo Busan)
Overview of Daechang Solution > Company at a glance
Busan
Plant
Busan Plant(HQ)
: Located in Daedaepo
Address : Daedae-dong Saha-gu Busan
Korea
Size : 16,665m2 (5,050 pyung)
Headcount : 75
Production Capacity : 18,000 tons/ year
Ulsan Plant
: Located in Ulju-gun
Address : Samdong-myun Ulju-gun
Ulsan Korea
Size : 132,398m2 (40,050 pyung)
Headcount : 90
Production Capacity : 27,000 tons/year
Ulsan
Plant
Overview of Daechang Solution > Area of Business _Steel casting for ship engine
Korea world class
product (2012)
Korea world class
product(2006)
Overview of Daechang Solution > Area of Business _ Steel casting for offshore plant
Chain Jack
and Winch System
Overview of Cluster Project
Project name
Domestic production cluster for drilling equipment and materials based on drilling system integration
Project period Dec 1 2012 ~ Nov 30 2014 (24 months)
Project cost KRW1.99 billion
No. of companies in the project 39 (28(year 1) → 39(year 2))
① Project leader : DSME
② Sub leader : DSME, NK, Daechang Solution, KOMERI
③ Participating members :
Sun-Il Gyejeon, Daewon Industry, Sambo Construction Machinery, Sunbo Industry, Hoseung Ent, KTE, Kangrim, Kumgang, Sukjin E&T, Jungmin Metal,
Sungilencare, YNV, Ilseung, S&W, Daedong Metal Industry, Korval, Seyon Machine Ind, Woomin Tech, Estec, Gwangsung, Eungwang Industry, Sung-Il
SIM, Mt.H Control,Valve, Jeonjin Entech, Byuksong, Jung-A Marine, DKlok, Daom Metal, Daeho Hydralic, SLTE, Flutek, Yujincometal, Pan Korea Heavy
Industries, Cytroniq
④ Secretary : KICOX (Busan Branch)
Overview of Cluster Project
Derrick with
Components
Drill String &
Down-Hole
Equipment
Bulk & Mud
System
NK
Sunil Gaejeon
Sambo Construcion
Machinery
Sukjin E&T
YNV
S&W
Kangrim
Kumgang
Daechang
Solution
Daewon
Industry
Sunbo
Industry
Hoseung Ent
KTE
JM Tech
Shinho
Valcan
Drill Floor
Equipment
& System
Sungil encare
Ilseung
Well Control
Equipment
& System
Project Leader : DSME
Sponsor : KOMERI
KICOX(Busan Branch)
*Total 39 company and institutions
Overview of Cluster Project
Process on development of offshore drilling system industry
and win-win cooperation of small, medium and large enterprises
Project leader: DSME
Network
DSME
Form domestic production
industry cluster network of
drilling system integration
technology-based drilling
equipment and materials
Cluster general assembly
Managing committee
Drilling localization technology
exchange workshop
Advanced technology seminar
R&D 1
Develop modularization
technology of riser tensioning
APV(air pressure vessels) for
offshore drilling system
Leader(SME) + Demand
(DSME)
Participation of Sunil Gyejeon
Development of equipment and
material technology
that can be domestically
produced in a short timeframe
R&D 2
Develop Korean
drawworks drum
For arctic drillship
Leader(SME) +Demand
(DSME)
Participation of Daewon Heavy
Industries
Development of equipment and
material technology that can be
domestically produced in a
short timeframe
Non R&D
Establish a technology support
mechanism for development of
drilling system integration
Participation of 21 companies and
institutions
Field customized education and
training
Mentoring on market-entry
knowledge
Support for test analysis and
compliance with international code
NK Daechang
Solution KOMERI
Domestic and overseas
benchmarking and demand
survey Support for prototype production
Overview of Cluster Project > Objective
NOV, AKMH Oil Major
N/W
(DSME) R&D
(NK, Daechang)
NOV, AKMH Oil Major
N/W(DSME)
R&D
(NK,Daechang)
BEFORE
AFTER
Overview of Cluster Project > Technology Development Structure 1
DSME
Daechang
Solution
KOMERI
Review spec
Negotiation skills
with supplier
Technical support, PQ
support, customized training
Domestic development
of drawworks drum
Overview of Cluster Project > Technology Development Structure 2
Develop key drilling
system materials
and equipment
Theme-based
Cluster Project
Platform for
Joint R&D
Daechang Solution
Material DB
Company A
Company B
Company C
Share
material
DB
Milestones of Cluster Project
Cluster General Assembly (2 times a year/total 4 times)
Managing Committee (4 times a year/total 8 times)
Progress Meeting (12 times a year/total 24 times)
• Presented on annual results
and plan by members
• Held interim briefing
• Progress briefing by members
• Reported on the progress of
given theme
• Introduced managing committee
• Managing rules
• Discussed directions, reported on
progress
• Plan, and reviewed other agenda
• Checked monthly progress
• Result by members and discussed
matters to be decided
Milestones of Cluster Project
Drilling System Technology
Exchange Workshop (2 times a year/ total 4 times)
Seminar on
Advanced Technology (2 times a year/ total 4 times)
1. Introduction of 6th generation deep sea drilling
system (Prof. Lee Myung Ho/ KMOU)
2. Drilling & Mud System (Prof. Choi Jung
Geun/SNU)
3. Introduction of development of LP Mud
Treatment Equipment (President Hwang
Joong Deuk/ Woomin Tech)
4. Introduction of Doosungho, semi-submersible
rig drilling equipment (Director Park Jae Mun/
KNOC)
1. Modern Drilling Technology & DNV-Offshore Standard (Kang Seung Young/
DNV-GL)
2. Latest and New Technology of Drilling System (Dr. Jang Se Hoon/ Technip)
3. Latest technology trend of drilling operation (Prof. Lim Jong Se/ KMOU)
4. Major foreign patents on drilling system (Lee Sung Gyu/patent lawyer/ AIIP)
5. Advanced technology trend of drilling system (Prof Lee Myung Ho/ KMOU)
6. Introduction of DNV-GL test and certification on offshore plant equipment
(Kang Seung Young/ senior inspector/ DNV-GL)
7. Introduction of the Progress on Subsea test base for Equipment and Materials
of Offshore drilling system (Jujak) (Lim Dong Ju/ KOMERI)
8. Introduction of new drilling system (Kim Jung Min/ DSME)
Benchmarking
in Korea and overseas OTC and Benchmarking of
advanced technology(May 5~11 2014)
DSME tour and Drilling
ship sailing ceremony (Sep 23 2014) • OTC : Visited drilling equipment company
booths and carried out benchmarking.
Discussed individual interests of companies
visiting OTC and cluster companies
• Offshore plant industry exchange &
cooperation symposium (Increased networking
activities with the presence of 80 personnel
from MOTIE, related companies, institutions
and academia)
• Houston DSME Reception : Held networking
activities among owners, registry, large
companies and SMEs with the attendance of
NK and other cluster members
• Visited Houston OCEAN STAR Offshore
Energy Center to decide the direction of
domestic production of drilling equipment and
materials
• Understood the trend of offshore drilling
industry and identified items to be
localized during a ride on the drill ship
fabricated by DSME
• Visited DSME PR Hall, watched PR
video, toured shipyard etc.
Milestones of Cluster Project
Milestones of Cluster Project > Outcomes of Project
Established a framework for
localization-themed cluster of
drilling equipment and
materials, leading to a win-
win partnership among small,
medium and large enterprises
Cluster General
Assembly
Technology Exchange Workshop
Advanced Technology
Seminar
Domestic
/Overseas Benchmarking
Survey
Planned the
operation of
cluster
Feedback by
members
Facilitated
exchange among
members
Improved
understanding on
project
Acquired
technology
knowledge of
researchers
Management
sought direction
for development
Learned global
market trend
Identified
mid-to-long
term roadmap
Incorporated
next year plan
Collected
various opinions
Able to find a breakthrough for
localization through
continuous market
development
Found a need for continued
networking with foreign leading
companies and institutions to gain
required capabilities
Outcomes
Generated appr. 4.1 billion in revenue from
application of APV module, after its
development, to actual ships (H.3031/2/3/4/5,
H.3618)
1. Results of Project-related Domestic Production
Built a project-related track record of
delivering to major foreign drilling system
vendor (Appr. KRW3.2 bil)
- Laid the platform for the domestic
production of drawworks drum and material
technologies required for localization of
drilling system integration in the future
Completed PQ listing at foreign major drilling system vendor
- Laid the platform for the domestic production of derrick and
top driver required for localization of drilling system integration
in the future
Leader : NK, Sponsor : DSME and 3 Korean shipbuilders,
MOTIE, Busan Metropolitan Government, KICOX. Participated
by 40 valve-related equipment and material suppliers
OVC helped Korean companies’ discussion on the
establishment of domestic JVs with foreign valve suppliers
: NSV(discussing with OMB and 7 other companies),
DK-LOK(discussing with Viar Valvole ),
KMC(discussing with Mir V/V)
NK
Daechang Solution
Eungwang Industry
OVC linked activities : total 40 companies(institutions)
Outcomes
Planned the identification and chosen large state-sponsored national project (Bulk & mud H. system
development) related to domestic production of drilling system equipment and materials
- National project : Industry convergence core technology development project, - Total project cost : KRW10.9bil,
- Project period: Jun 1 2013~May 31 2015
2. Identification and Planning of Project-related Large National Projects
Performing activities to plan the establishment
of ‘Offshore plant topside engineering
technological independence TFT’
(MOTIE, 3 Korean shipbuilders, academia etc.)
Under discussion over building large drilling
equipment for onshore
and offshore testing as government project
(testing/certification of equipment and materials and
development of innovative equipment and materials)
Conducted East Sea Jujak project /
Deep sea drilling test platform project
(MOTIE, MOLIT, 3 Korean shipbuilders, KOMERI, KHAN etc.)
Carried out localization activities and
localization planning for
No.2 Doosungho
(semi-submersible rig) project
Outcomes
Expect localization of equipment and materials required for
fabricating the next Doosungho (semi-submersible rig)
Generated synergy by linking with Jujak-1, project on the use of
waste borehole
Overcame limitations in a development structure made up of
individual company
Achieved joint technology development and created new value
through advanced technology and technology exchanges
Established drilling localization-themed cluster conducive to win-
win partnership for small, medium and large enterprises
Expect a breakthrough in localization from continuous market
development
Established win-win network
Strengthen SME competitiveness
Link with large national project Aggressive
localization
Successful
market entry
Value
creation for
companies
Localization
of offshore
module
Cooperation
for win-win
partnership Cross
industry
synergy
Drilling
Theme
Cluster