SANTA FE CIVIC HOUSING AUTHORITY VI L LA ALEGRE - PHASE THREE (AKA: CAMPO ALEGRIA)

104 CAMINO DEL CAMPO SANTA

ZONING REGULATION COMPLIANCE MINIMUM LOT AREA AND DENSITY: PARKING REQUIREMENTS: RM-2 Mulitiple Family: 2,000 sq.ft. per Dwelling Unit (DU) required Table 14-8.6-1 SFCC

F E~ NEW M E X I C 0, 8 7 5 0 1

CODE ANALYSIS - 2009 IBC AND IRC: RESIDENTIAL UNITS COMMUNITY BUILDING

Gross Bldg Area - 1,728 sq.ft.

CONSTRUCTION TYPE V-B (IBC CHAPTER 6)

g <I)

! ,..: <I)

H ALAMEDA

Land Area Required: 28 DU x 2,000 sq.ft. / DU = 56,000 sq.ft. 1.7585 Acres -76,601 sq. ft.

10 Attached Units 800-1,200 sq.ft. 18 Attached Units < 800 sq.ft. Community Building

x 1.5 space / unit = 15 spaces x 1.25 space / unit = 23 spaces 1 space /250 sq.ft. = 5 spaces

UNIT SEPARATION per the 2009 International Residential Code (IRC) BUILDING AREA

FIRST FLOOR AREA 1 OCCUPANT OCCUPANT LOAD MAP Land Area Provided:

Density 15.9 Dwelling Units I Acre

HISTORIC DISTRICT: Westside/Guadalupe

LOT COVERAGE: 40% coverage permitted

Building Pads = 28,328 sq. ft. / Tract Area = 76,601 sq. ft. = 37 %

ABBREVIATIONS • •

Spaces Provided:

BUILDING SETBACKS:

Total Req'd = 43 spaces (4 Accessible Required plus 1 Van Accessible)

43 spaces total, 8 Accessible plus 1 Van Accessible

Front: 7 ft. by zoning, 10ft. required in Westside/Guadalupe District Side: 5 ft. Rear: 15 ft. Between Buildings: 10ft.

PERMITTED BLDG HGT:

24 ft. max. permitted in Westside/Guadalupe District

Freestanding Duplex Units shall comply with Section R302.3 Two Family Dwellings

Duplex Units sharing any length of a common wall shall comply with Section R302.2 Townhouses

Comm. Room 860 sq.ft. Office 300 " Storage 1 Mech 148 "

SECOND FLOOR R3 Residential 980 sq.ft.

BUILDING HEIGHT

ALLOWABLE AREA

EXITING REQUIREMENTS

OCCUPANCY

PLUMBING FIXTURES REQ'D (IBC CHAPTER 29)

1/15 sq.ft. 1/100 sq.ft. 1/300 sq.ft.

TOTAL

58 3 0.5

62

MAXIMUM 40 ft PERMITTED, 24 ft ACTUAL

6,000 sq.ft.

2 REQUIRED, 2 PROVIDED

GROUP A-3 (IBC CHAPTER 3)

FEMALE: LAVATORY 1/200 WATER CLOSET 1/65

MALE: LAVATORY 1/200 WATER CLOSET 1/125

PLUMBING FIXTURES PROVIDED FEMALE: 1 LAVATORY, 1 WATER CLOSET MALE: 1 LAVATORY, 1 WATER CLOSET

1 DRINKING FOUNTAIN 1 SERVICE SINK

FIRE SPRINKLERS PROVIDED

SEISMIC LOCATION REFER TO SHEET S4.0, GENERAL NOTES, I (F)

APPLICABLE CODES:

2009 NEW MEXICO COMMERCIAL AND RESIDENTIAL BUILDING CODE 2009 INTERNATIONAL BUILDING CODE 2009 INTERNATIONAL RESIDENTIAL CODE 1997 SOLAR ENERGY CODE (IAPMO) 2006 NM ENERGY CONSERVATION CODE ICCIANSI A117.1-2003 2009 NEW MEXICO PLUMBING AND MECHANICAL CODE 2009 UNIFORM MECHANICAL CODE (IAPMO) 2009 UNIFORM PLUMBING CODE (IAPMO) 2008 NEW MEXICO ELECTRICAL CODE 2008 NATIONAL ELECTRICAL CODE

NOTE:

WORK THESE DRAWINGS WITH PROJECT MANUAL FOR SPECIFICATIONS AND GEOTECHNICAL INVESTIGATION REPORT (BOTH 81/2"X 11" FORMAT), ISSUED SEPARATELY

AFF ABOVE FINISHED FLOOR CL., CLO. CLOSET DN DOWN F.O. FRAME OPENING JC,JAN CL JANITOR'S CLOSET OPG, OPNG OPENING RM ROOM UNF UNFINISHED

MATERIAL LEGEND AP ACCESS PANEL ClR CLEAR (ANCE) D DRAIN FLea FLOOR CLEANOUT JT JOINT OPP OPPOSITE RC ROLLER CATCH UON UNLESS OHTERW1SE NOTED NOTATION LEGEND AC ACOUSTICAL CLS CLOSURE D.D.B. DUTCH DOOR BOLT

ACT ACOUSTICAL TILE C.l.G. CHAIN LINK GATE DF DRINKING FOUNTAIN

ADMIN ADMINISTRATOR COL COLUMN DWG DRAWING ADDL ADDITIONAL COMM. COMMUNICATION EA EACH ADJ ADJUSTABLE COMPT. COMPARTMENT ELEC ELECTRIC (Al)

A/C AIR CONDITIONING CONC CONCRETE EWC ELECTRIC WATER COOLER

ALUM ALUMINUM CONN CONNECTION El ELEVATION

AD AREA DRAIN CaNST CONSTRUCTION EP EPOXY PAINT ASPH ASPHALT CONT CONTINUOUS OR CONTINUE EMER EMERGENCY ASTl ASTRAGAL CONTR CONTRACT (OR) EPDM RUBBER BASED ROOFING

BS BARSTOCK Cll CONTRACT LIMIT LINE EQ EQUAL BM BEAM CJT CONTROL JOINT EQUIP EQUIPMENT BIT BITUMINOUS CG CORNER GUARD EXH EXHAUST BlK BLOCK CORR CORRIDOR EXP EXPANSION BLKG BLOCKING CORRG CORRUGATED EXIST"G. 81~ING B.O. BOTTOM OF COORD COORDINATED BR BRICK EXT EXTERIOR

CFl COUNTERFLASHING BLDG BUILDING FB FACE BRICK

CS COUNTERSINK B BUILDERS HARDWARE F FEMALE

CTSK COUNTERSUNK SCREW BUR BUILT UP ROOFING COURSE (s)

FIN FINISH (ED) CRS

FFE FINISHED FLOOR ELEVATION CA CARD ACCESS DPR DAMPER CAB CABINET OP DAMPPROOFING

FFl FINISHED FLOOR LINE

CCTV CLOSED CIRCUIT TELEVISION FA FIRE ALARM D.B. DEAD BOLT

CPT CARPET (ED) FE FIRE EXTiNGUiSHER DEM DEMOLISH. DEMOLITION

CSMT CASEMENT FEC FIRE EXTINGUISHER CABINET DEP DEPRESSED

FHS FIRE HOSE STATION CI CAST IRON DTL. DET OETAll FP FIREPROOF CB CATCH BASIN DIAG DIAGONAL

CK CALK (ING) CAULK (ING) FPSC FIREPROOF SELF CLOSING DIA. DIAM DIAMETER

FRT FIRE-RETARDANT ClG CEILING DIM DIMENSION FlG FLASHING CEM CEMENT DIS OISPENSER

C.Ml. CENTER MULLION FLR. FL FLOOR (ING) DIV DIVISION

F.B.A. FLUSH-BOLT AUTOMATIC CER CERAMIC DR DOOR F.B.M. FLUSH-BOLT MANUAL CT CERAMIC TILE D.P.S. DOOR POSITION SWITCH

CTR COUNTER DS DOWNSPOUT F.P. FLUSH PULL

CHBD CHALKBOARD F.P.T. FOOD PASS THRU

GENERAL CONTRACTOR SURVEYOR PAVILION CONSTRUCTION SANTA FE SURVEYING COMPANY CONTACT: ROB OLSON CONTACT: JAMES SANCHEZ 4801 LANG NE, STE 110 1210 LUISA STREET, SUITE 8 ALBUQUERQUE, NM 89109 SANTA FE, NM 87505 PH: (505) 346-0085 PH: (505) 992-3211

FD FLOOR DRAIN JF FRZ FREEZER K.P.

FPl FLOOR PLATE lBl FND FOUNDATION LAB F.S.T. FEMALE STAFF TOILET LAD GA GAGE. GAUGE LAV GV. GALV GALVANIZED lW GEN GENERAL lWC G.C. GENERAL CONTRACTOR II Gl GLASS. GLAZING L.G.

GB GRAB BAR lVR GD GRADE. GRADING L.S.S.

GVl GRAVEL LPT. LP

GT GROUT M

HDW HAROWARE MH HVAC HEATING/VENTlLATION/ MAS

AIR CONDITIONING MAX

HT. H HEIGHT MO

HP HIGH POINT

HC HANDICAPPED MECH

HC HOLLOW CORE MNB

HM HOLLOW METAL MTl.MET

HB HOSE BIBB MFD

HWN HOT WATER HEATER M.B.S.

HR HOUR MTFR

LT. INMATE TOILET MWK

MIN INCL INCLUDE (D). (lNG)

MIR IW INDIRECT WASTE

ID INSIDE DIAMETER MISC

INFO INFORMATION M.S.T.

NOM INSUL INSULATE (D). (ION)

N INT INTERIOR

INV INVERT NIC

IR INFRARED NTS DC

SOILS ENGINEER GEO-TEST, INC.

CONTACT: CHARLES M. MILLER, P.E. 3204 RICHARDS LANE SANTA FE, NM 87505 PH: (505) 471-1101

JOINT FILLER OPH OPPOSITE HAND S SADDLE/Sill

KICK PLATE 00 OUTSIDE DIAMETER SCH SCHEDULE

LABEL O.H.S. OVER-HEAD STOP SCN SCREEN

LABORATORY OA OVERALL S.T.O. SPEAK-THRU OPENING

LADDER O.H.C. OYER-HEAD CLOSER SEC SECTION

LAVATORY PNl PANEL S.F. SEAMLESS FLOORING

LIGHTWEIGHT PB PANIC BAR SHM SECURITY HOLLOW METAL

LIGHTWEIGHT CONCRETE PTD PAINTED SH SHELF. SHELVING

LIVE lOAD PP PUSH PLATE SIM SIMILAR

LOCK GUARD PAVT PAVEMENT SKl SKYLtGHT

LOUVER PERF PERFORATE (0) SC SOUD CORE

LOCK STATUS SWITCH PERI PERIMETER SR SENIOR

LOW POINT PLAS PLASTER SP SOUNDPROOF

MALE Pl PLATE SPEC SPECIFICATION

MANHOLE PLAST LAM PLASTIC LAMINATED f!sSTl. ST. STL. PG PLATE GLASS

STAINLESS STEEL MASONRY

PlYWD.PWD PLYWOOD STl STEEL MAXIMUM MASONRY OPENING PSF POUNDS PER SQURE FOOT STRUCT STRUCTURAL

MECHANICAL PSI POUNDS PER SQUARE INCH STOR STORAGE

MEMBRANE PROV PROVIDE

METAL RAD RADIUS ,

METAL FLOOR DECKING REF REFERENCE

METAL BLDG. SYSTEM RFL. REFl REFLECT (ED)

METAL FURRING REFR REFRIGERATOR

MILLWORK REQ'D REQUIRED

MINIMUM REG REGISTER

MIRROR REINF REINFORCED

MISCELLANEOUS RET RETURN

MALE STAFF TOilET RA RETURN AIR

NOMINAL REV REVISION (s), REVISED

I RH RIGHT HAND NORTH

NOT IN CONTRACT RVT RIVET

NOT TO SCALE RO ROOF DRAIN

ON CENTER (S)

CIVIL ENGINEER DESIGN ENGINUITY, LLC

CONTACT: ORALYNN GUERRERORTIZ 1421 LUISA STREET, SUITE E SANTA FE, NEW MEXICO 87505 PH: (505) 989-3557

SD STORM DRAIN

STO STANDARD

TK8D TACK BOARD

TEL TELEPHONE

TV TV TELEVISION

TEM TEMPORARY

TH THICK (NESS)

TPD TOILET PAPER DISPENSER

TSl/T.D.S. TOP OF SLAB

TST/T.O.S. TST/T.O.S. TOP OF STEEL

TB TOWEL BAR

TYP lYPICAL

UC UNDERCUT

Ul UNDERWRITERS LABORATORY

LANDSCAPE DESIGNER THE GROUNDSKEEPER

CONTACT: ANDY CARBONE P.O. BOX 10490 5670 PINO AVE. NE ALBUQUERQUE, NEW MEXICO 87184 PH: (505) 888-1727

DUTY & GERMANAS ARCHITECTS , INC 404 KIVA COURT, SUITE G - SANTA FE, NEW MEXICO 87505

Email: dgarch itects@qwestoffice_net

UR VB

V.I.F.

VERT

VCT

VEST

VF

WC

WP

WP

WS WFS

WWF

WS

W

WIN

WG

WD

URINAL

VAPOR BARRIER

VERIFY IN FIELD ~ VERTICAL STONE/GRAVEL

VINYL COMPOSITION TILE

VESTIBULE

l2sr~4~-'-n VINYL FABRIC CONCRETE

WATER CLOSET

WATERPROOFING

WIRE PULL I II/I /1 / 1/1/ \ /1 /1/ BAn INSULATION

WATERSTOP

WALL/FLOOR STOP

WELDED WIRE FABRIC f"OgOf¥iiiiiiil RIGID INSULATION

WEATHER STRIPPING

WIDTH, WIDE

~:::III:::III:::~ WINDOW EARTH

WIRED GLASS

WOOD

~ METAL

~~~ EXPOSED WOOD

GLASS (IN SECTION)

I .-. ' I :-" .. , -. STUCCO

V///J MASONRY

STRUCTURAL ENGINEER CHRIS R. WALKER CONSULTING ENGINEERS

CONTACT: CHRIS WALKER 1919 FIFTH STREET, SUITE E SANTA FE, NM. 87505 PH: (505) 424-3232

MECHANICAL ENGINEER DAVID KENNEY, P.E. MECHANICAL ENGINEERING

CONTACT: DAVID KENNEY 7007 WYOMING BLVD. NE ALBUQUERQUE, NM. 87109 PH: (505) 345-3333

4 ELEVATION NUMBER

SHEET NUMBER

~-------4 SECTION NUMBER

SHEET NUMBER ,

'0 INTERIOR ELEVATIONS

,

0- INDICATES PARTITION TYPES

ROOM NAME ROOM NAME AND NUMBER

fij

0 WINDOW NUMBER

(0 DOOR NUMBER

_.I @2 r 1 I J

DETAIL BUBBLE

-----@---- COLUMN GRIO

~ EL:+O'-O· 1.0. SLAB

ELEVATION/LOCATION

@ D OETAll SECTION

ELECTRICAL ENGINEER PEAK POWER ENGINEERING, INC

CONTACT: DAVID GONZALES 1309 AGUA FRIA SANTA FE, NM. 87501 PH: (505) 982-7071

VILLA ALEGRE PHASE THREE CONSTRUCTION SET DATE: 09-09-2011

Page 2: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,

PLOT DATE

FILE NAME

IN D EX TO DRAWINGS • • 60}N w~~

ff~"'C> fi!\° GENERAL PROJECT INFORMATION COMMUNITY BUILDING ONE-BEDROOM RESIDENTIAL UNIT TWO-BEDROOM RESIDENTIAL UNIT ~Q f 2~ .j '-.;p _tl\~ ~ l'(;/tf[uJIt

~ .. --.-

COVER ZONING & CODE ANALYSIS ARCHITECTURAL ARCHITECTURAL ARCHITECTURAL ARCHITECTURAL

CO.1 INDEX TO DRAWINGS A1.0 SITE PLAN & DETAILS A2.0CB FLOOR PLANS A2.0A FLOOR PLAN A2.0B FLOOR PLAN -

BOUNDARY SURVEY A1.1 BUILDING LAYOUT PLAN A2.1CB REFLECTED CEILING PLAN A2.1A ROOF & REFLECTED CEILING PLAN A2.1B ROOF & REFLECTED CEILING PLAN . -""- ._--- ---- ._.-" _ ....

A1.2 SITE DETAILS A2.2CB ROOF PLAN A3.0A BUILDING ELEVATIONS A3.0B BUILDING ELEVATIONS -------------

CIVIL A5.0 COMMON BUILDING DETAILS A2.3CB FINISHES PLAN A4.0A BUILDING SECTIONS A4.0B BUILDING SECTIONS - ---

C-1 CITY GENERAL NOTES A5.1 COMMON UNIT DETAILS A3.0CB BUILDING ELEVATIONS A6.0A SCHEDULES A4.1B BUILDING SECTIONS - -

C2 PROJECT CONSTRUCTION NOTES A6.1 COMMON WINDOW & DOOR DETAILS A4.0CB BUILDING SECTIONS A7.0A INTERIOR ELEVATIONS A6.0B SCHEDULES- ill C3 SANITARY SEWER PLAN AS.O RADON REMEDIATION PLANS A5.0CB STAIR DETAILS A7.0B INTERIOR ELEVATIONS Ci ----- -------- ------- --

C4 SANITARY SEWER P & P A6.0CB SCHEDULES A7.1B INTERIOR ELEVATIONS \D Cl

ill 0 0 C5 WATER & FIRE PROTECTION PLAN STRUCTURAL A7.0CB INTERIOR ELEVATIONS ._--_.

ill ill Il..)(

£6 GRADING & DRAINAGE PLAN S1.0 BUILDING FOUNDATIONS PLANS STRUCTURAL STRUCTURAL {i Iw -- -«I

C7 GRADING & DRAINAGE PLAN S4.0 STRUCTURAL NOTES S1.0A FOUNDATION & ROOF FRAMING PLANS S1.0B FOUNDATION PLANS --1 STRUCTURAL I 0 -

3: CS MISC DETAILS S5.1 STRUCTURAL DETAILS S1.0CB FOUNDATION PLAN S2.0A ROOF FRAMING & WIND LOADING S2.0B ROOF FRAMING PLANS & <C f- ...J w

- ---- - -- w z A CITY SEWER STANDARDS S5.2 STRUCTURAL DETAILS S2.0CB FLOOR FRAMING PLAN STRUCTURE WIND LOADING ill

D w'

B CITY SEWER STANDARDS S3.0CB ROOF FRAMING & WIND LOADING Ul OIL ~---

<C z

C CITY SEWER STANDARDS MECHANICAL « --« -------~~ -- ----- - ------ ------ - ----- ------ ---- II-

D CITY SEWER STANDARDS MO.01 MECHANICAL GENERAL NOTES MECHANICAL MECHANICAL MECHANICAL --1 I -«z

D- 0-«

MO.02 MECHANICAL EQUIPMENT SCHEDULE M2.0CB HVAC PLAN M2.0A HVAC PLAN M2.0B HVAC PLAN --1 If)

.- - - --, .. _-

MO.03 MECHANICAL DETAILS M3.0CB WASTE & WATER PIPING PLAN M3.0A WASTE & WATER PIPING PLAN M3.0B WASTE & WATER PIPING PLAN ------------- - ---- ---- -----

LANDSCAPE M1.0 MECHANICAL SITE PLAN M4.0CB WATER PIPING PLAN > L 1.0 IRRIGATION PLAN M5.0 HYDRONIC PIPING FLOW DIAGRAMS

L2.0 LANDSCAPE PLAN - -.. -~--------.~ ---

ELECTRICAL

EO.O ELECTRICAL LEGEND ELECTRiCAL ELECTRICAL ELECTRICAL ----_. - .. ----- -- ---- ... ---- .. ---------. . .. _",-._._--- --------- --,-_ .. - . - -,,-,--- -,.--, ---

EO.1 LIGHTING FIXTURE SCHEDULE E1.0CB ELECTRICAL LIGHTING PLAN E1.0A ELECTRICAL LIGHTING PLAN E1.0B ELECTRICAL LIGHTING PLAN - ------ . -

ES1.0 ELECTRICAL SITE LIGHTING PLAN E2.0CB ELECTRICAL POWER PLAN E2.0A ELECTRICAL POWER PLAN E2.0B ELECTRICAL POWER PLAN

ELECTRICAL SITE UTILITY PLAN ELECTRICAL ROOF PLAN ELECTRICAL ROOF PLAN REVISIONS,

ES2.0 E3.0CB ELECTRICAL SPECIAL SYSTEMS PLAN E3.0A E3.0B NO. DATE BY --- --- ---- ---- - - ---- ----.-

ES3.0 ELECTRICAL SITE RISER DIAGRAM E4.0CB ELECTRICAL ROOF PLAN E4.0A ELEC. SERVICE RISER DIAGRAM E4.0B ELEC. SERVICE RISER DIAGRAM -

ES4.0 COMMUNICATIONS SITE PLAN E5.0CB ELEC. SERVICE RISER DIAGRAM

BUILDING TYPE UNIT ADDRESSES PERMIT NUMBER

TlAIO BEDROOM DUPLEX UNITS 2 ci 4 2011020326 DATE,

ONE BEDROOM FOUR-PLEX UNITS 6, 8, 10 ~ 12 201102032Cf 0'1-0'1-11

DRA0IN BY,

TlAIO BEDROOM DUPLEX UNITS 14 ~ 16 LH/CWR

2011020330 CHECKED BY,

--

ONE BEDROOM FOUR-PLEX UNITS 18, 20, 22 ~ 24 2011020331 (lAIITH PLAN OFFSET) DUTY ~ ONE BEDROOM FOUR-PLEX UNITS 26, 28, 30 ci (lAIITH PLAN OFFSET)

32 2011020332 6ERMANAS - ---

TlAIO BEDROOM DUPLEX UNITS 34 ~ 36 2011020333 ARGHITEGTS

ONE BEDROOM SIX-PLEX UNITS 38, 40, 42, 44, 46 ~ 48 2011020334 404 KIVA COURT, 5TE G SANTA FE, NM 87505 PH, (505) "18"1-8882

TlAIO BEDROOM FOUR-PLEX UNITS 50, 52, 54, ~ 56 2011020335 FAX, (505) "18"1-"1088

COMMUNITY BUILD IN6 UNITS 58 ci 60 2011020323 SHEET

(lAIITH CARETAKER)

CO.I

tsheridan
Highlight
Page 3: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,
Page 4: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,
Page 5: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,
Page 6: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,
Page 7: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,
Page 8: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,
Page 9: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,
Page 10: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,
Page 11: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,
Page 12: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,
Page 13: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,
Page 14: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,
Page 15: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,
Page 16: VI L LA ALEGRE PHASE THREE (AKA: CAMPO ALEGRIA) Alegra Phase III...vi l la alegre -phase three (aka: campo alegria) ... work these drawings with project manual ... design enginuity,