SISI NUBI 2A PROJECT
DAILY ACTIVITY REPORTWPN2 Site Works
REPORTED DATE :
CUT OF TIME :
SAFETY MANPOWERTO DAY CUMM. NO. SUM
Manhour 1392 5112 1 TOTAL : SPU 13 6.00 AM Cloudy
CeRMA 0 0 2 TOTAL : ENG/PJC 20
Nearmiss 0 0 3 EPC‐1 : PT Meindo Elang Indah 83 12.00 AM Clear
FAC 0 0 TOTAL : 116
RWDC 0 0 6.00 PM Not reported
Material Damage 0 0 VESSEL/BARGEAccident/Incident 0 0 N O. V ES SE L/ BA RG E PAX/POB POSITION PUR POSE 12.00 PM Not reported
HSE Induction 1 4 1 EB 507 211 / 250 WPN2 Acc. Barge
Tool Box 1 8 2 ASL Triaksa WPN2 AHT
Safety Talk 0 2 3 Pesut Mahakam WPN2 Crew Boat
HSE Drill 0 4 4 Logindo Sparrow WPN2 ‐ Handil Crew Boat
HSE Observation 0 0 5 Elang Tangguh 101 WPN2 Tug Boat
6 S ur ya Indah WPN2 Tug Boat
HIGHLIGHT ISSUEBPN Team conducted management visit for SIMOPS
Mustering & POB Control drill ‐ improvement on POB Control by counting from T‐Card
Start working on 8:30 due to late opening permit by OA (1 Operator, Gas Test only 1 ea)
Piping activities waiting for JRA for piping dismantling, unbolt ‐ bolt tightenin, flushing and drying, Leak test and grossleak
Equipment for Hydrotest still not available on site
ACTIVITYNO. TO DAY ACTIVITY PROGRESS NO. TOMORROW PLAN
1 Install gusset plate on weather deck for module 1 (3 of 7) 40% 1 Install gusset plate for mezzanine deck Module 1
2 Install cable tray support at lower deck 100% 2 Intsall E&I support at mezzanine deck
3 Install tubing tray support at lower deck 100% 3 Intsall scaffolding at sump deck and lower deck
4 Modify manifold header at extension platform module 2 4 Fabrication at EB507
3‐May‐2011
6.00 PM (DAYSHIFT)
COMPANY
WEATHERDESCRIPTION
S A F E T Y S T A T U S
S A F E T Y E V E N T
ns a s ca o n g a ower ec an mezzan ne ec rans er ma er a y us ng crane arge an pe es a crane
6 Fabrication at EB507 6 Install extension platform module 2
7 fit up & welding closed drain
TYPE OF WORK PERMIT SUM TYPE OF WORK PERMIT SUM
Hotwork Naked Flame 5 Hotwork Naked Flame 8
Hotwork Non Naked Flame 4 Hotwork Non Naked Flame 8
Cold Work 12 Cold Work 9
PROGRESSNo. Scope Description % Completed : Plannned 7.3% Actual 9.5%
Structural Completion Date : Baseline 27‐Jun‐2011 Forecast 27‐Jun‐2011
S001 Preparation work, scaffolding & install gusset plate for Module 2
S002 Preparation work, scaffolding & install gusset plate for Module 1
S003 Survey underwater
S004 Mudmat cutting removal
S005 Install Anode
S 00 6 CP Guide Under Water
S 00 7 CP Guide Above Water
S008 Extension Deck Module ‐2
S009 Extension Deck Module ‐1
S010 Install Appurtenance
Piping
P001 Install Temporary Platform, Lifting and Install WHCP
P 00 2 F ir e Water
P 00 3 O pe n Drain
P004 Hydraulic
P005 Methanol Injection
P006 Closed Drain
P 00 7 W el l Service
P008 Venting
P009 Sample Connection
P010 Utillities
Electrical/Instrument
EI001 Support Installation
EI002 Tray Installation
EI003 Tubing Installation
EI004 Instrument Cable Installation
EI005 Electrical & Grounding Cable Installation
EI006 Instrument & Electrical Installation
EI007 Instrument Cable Termination & Hook‐Up
EI008 Electrical Cable Termination & Hook‐Up RFC Sub‐System
EI009 Sand Monitoring System No of Sub System Issued Awaiting Rejected Approved
EI010 Fire Gas Detector Modification & PCS/SSS Modiftcation Approval
EI011 WHCP
EI012 Relocation Lighting due to Structural Module Installation
Reported by Sisi Nubi 2a Site Planner
ENG/PJC
0
1%
1%
0%
0%
020 0 0
5%
Planned
Work Permit
0%
0%
Progress
100%
0%
On Going Work Permit
0%
21%
0%
0%
18%
24%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
30%
0%
0%
5%
0%
0%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
16.00%
18.00%
20.00%
0%
20%
40%
60%
80%
100%
120%
2 3
‐ A p r
3 0
‐ A p r
7 ‐
M a y
1 4
‐ M a y
2 1
‐ M a y
2 8
‐ M a y
4 ‐
J u n
1 1
‐ J u n
1 8
‐ J u n
2 5
‐ J u n
D a i l y P r o g r e s s V a l u e
C u m m u l a t i v e P r o g r e s s V a l u e
Date
S‐Curve Actual vs Plan Progress
Plan Daily Progress Actual Daily Progress
CummulativePlan Daily P ro gr es s C um A ct ua l D ai ly Progress