Diavik Waste Rock Project
Waste Rock Studies at a Waste Rock Studies at a Diamond Mine SiteDiamond Mine Site
ScaleScale--up Methodologyup Methodology
Diavik Waste Rock Project
Humidity Cells 1 Humidity Cells 1 –– 66ooCC
Construction SequenceConstruction Sequence
Construction SequenceConstruction Sequence
Diavik Waste Rock Project
InstrumentationInstrumentation