We are Future Ready
Rural Residential Public Rural Residential Public SchoolsSchools
2222ndnd September 2007 September 2007
DEPT. OF SCHOOL EDUCATIONDEPT. OF SCHOOL EDUCATION
GOVT OF ANDHRA PRADESHGOVT OF ANDHRA PRADESH
Andhra Pradesh
We are Future Ready
AP Literacy in 2001AP Literacy in 2001 : 60.47%: 60.47% India Literacy 2001India Literacy 2001 : 64.8% : 64.8%
AP Schools AP Schools - Total- Total :96277 :96277 • Primary: 62,162 (Govt.:54279)Primary: 62,162 (Govt.:54279)• Upper Primary: 17823 Upper Primary: 17823
(12094)(12094)• High Schools: 16292 (9809)High Schools: 16292 (9809)
2
Education in APEducation in AP
We are Future Ready
Govt. Sector: 327,767Govt. Sector: 327,767 Aided: 20572Aided: 20572 Private: 155816Private: 155816 Primary & UP: 3.29 lakhsPrimary & UP: 3.29 lakhs High Schools: 1.75 lakhsHigh Schools: 1.75 lakhs
3
Teachers in APTeachers in AP
We are Future Ready4
CLASSCLASS GIRLS GIRLS %%
BOYS BOYS %%
TOTAL TOTAL %%
II >100>100 >100>100 >100>100
IIII >100>100 >100>100 >100>100
IIIIII 9292 9292 9292
IVIV 8989 8989 8989
VV 9191 9090 9191
Enrolment in AP 06-07Enrolment in AP 06-07
We are Future Ready
CLASSCLASS GIRLS GIRLS %%
BOYS BOYS %%
TOTAL TOTAL %%
VIVI 8282 8484 8383
VIIVII 7878 8181 7979
VIIIVIII 6666 6969 6767
IXIX 6060 6363 6262
XX 5555 5959 57575
Enrolment in AP 06-07Enrolment in AP 06-07
We are Future Ready
RURAL RESIDENTIAL RURAL RESIDENTIAL
PUBLIC SCHOOLSPUBLIC SCHOOLS
We are Future Ready7
To Provide best quality To Provide best quality education education
to to academically brilliant academically brilliant
children belongingchildren belonging to Rural and Semi-Urban to Rural and Semi-Urban
areas in the State areas in the State
OBJECTIVEOBJECTIVE
We are Future Ready
One School One School per per
Assembly Constituency Assembly Constituency proposed in the first proposed in the first phase of the programphase of the program
Number of SchoolsNumber of Schools
We are Future Ready
Fully ResidentialFully Residential English MediumEnglish Medium CBSE syllabusCBSE syllabus 55thth or 6 or 6thth to 12 to 12thth classes classes
9
Salient FeaturesSalient Features
We are Future Ready
Strength about 1200 per Strength about 1200 per school @ 40 students per school @ 40 students per section / 4 sections per section / 4 sections per classclass
Full-fledged Library, Labs, Full-fledged Library, Labs, Sports, Co-curricular Sports, Co-curricular Activities, Hostel facilitiesActivities, Hostel facilities
10
Salient FeaturesSalient Features
We are Future Ready
Proposed under Public-Private Proposed under Public-Private PartnershipPartnership
Industry / Business Groups, Industry / Business Groups, NGOs, Educational Groups, etc. NGOs, Educational Groups, etc. invitedinvited
11
Public-Private PartnershipPublic-Private Partnership
We are Future Ready
Private Partners to bear the Private Partners to bear the Non-Recurring CostNon-Recurring Cost
Govt. to share 50% of Govt. to share 50% of Recurring CostsRecurring Costs
12
Public-Private PartnershipPublic-Private Partnership
We are Future Ready
Balance Rec. Cost: Raised thro’ Balance Rec. Cost: Raised thro’ fees of Management quota fees of Management quota seatsseats
25% Mgmt share in admissions25% Mgmt share in admissions Bal. thro’ State Level Admission Bal. thro’ State Level Admission
Test & Dt. level Merit-listTest & Dt. level Merit-list
13
Public-Private PartnershipPublic-Private Partnership
We are Future Ready
Subject to availability, Govt. to Subject to availability, Govt. to provide land on Long-term provide land on Long-term lease (33 years)lease (33 years)
30 to 50 acres in drylands30 to 50 acres in drylands Lesser extent in Irrigated / Lesser extent in Irrigated /
Delta areasDelta areas
Land for the SchoolsLand for the Schools
We are Future Ready
Private Partner’s PreferencePrivate Partner’s Preference Availability of Govt. landAvailability of Govt. land Donations of land to be also Donations of land to be also
consideredconsidered Spatial Equity in the Spatial Equity in the
distribution of the schoolsdistribution of the schools
Location FactorsLocation Factors
We are Future Ready
Rural or Semi-Urban Locations Rural or Semi-Urban Locations onlyonly
Getting Good Teachers & their Getting Good Teachers & their location-preferences location-preferences
Availability of minimum Availability of minimum medical facilities preferablemedical facilities preferable
16
Location FactorsLocation Factors
We are Future Ready
MOU to be entered into by the MOU to be entered into by the Private Partner & Govt.Private Partner & Govt.
Day-to-Day Management with Day-to-Day Management with the Private- Partnerthe Private- Partner
Board of GovernorsBoard of Governors Some Govt. Nominees in BOGSome Govt. Nominees in BOG
17
Management PatternManagement Pattern
We are Future Ready
Admission restricted to Rural Admission restricted to Rural and semi-urban childrenand semi-urban children
25% of Admissions at 25% of Admissions at Management’s discretionManagement’s discretion
50% Reservations50% Reservations Balance 25% Open CompetitionBalance 25% Open Competition
Admission MatrixAdmission Matrix
We are Future Ready
Govt. to grant Scholarships to Govt. to grant Scholarships to Reservation category & Open Reservation category & Open Competition studentsCompetition students
(= 50% of Recurring Cost)(= 50% of Recurring Cost) Management Quota students to pay Management Quota students to pay
as fees 50% of the Recurring Costas fees 50% of the Recurring Cost
Fee MatrixFee Matrix
We are Future Ready
Open Competition students Open Competition students also to have Government also to have Government ScholarshipsScholarships
Feasibility of cross-subsidy Feasibility of cross-subsidy between management seats & between management seats & poor OC students to be poor OC students to be examinedexamined
Fee MatrixFee Matrix
We are Future Ready21
School ComplexSchool Complex: : 30,000 sft (28 classrooms; 30,000 sft (28 classrooms;
Labs, Library, Other Rooms); Labs, Library, Other Rooms); @Rs.700/- per sft: @Rs.700/- per sft:
Rs.210 lakhsRs.210 lakhs AuditoriumAuditorium: : 12000 sft @ 12000 sft @
Rs.400/- per sft: Rs.400/- per sft: Rs.48 lakhsRs.48 lakhs
Non-Recurring CostNon-Recurring Cost
We are Future Ready22
Hostel BuildingsHostel Buildings: : 60,000 sft; @ 60,000 sft; @ Rs.750/- per sft; Rs.750/- per sft; Rs.450 Rs.450 lakhslakhs
Res. Qtrs. (all Teaching Staff Res. Qtrs. (all Teaching Staff & some non-teaching staff): & some non-teaching staff):
36,000 sft:36,000 sft: Rs.270 lakhsRs.270 lakhs
Non-Recurring CostNon-Recurring Cost
We are Future Ready
Fencing, Internal Roads, lighting, Fencing, Internal Roads, lighting, D/Water, etc.:D/Water, etc.: Rs.100 lakhsRs.100 lakhs
Furniture (Classes, Labs, Library, Furniture (Classes, Labs, Library, Hostels, etc):Hostels, etc):Rs.90 lakhsRs.90 lakhs
TOTAL : TOTAL : Rs.1168 Rs.1168 lakhslakhs
23
Non-Recurring CostNon-Recurring Cost
We are Future Ready24
Salaries: Salaries: (Teaching: 45; Non-(Teaching: 45; Non-Teaching & Hostel: 60): Teaching & Hostel: 60):
Rs.130 lakhsRs.130 lakhs
Utilities Utilities (Elecy, telephs, (Elecy, telephs, consumables, repairs, etc.):consumables, repairs, etc.):
Rs.18 Rs.18 lakhslakhs
Recurring CostRecurring Cost
We are Future Ready
Boarding CostBoarding Cost: Rs.40 per student : Rs.40 per student per day (1200 * 9 * Rs.1200 p.m.) per day (1200 * 9 * Rs.1200 p.m.) Rs.130.0 lakhs Rs.130.0 lakhs
Grand Total Grand Total : : Rs.278.0 lakhsRs.278.0 lakhs
Cost per student: Cost per student: Rs.23,167/- Rs.23,167/- p.a.p.a.
25
Recurring CostRecurring Cost
We are Future Ready
Adilabad: Adilabad: Adilabad, Nirmal, Adilabad, Nirmal, Utnoor, Khanapur, Luxettipet, Utnoor, Khanapur, Luxettipet, Mancherial, Chinnur, Asifabad, Mancherial, Chinnur, Asifabad, Boath, Basara, Mudhol, Sirpur, etc.Boath, Basara, Mudhol, Sirpur, etc.
Nizamabad: Nizamabad: Armoor, Bodhan Armoor, Bodhan Mortad, Madnur, Banswada, Mortad, Madnur, Banswada, Yellareddi, Kamareddi, Gandhari, Yellareddi, Kamareddi, Gandhari, Bheemgal, etc. Bheemgal, etc.
26
Tentative LocationsTentative Locations
We are Future Ready
Karimnagar:Karimnagar: Karimnagar, Sircilla, Karimnagar, Sircilla, Manthani, Peddapally, Jagtial, Manthani, Peddapally, Jagtial, Ramagundam, Vemulawada, Ramagundam, Vemulawada, Huzurabad, Metpally, SultanabadHuzurabad, Metpally, Sultanabad
Medak:Medak: Sangareddi, Zaheerabad, Sangareddi, Zaheerabad, Narayan-Khed, Medak, Andole, Narayan-Khed, Medak, Andole, Narsapur, Gazwel, Siddipet, etc. Narsapur, Gazwel, Siddipet, etc.
27
Tentative LocationsTentative Locations
We are Future Ready
WarangalWarangal: Mahbubabad, Mulugu, : Mahbubabad, Mulugu, Eturnagaram, Jangaon, Cheryal, Eturnagaram, Jangaon, Cheryal, Parkal, Narsampet, Wardhannapet.Parkal, Narsampet, Wardhannapet.
KhammamKhammam: Khammam, Madhira, : Khammam, Madhira, Yellandu, Kothagudem, Manugur, Yellandu, Kothagudem, Manugur, Bhadrachalam, Aswaraopet, Bhadrachalam, Aswaraopet, Chinturu, Sattupalli, etc. Chinturu, Sattupalli, etc.
28
Tentative LocationsTentative Locations
We are Future Ready
Ranga Reddi: Ranga Reddi: Medchal, Chevella, Medchal, Chevella, Ibrahimpatnam, Parigi, Vikarabad, Ibrahimpatnam, Parigi, Vikarabad, Tandur, Shankarpally, Marpally, etcTandur, Shankarpally, Marpally, etc
Nalgonda: Nalgonda: NalgondaNalgonda, , Bhongir, Bhongir, Ramannapet, Suryapet, Ramannapet, Suryapet, Huzurnagar, Miryalguda, Halia, Huzurnagar, Miryalguda, Halia, Devarakonda, Munugodu, Devarakonda, Munugodu, Tungaturti, Aler, etc. Tungaturti, Aler, etc.
29
Tentative LocationsTentative Locations
We are Future Ready
MahabubnagarMahabubnagar:: M’Nagar, Maktal, M’Nagar, Maktal, Kodangal, Shadnagar, Kalwakurti, Kodangal, Shadnagar, Kalwakurti, Wanparthi, Nagarkurnool, Gadwal, Wanparthi, Nagarkurnool, Gadwal, Achampet, Alampur, Kolhapur, etc.Achampet, Alampur, Kolhapur, etc.
Kurnool:Kurnool: Nandikotkur, Atmakur, Nandikotkur, Atmakur, Srisailam, Nandyal, Allagadda, Srisailam, Nandyal, Allagadda, Koilkuntla, Banganpalli, Dhone, Koilkuntla, Banganpalli, Dhone, Pattikonda, Alur, Adoni, etc. Pattikonda, Alur, Adoni, etc.
30
Tentative LocationsTentative Locations
We are Future Ready
Chittoor: Chittoor: Chittoor, Tirupati, Chittoor, Tirupati, Puttur, Satyavedu, Srikalahasti, Puttur, Satyavedu, Srikalahasti, Palamneru, Kuppam, Punganur, Palamneru, Kuppam, Punganur, Madanapalle, Vayalpadu, etc.Madanapalle, Vayalpadu, etc.
Nellore:Nellore: Nellore, Gudur, Vakadu, Nellore, Gudur, Vakadu, Nayudupet, Sullurpet, Venkatagiri, Nayudupet, Sullurpet, Venkatagiri, Rapur, Podalakur, Atmakur, Kavali, Rapur, Podalakur, Atmakur, Kavali, Udayagiri, Vinjamur, etc.Udayagiri, Vinjamur, etc.
31
Tentative LocationsTentative Locations
We are Future Ready
Prakasam:Prakasam: Ongole, Kandukur, Ongole, Kandukur, Kanigiri, Giddalur, Cumbum, Kanigiri, Giddalur, Cumbum, Markapur, Podili, Darsi, Martur, Markapur, Podili, Darsi, Martur, Chirala, Cheemakurti, etc.Chirala, Cheemakurti, etc.
Guntur: Guntur: Repalle, Nizampatnam, Repalle, Nizampatnam, Bapatla, Sattenapalle, Bapatla, Sattenapalle, Narasaraopet, Vinukonda, Narasaraopet, Vinukonda, Amaravati, Achampet, Dachepalli, Amaravati, Achampet, Dachepalli, Macherla, KarempudiMacherla, Karempudi
32
Tentative LocationsTentative Locations
We are Future Ready
KrishnaKrishna:: Machilipatnam, Nuzvidu, Machilipatnam, Nuzvidu, Challapalli, Avanigadda, Tiruvuru, Challapalli, Avanigadda, Tiruvuru, Gannavaram, Mylavaram, Vissann-Gannavaram, Mylavaram, Vissann-apet, Nandigama, Jaggayyapet, apet, Nandigama, Jaggayyapet, etc.etc.
W.GodavariW.Godavari: Eluru, Chintalapudi, : Eluru, Chintalapudi, KVKota, Polavaram, JRGudem, KVKota, Polavaram, JRGudem, Kovvur, Dwaraka-Tirumala, etc.Kovvur, Dwaraka-Tirumala, etc.
33
Tentative LocationsTentative Locations
We are Future Ready
East GodavariEast Godavari: Tuni, : Tuni, Peddapuram, Pithapuram, Peddapuram, Pithapuram, Pattipadu, Korukonda, Pattipadu, Korukonda, Rajanagaram, Sitanagaram, RC-Rajanagaram, Sitanagaram, RC-Varam, Addateegala, Varam, Addateegala, RajavommangiRajavommangi
VisakhapatnamVisakhapatnam: Bimli, Anakapalli, : Bimli, Anakapalli, Elamanchili, Nakkapalli, Chodava-Elamanchili, Nakkapalli, Chodava-varam, Narsipatnam, Chintapalli, varam, Narsipatnam, Chintapalli, Paderu, Araku Paderu, Araku 34
Tentative LocationsTentative Locations
We are Future Ready
Anantapur: Anantapur: Anantapur, Rayadurg Anantapur, Rayadurg Kalyandurg, Uravakonda, Gooty, Kalyandurg, Uravakonda, Gooty, Tadipatri, Dharmavaram, Kadiri, Tadipatri, Dharmavaram, Kadiri, Penukonda, Hindupur, Madaksira Penukonda, Hindupur, Madaksira
Kadapa:Kadapa: Kadapa, Badwel, Kodur, Kadapa, Badwel, Kodur, Rajampet, Rayachoti, Pulivendula, Rajampet, Rayachoti, Pulivendula, Vempalle, Jammalamadugu, Vempalle, Jammalamadugu, Proddutur, Porumamilla, LRPalleProddutur, Porumamilla, LRPalle
35
Tentative LocationsTentative Locations
We are Future Ready
VizianagaramVizianagaram: Vizianagaram, Par- : Vizianagaram, Par- vathipuram, Salur, Bobbili, S.Kota, vathipuram, Salur, Bobbili, S.Kota, Cheepurupalli, Gajapthinagaram, Cheepurupalli, Gajapthinagaram, GL PuramGL Puram
SrikakulamSrikakulam: Srikakulam, Amdala-: Srikakulam, Amdala-valasa, Narasannapet, Tekkali, valasa, Narasannapet, Tekkali, Palasa, Sompeta, Palakonda, Palasa, Sompeta, Palakonda, Pathapatnam, Seethampet, Rajam Pathapatnam, Seethampet, Rajam
36
Tentative LocationsTentative Locations
We are Future Ready
Dept of School EducationDept of School Education
Mr. CBS Venkata Ramana, IASMr. CBS Venkata Ramana, IAS
Principal Secretary, School Education, Govt of APPrincipal Secretary, School Education, Govt of AP
Contact: 040-2345 2403; Contact: 040-2345 2403;
Email: Email: [email protected][email protected]
APInvestAPInvest
Dr. C S RaoDr. C S Rao
Chief Executive OfficerChief Executive Officer
Email: Email: [email protected][email protected]
040-2345 3977040-2345 3977
37
CONTACTCONTACT
We are Future Ready38
THANK YOUTHANK YOU