Footpath - Brick Paving RFT202003

Contractor…………………………………..

Schedule 1 – Composition of Tender

The Tenderer shall show the lump sum cost of each item in the following schedule.

Item Description Amount ($AUD)

1 Preliminaries $

2 Brick paving preparation $

3 Brick Paving $

4 Concrete Plinth $

5 Miscellaneous $

Tender Lump Sum Amount (excluding GST) $

Tender Provisional Sums (excluding GST) $

TENDER SUM (excluding GST) $

GST $

GROSS TENDER SUM (including GST) $