Bus 2DFW
Bus 4SA
Bus 5VAL
Bus 6COAL
Bus 7WIND
300 km
250 km
150 km300 km
400 km
500 km400 km
Bus 3UT
Bus 1HOU
Positive-sequence line constants for each 345kV circuit:
• R = 0.06 Ω/km per conductor
• L = 1 µH/m
• C = 12 pF/m
• Rating = 800 A per conductor
• From the L, XL (500 km) = 188.5 Ω
• For 345 kV, 100 MVA base, Zbase = 1190 Ω
• For each 500 km circuit, XL = 0.158 pu
• Thus, four parallel circuits have XL = 0.040pu, and six parallel circuits have XL = 0.026 pu
Relatively small phase angle variation in central ERCOT
McDonald Observatory
PMU
UT Austin PMU
Bus 2DFWBus 2DFW
Bus 4SA
Bus 4SA
Bus 5VAL
Bus 5VAL
Bus 6COALBus 6COAL
Bus 7WINDBus 7WIND
300 km
250 km
150 km300 km
400 km
500 km400 km
Bus 3UT
Bus 3UT
Bus 1HOUBus 1HOU
Positive-sequence line constants for each 345kV circuit:
• R = 0.06 Ω/km per conductor
• L = 1 µH/m
• C = 12 pF/m
• Rating = 800 A per conductor
• From the L, XL (500 km) = 188.5 Ω
• For 345 kV, 100 MVA base, Zbase = 1190 Ω
• For each 500 km circuit, XL = 0.158 pu
• Thus, four parallel circuits have XL = 0.040pu, and six parallel circuits have XL = 0.026 pu
Relatively small phase angle variation in central ERCOT
McDonald Observatory
PMU
UT Austin PMU
U.T. Pan AmPMU
Synchrophasor Homework Network for ERCOT
U.T. McDonald ObservatoryPMU
Oscilloscope View. If UT Austin = 0º ref, then McD leads by 60º, and Pan Am lags by 30º
360º
+60º −30º
Small oscillations in the relative phase angles give an indication grid stability. Essentially, these oscillations provide an “EKG” for large power grids.
Angle Ringdown at McD
1 Minute Window Angle Ringdown at PanAm
1 Minute Window
Frequency, 3 Minutes Beginning April 24, 2011,19:54 CDT
59.98
59.99
60.00
60.01
60.02
60.03
60.04
60.05
0 1 2 3
Minutes
Hz Harris 69
PanAm
Frequency, 3 Minutes Beginning April 24, 2011,19:54 CDT
59.98
59.99
60.00
60.01
60.02
60.03
60.04
60.05
0 1 2 3
Hz Harris 69
McD
Voltage Phase Angle, 3 Minutes Beginning April 24, 2011,19:54 CDT
-1
0
1
2
3
0 1 2 3
Deg
rees
McD
Voltage Phase Angle, 3 Minutes Beginning April 24, 2011,19:54 CDT
18
19
20
21
22
0 1 2 3
Minutes
Deg
rees
PanAm
Unit Trip,
April 24, 2011,
21:15 CDT
Unit Trip,
April 24, 2011,
21:15 CDT
PanAm
McD
Unit Trip, April 24, 2011, 21:15 CDT
Start Sec Stop Sec A t1 B Tau1 t2 C Tau2 Wdamp24.5 28.9 13.31 24.88 13.98 0.14 25.14 0.88 2.97 3.68
Fdamp Zeta0.585 0.092
Unit Trip April 24, 2011, 21:15:25 CDT. McDonald Angle Relative to U.T. Austin
13
14
15
23 24 25 26 27 28 29 30 31 32 33
Seconds
Deg
rees
Measured
Curve Fit
Damped Resonant Frequency, Hz Normalized
Damping Coefficient
Ring Magnitude, degrees
Steady-State Change = 13.98 – 13.31 = 0.7 degrees
McDonald
Start Sec Stop Sec A t1 B Tau1 t2 C Tau2 Wdamp24.5 28.9 17.68 24.62 14.40 0.23 24.93 -2.23 1.58 3.71
Fdamp Zeta0.591 0.170
Unit Trip April 24, 2011, 21:15:25 CDT. Pan Am Angle Relative to U.T. Austin
12
13
14
15
16
17
18
23 24 25 26 27 28 29 30 31 32 33
Seconds
Deg
rees
Measured
Curve Fit
Damped Resonant Frequency, Hz Normalized
Damping Coefficient
Ring Magnitude, degrees
Steady-State Change = 14.40 – 17.68 = -3.3 degrees
Pan Am
Damped Oscillation Frequencies, Magnitudes, and Normalized Damping Ratios for the Hour 21:00 – 22:00 CDT, April 24, 2011
McD Voltage Angle Relative to UT Austin UT Pan Am Voltage Angle Relative to UT Austin
Voltage Phase Angle Relative to UT Austin1-Minute Averages, Tuesday, April 26, 2011, Beginning 09:00 CDT
-50
-40
-30
-20
-10
0
10
20
30
40
50
57 58 59 60 61 62 63 64 65 66 67
Hour of the Week, CDT
De
gre
es
McD
PanAm
West Texas Voltage Phase Angle Advances 80+ Degrees in 6 Hours
UT Pan Am Voltage Phase Angle wrt Central ERCOT
-20
-15
-10
-5
0 1 2 3 4 5
Minute Beginning 07:26 CDT on April 27, 2011
UT Pan Am Voltage Phase Angle wrt Central ERCOT
-15
-10
-5
68 69 70 71 72 73 74 75
Second Beginning 07:26:00 CDT on April 27, 2011
UT Pan Am Voltage Phase Angle wrt Central ERCOT
-20
-15
-10
106 107 108 109 110 111 112 113
Second Beginning 07:26:00 CDT on April 27, 2011
UT Pan Am Voltage Phase Angle wrt Central ERCOT
-20
-15
-10
226 227 228 229 230 231 232 233
Second Beginning 07:26:00 CDT on April 27, 2011
Frequency at Harris 69kV Substation (by UT Austin Campus)
59.80
59.85
59.90
59.95
60.00
60.05
60.10
0 1 2 3 4 5
Minute Beginning 04:51 CDT on April 27, 2011
Frequency at Harris 69kV Substation (by UT Austin Campus)
59.80
59.85
59.90
59.95
60.00
60.05
0 1
Minute Beginning 04:51 CDT on April 27, 2011