CPROJECT TITLE:PROVISION OF PRESSURE VESSEL REPLACE AND MODIFICATION FOR FPU DH01 DRYDOCK CAMPAIGN, BLOCK 05.1A, OFFSHORE VIETNAM

PACKAGE DESCRIPTION: PROVIDE PROCESS VESSELS AND MODIFICATION OF PROCESS VESSELSPACKAGE NO.:TBA ALPHA PROJECT :TBA PO NO./CONTRACT NO.: 198/PVEP POC-CPMVENDOR: SOUTHERN PETROLEUM CONSTRUCTION J.S COMPANYRev.: A Date :ItemNo.Document Code NumberDrawing / Document DescriptionProject Data Code SequenceNo.Forecast Submission Date SUBMITTED TO DAI HUNGRETURNED FROM DAI HUNGManual RemarkPlan DateActual 1TT No.Actual 2RQ'ED DATEActual 1'StatusDrawing - General1A.01-0001General Arrangement Drawings For 2nd Stage SeparatorA.0100013/10/143/10/14DK2A.01-0002General Arrangement Drawings For Surge Drum SeparatorA.0100023/10/143/10/14DK3A.01-0003General Arrangement Drawings For Main Air ReceiverA.0100033/10/143/10/14DK4A.01-0004General Arrangement Drawings For 1st Stage SeparatorA.0100043/10/143/10/14DK5A.01-0005General Arrangement Drawings For L.P FLARE K.O DRUMA.0100053/10/143/10/14DK6A.01-0006General Arrangement Drawings For Reject Oil Flash DrumA.0100063/10/143/10/14DK7A.01-0007General Arrangement Drawings For Test SeparatorA.0100073/10/143/10/14DK8A.01-0008General Arrangement Drawings For Nitrogen ReceiverA.0100083/10/143/10/14AECC9A.01-0009General Arrangement Drawings For Moon Pool Air ReceiverA.0100093/10/143/10/14AECC10A.01-0010Process Drawings For 1st Stage SeparatorA.0100103/10/143/10/14DK11A.01-0011Process Drawings For Test SeparatorA.0100113/10/143/10/14DK12A.02-0001Detail Vessel Fabrication Drawings For 2nd Stage SeparatorA.0200012/24/142/24/14DK13A.02-0002Detail Vessel Fabrication Drawings For Surge Drum SeparatorA.0200022/24/142/24/14DK14A.02-0003Detail Vessel Fabrication Drawings For Main Air ReceiverA.0200032/24/142/24/14DK15A.02-0004Detail Vessel Fabrication Drawings For 1st Stage SeparatorA.0200042/24/142/24/14DK16A.02-0005Detail Vessel Fabrication Drawings For L.P FLARE K.O DRUMA.0200052/24/142/24/14DK17A.02-0006Detail Vessel Fabrication Drawings For Reject Oil Flash DrumA.0200062/24/142/24/14DK18A.02-0007Detail Vessel Fabrication Drawings For Test SeparatorA.0200072/24/142/24/14DK19A.02-0008Detail Vessel Fabrication Drawings For Nitrogen ReceiverA.0200082/24/142/24/14AECC20A.02-0009Detail Vessel Fabrication Drawings For Moon Pool Air ReceiverA.0200092/24/142/24/14AECC21A.03-0001Name Plate Drawings For 2nd Stage SeparatorA.0300012/24/142/24/14DK22A.03-0002Name Plate Drawings For Surge Drum SeparatorA.0300022/24/142/24/14DK23A.03-0003Name Plate Drawings For Main Air ReceiverA.0300032/24/142/24/14DK24A.03-0004Name Plate Drawings For For 1st Stage SeparatorA.0300042/24/142/24/14DK25A.03-0005Name Plate Drawings For For L.P FLARE K.O DRUMA.0300052/24/142/24/14DK26A.03-0006Name Plate Drawings For For Reject Oil Flash DrumA.0300062/24/142/24/14DK27A.03-0007Name Plate Drawings For For Test SeparatorA.0300072/24/142/24/14DK28A.03-0008Name Plate Drawings For Nitrogen ReceiverA.0300082/24/142/24/14AECC29A.03-0009Name Plate Drawings For Moon Pool Air ReceiverA.0300092/24/142/24/14AECC30A.04-0001Junction Box termination drawings- N/AA.0400012/24/142/24/1431A.05-0001Manufacturing and delivery plan/Fabrication scheduleA.0500012/24/142/24/14AECC32A.07-0001List of sub-Vendors and subcontracted workA.0700012/24/142/24/14AECC33A.08-0001 Mechanical Data Sheet For 2nd Stage SeparatorA.0800013/10/143/10/14DK34A.08-0002 Mechanical Data Sheet For Surge Drum SeparatorA.0800023/10/143/10/14DK35A.08-0003 Mechanical Data Sheet For Main Air ReceiverA.0800033/10/143/10/14DK36A.08-0004 Mechanical Data Sheet For 1st Stage SeparatorA.0800043/10/143/10/14DK37A.08-0005 Mechanical Data Sheet For L.P FLARE K.O DRUMA.0800053/10/143/10/14DK38A.08-0006 Mechanical Data Sheet For Reject Oil Flash DrumA.0800063/10/143/10/14DK39A.08-0007 Mechanical Data Sheet For Test SeparatorA.0800073/10/143/10/14DK40A.08-0008 Mechanical Data Sheet For Nitrogen ReceiverA.0800083/10/143/10/14AECC41A.08-0009 Mechanical Data Sheet For Moon Pool Air ReceiverA.0800093/10/143/10/14AECC42A.08-0009Equipment Data Sheet For InstrumentsA.0800093/10/143/10/14AECC/DK43A.09-0001Vendor Document register ListA.0900012/24/142/24/14AECC44A.10-0001 Sling Lifting Arrangement Drawings For 2nd Stage SeparatorA.1000013/10/143/10/14DK45A.10-0002 Sling Lifting Arrangement Drawings For Surge Drum SeparatorA.1000023/10/143/10/14DK46A.10-0003 Sling Lifting Arrangement Drawings For Main Air ReceiverA.1000033/10/143/10/14DK47A.10-0004 Sling Lifting Arrangement Drawings For 1st Stage SeparatorA.1000043/10/143/10/14DK48A.10-0005 Sling Lifting Arrangement Drawings For L.P FLARE K.O DRUMA.1000053/10/143/10/14DK49A.10-0006 Sling Lifting Arrangement Drawings For Reject Oil Flash DrumA.1000063/10/143/10/14DK50A.10-0007 Sling Lifting Arrangement Drawings For Test SeparatorA.1000073/10/143/10/14DK51A.10-0008 Sling Lifting Arrangement Drawings For Nitrogen ReceiverA.1000083/10/143/10/14AECC52A.10-0009 Sling Lifting Arrangement Drawings For Moon Pool Air ReceiverA.1000093/10/143/10/14AECC53A.11-0001 Weld Map Drawings For 2nd Stage SeparatorA.1100013/10/143/10/14AECC54A.11-0002 Weld Map Drawings For Surge Drum SeparatorA.1100023/10/143/10/14AECC55A.11-0003 Weld Map Drawings For Main Air ReceiverA.1100033/10/143/10/14AECC56A.11-0004 Weld Map Drawings For 1st Stage SeparatorA.1100043/10/143/10/14AECC57A.11-0005 Weld Map Drawings For L.P FLARE K.O DRUMA.1100053/10/143/10/14AECC58A.11-0006 Weld Map Drawings For Reject Oil Flash DrumA.1100063/10/143/10/14AECC59A.11-0007 Weld Map Drawings For Test SeparatorA.1100073/10/143/10/14AECC60A.11-0008 Weld Map Drawings For Nitrogen ReceiverA.1100083/10/143/10/14AECC61A.11-0009 Weld Map Drawings For Moon Pool Air ReceiverA.1100093/10/143/10/14AECCMechanical / Structural62B.01-0001Mechanical Calculations For 2nd Stage SeparatorB.0100012/24/142/24/14DK63B.01-0002Mechanical Calculations For Surge Drum SeparatorB.0100022/24/142/24/14DK64B.01-0003Mechanical Calculations For Main Air ReceiverB.0100032/24/142/24/14DK65B.01-0004 Mechanical Calculations For 1st Stage SeparatorB.0100042/24/142/24/14DK66B.01-0005 Mechanical Calculations For L.P FLARE K.O DRUMB.0100052/24/142/24/14DK67B.01-0006Mechanical Calculations For Reject Oil Flash DrumB.0100062/24/142/24/14DK68B.01-0007 Mechanical Calculations For Test SeparatorB.0100072/24/142/24/14DK69B.01-0008 Mechanical Calculations For Nitrogen ReceiverB.0100082/24/142/24/14AECC70B.01-0009Mechanical Calculations For Moon Pool Air ReceiverB.0100092/24/142/24/14AECC71B.01-0010Lifting CalculationsFor 2nd Stage SeparatorB.0100103/10/143/10/14DK72B.01-0011Lifting Calculations For Surge Drum SeparatorB.0100113/10/143/10/14DK73B.01-0012Lifting Calculations For Main Air ReceiverB.0100123/10/143/10/14DK74B.01-0013Lifting Calculations For 1st Stage SeparatorB.0100133/10/143/10/14DK75B.01-0014 Lifting Calculations For L.P FLARE K.O DRUMB.0100143/10/143/10/14DK76B.01-0015Lifting Calculations For Reject Oil Flash DrumB.0100153/10/143/10/14DK77B.01-0016 Lifting Calculations For Test SeparatorB.0100163/10/143/10/14DK78B.01-0017Lifting Calculations For Nitrogen ReceiverB.0100173/10/143/10/14AECC79B.01-0018Lifting Calculations For Moon Pool Air ReceiverB.0100183/10/143/10/14AECCQA / Certification80B.01-0019Process Utility Calculations For 1st Stage SeparatorB.0100192/24/142/24/14DK81B.01-0020Process Utility Calculations For Test SeparatorB.0100202/24/142/24/14DK82B.02-0001Reliability/Availability Data-N/AB.0200014/21/144/21/1483B.03-0001Instrument Hook-Ups- N/AB.0300015/19/145/19/1484B.04-0001Spare Parts and Interchangeably Record-N/AB.0400018WPTT/P8WPTT/P85B.05-0001Inspection and Test PlanB.0500012/24/142/24/14AECC86B.06-0001Quality PlanB.0600012/24/142/24/14AECC87B.07-0001Painting Procedure-N/AB.0700012/24/142/24/1488C.01-0001Radiographic Testing ProcedureC.0100018WPTT/P8WPTT/PAECC89C.01-0002Magnetic Particle Testing ProcedureC.0100028WPTT/P8WPTT/PAECC90C.01-0003ULTrasonic Testing ProcedureC.0100038WPTT/P8WPTT/PAECC91C.01-0004Liquid Penetrant Testing ProcedureC.0100048WPTT/P8WPTT/PAECC92C.02-0001Welding and welding repair Procedures/WPS/PQR/WQTC.0200018WPTT/P8WPTT/PAECC93C.03-0001Hydrostatic Test ProceduresC.0300018 WPTT/P8 WPTT/PAECC94C.04-0001Surface Preparation and Painting ProceduresC.0400012/24/142/24/14AECC95C.05-0001Post Weld Heat Treatment ProceduresC.0500018 WPTT/P8 WPTT/PAECC96D.01-0001Cleaning/flushing/Record-N/AD.0100012WAT/P2WAT/P97D.02-0001Certificate of ComplianceD.0200012WAT/P2WAT/PAECC98D.03-0001Hydrostatic Test RecordD.0300012WAT/P2WAT/PAECC99D.04-0001Functional Test ReportD.0400012WAT/P2WAT/PAECC100D.05-0001Equipment Hazardous Area CertificatesD.0500018WPTD8WPTDAECC101D.08-0001Welder qualification recordsD.0800018WPTT/P8WPTT/PAECC102D.09-0001NDE Technician CertificatesD.0900014 WPTT/P4 WPTT/PAECC103D.10-0001NDE's Test CertificateD.1000012WAT/P2WAT/PAECC104E.01-0001Instruction for Commissioning-N/AE.0100018WPTD8WPTD105E.02-0001User/Operating ManualsE.0200016WPTD6WPTDAECC

Abbreviation Used:MilestoneWAFOWeeks after Firm OrderWPTPWeeks Prior To ProductionFirm OrderWPTTWeeks Prior To Test 1 ProcessProduction StartWATWeeks after Test 1 ProcessTest! ProcessWPTDWeeks Prior To DeliveryTest I ProcessWADWeeks after DeliveryDeliveryFRFor ReviewFAFor Approval

Page &P of &N

VENDOR DATA SCHEDULE


Recommended