Background
Established in Singapore in 2011 as a construction and engineering company
• Primarily involved in the engineering, construction and maintenance project including turnarounds, in the
Power Plants, Petrochemical, Pharmaceutical, Semi-conductors and Manufacturing industries
• P3 Project have completed numerous notable major projects in Singapore, Myanmar and Thailand including
2 power plant projects in Singapore & Thailand
• P3 Project is currently the resident contractor for 5 major pharmaceutical clients in Singapore and actively
involved in oil & gas and chemical plant projects in Jurong Island, Singapore
• Today, P3 Project has expanded regionally in Malaysia and Myanmar with affiliations in Indonesia, Thailand,
Vietnam and continuously expanding for new opportunities
Vision & Mission
Vision
To be a leading in engineering and construction solution provider, locally and regionally
Mission Statement
To achieve as a one-stop solution provider in engineering and construction, through creative collaboration and
service innovation, contributing customer value with highest safety excellence
Business Activity
Engineering & Construction
• Heavy Lifting & Equipment Installation
• Power Plant Installation
• Plant Daily Maintenance including Turnaround Works
• Plant & Machinery Transfer / Relocation including Logistics Services
• Tower Field Works for Refinery & Petrochemical
• Manpower Contract Service
• Precast Concrete Installation
Contacts
INDONESIAPT TAT SENG INDOPERKASAJALAN ENGKU PUTRI, TUNAS INDUSTRIAL ESTATE, BLOCK 4-KBATAM CENTRE, INDONESIATEL : +62 778 471 477, FAX : +62 778 471 478EMAIL : [email protected]
THAILANDGENESIS ENGINEERING & TECHNICAL SERVICE COMPANY LIMITED 111/2 MOO 3, T.CHALAKBOK A.BANKAIRAYONG 21120, THAILANDTEL : +66 (0) 38 646 712/3/4, FAX +66 (0) 38 646 715EMAIL : [email protected] : www.genesisthai.com
VIETNAMSON HA CONSTRUCTION & MECHANICAL CO., LTD(CÔNG TY TNHH CƠ KHÍ VÀ XÂY DỰNG SƠN HÀ)
1/20B STREET 4-QUARTER 2, BINH THO WARD-THU-DUCDISTRICT HCMC, VIETNAM(ĐỊA CHỈ; 1/20B ĐƯỜNG SỐ 4-KHU PHỐ 2-PHƯỜNG BÌNH THỌ-QUẬN
THỦ ĐỨC-TP.HCM)
TEL/FAX : +84 8 37222 8194EMAIL : [email protected] WEB : www.sonhaec.com
P3 PROJECT SDN BHD - MALAYSIANO. 6 JLN SETIA TROPIKA 1/1TAMAN SETIA TROPIKA81200 JOHOR BAHRU, JOHORTEL : +60 16-711-3971EMAIL : [email protected]
P3 PROJECT (MYANMAR) CO., LTD
No 302, LEVEL 3, BLK B(14)
SHWE GABAR HOUSING, MINDAMA RD
MAYANGONE TOWNSHIP, YANGON,
MYANMAR
TEL : +95-925-010-9892
EMAIL : [email protected]
HEADQUARTERS8 BOON LAY WAY #09-04TRADEHUB 21SINGAPORE 609964TEL : +65 6515-5070FAX : +65 6515-6040EMAIL : [email protected]
WORKSHOP (556SqMeter)32 OLD TOH TUCK ROAD#05-03 I-BIZ CENTRESINGAPORE 597658TEL : +65 6862-0598 FAX : +65 6862-0528
Corporate Address
Closed Relationship Company
Certificates
Building & Construction Authority
Contractor Registration
Membership since Year 2011
WSH Council – Bizsafe
Certified since Year 2011
Association of Process Industry
Membership since Year 2012
Building & Construction Authority
General Builder
Certified since Year 2012
Certificates (Cont.)
BS OHSAS 18001:2007
SS 506 Part 1:2009
Registered since Year 2015
ISO 9001:2015
Registered since Year 2015
Certificates (Cont.)
Singapore Business Federation
Membership since Year 2014
The Singapore Welding Society
Membership since Year 2014
Section (14 Permanent, 13 Contract)
Staff (85 Permanent, 100 Contract)
Department (8 Permanent)
Division (2 Permanent)
Top Management (3 Permanent)
Organization Chart
Director
General Manager
Engineering Division
Project Department
Section
Engineer
Project Coordinator
Maintenance Department
Section
Engineer
Project Coordinator
Business Department
Section
Engineer
QSHE Department
QA/QC
WSH
Document Controller
Administration Division
Finance Department
Accountant
Executive
Officer
HR Department
Executive
Officer
Advisor
Workforce
PETROCHEMICAL37%
PHARMACEUTICAL33%
POWERPLANT25%
CONSTRUCTION
5%
TOTAL BY SECTOR
Project10%
Project & Maintenance
31%
Maintenance21%
Maintenance & ShutDown
15%
ShutDown8%
ShutDown & Project15%
TOTAL BY WORK DISCIPLINE
Power Plant Installation
Power Plant Installation
POWERPLANT INSTALLATION (CONTINUOUS) HRSG
Heat Recovery Steam Generator
INSTALLATION
GAS TURBINE
INSTALLATION
Power Plant Installation
POWERPLANT INSTALLATION (CONTINUOUS)
GENERATOR
INSTALLATION
Power Plant Installation
POWERPLANT INSTALLATION (CONTINUOUS)
EXHAUST DIFFUSER
STEAM TURBINE
OVERHEAD HOIST
POWER ISLAND
Pharmaceutical
Pharmaceutical
PIPING
INSTALLATION
EQUIPMENTS
INSTALLATION
STRUCTURE & PLATFORM
INSTALLATION
WELDING WORK
INSTALLATION OF SULZER SKID
1,2 & VPU AT GSK F.O.F.
PROJECT 2013
Pharmaceutical
Food & Beverage
PIPING
INSTALLATION
EQUIPMENTS
INSTALLATION
STRUCTURE & PLATFORM
INSTALLATION
WELDING WORK
Petrochemical
TURNAROUND PROJECT AT SMAG &
MPS FOR TRAY REPLACEMENT WORKS
Petrochemical
PIPING FABRICATION AT PCS & ESSAR PROJECTS
Petrochemical
STRUCTURE FABRICATION & INSTALLATION
Petrochemical
Other Services
Other Services
Other Services
PRESSUR VESSELS AND TANKS INSTALLATION & MAINTENANCE
Design, Fabricate, Install and Maintenance for Pressure vessels, Heat
exchangers, Condensers, Heaters, Coolers, Dryers, Silo, Storage
vessels, Dust collector, Industrial Ovens, Economizers, Air receiver,
Strainers, Filters , Reactor & Mixing Tanks.
Other Services
PIPING DESIGN, FABRICATE, WELDING &
INSTALLATION
We Fabricate, Supply and Replace pipes made of
any material with different Specifications. We are
able to fabricate custom length pipe and
assemblies for customers in the manufacturing
process plants and utility construction industries.
Other Services
MACHINERY
REMOVAL,
LIFTING AND
INSTALLATION
Track Record
S/N Project Name Work of Scope Location Period
1 Tuas Power CCP5 Mechanical Erection Works for GT/ST/PI & ROP Tuas, Singapore Feb 2012 - Feb 2013
2 Chana Power Mechanical Erection Works for GT/RENO/ST/Condensor/AIS in Gas
and Steam TurbineHatyai, Thailand Feb 2013 - Mar 2014
3 GSK Factory of Future Equipment, Piping and Structure Installaiton Tuas, Singapore Feb 2013 - Dec 2013
4 Jurong Aromatics Project Piping Installation Jurong Island, Singapore Jan 2014 - Jul 2014
5 PCS-3SB Cooling Tower Installation (ISBL) Jurong Island, Singapore Aug 2013 - Dec 2013
6 PCS-3SB Piping Installation (OSBL) Jurong Island, Singapore Aug 2013 - Mar 2014
7 Chevron Oronite Project Piping, Structure & Installation of Decanter Jurong Island, Singapore Feb 2013 - Jun 2013
8 MSD WWTP Project Demolition of WWTP Tuas, Singapore Sep 2013 - Dec 2013
9 Jurong Aromatics Project Piping Installation Project Jurong Island, Singapore Feb 2014 - Jul 2014
10 Exxonmobil project Turnaround for Steam Turbine Jurong Island, Singapore Sep 2013 - Oct 2013
Track Record (Cont.)
S/N Project Name Work of Scope Location Period
11 MSD International GmbH Daily maintenance Tuas, Singapore Nov 2011 - To Date
12 Baxter Bioscience Manufacturing SARL Daily maintenance Tuas, Singapore Nov 2011 - To Date
13The Valspar Singapore Coporation Pte
LtdDaily maintenance Tuas, Singapore Apr 2014 - To Date
146 Storey Commercial Building
DevelopmentTo supply and installation of a complete chilled water pipe system Tanjong Pagar, Singapore Jul 2014 - To Date
15 REC Pte Ltd Daily maintenance Tuas, Singapore Aug 2014 - To Date
16 SMAG Shut Down Tray Repair & Installation Work for Tower Field Jurong Island, Singapore June 2014 – Jul 2014
17 Shell Seraya TA Tray Repair & Installation Work for Tower Field Jurong Island, Singapore Sep 2014 – Nov 2014
18 REC Solar Singapore Branch Conversation of Halal Kitchen into Boiler House Tuas, Singapore Nov 2015 - Jun 2016
19 MPS Tray Repair & Installation Work for Tower Field Jurong Island, Singapore Mar 2016 - Mar 2016
20 SMAG SMM3 Tray Repair & Installation Work for Tower Field Jurong Island, Singapore Apr 2016 - Apr 2016
Track Record (Cont.)
S/N Project Name Work of Scope Location Period
21 SMAG SMM1 Tray Repair & Installation Work for Tower Field Jurong Island, Singapore Jul 2016 - Jul 2016
22 Exxonmobil Aurora Warehouse Installation of Precast Wall, Frame Steel Structure Jurong Island, Singapore Nov 2015 - Apr 2016
23 Vent Header Fabrication and Installaion Air Lines Tuas, Singapore Jan 2015 - Dec 2015
24 Vent Header Phase 2 Fabrication and Installaion Air Lines Tuas, Singapore Jun 2016 - Jan 2017
25 ERPTP ERP-002 replacement of explosion venting panel at sterod and
synthesis buildingTuas, Singapore Jun 2016 - Jan 2017
26 IPA Fire water main line Tuas, Singapore Sep 2015 - Apr 2016
27 SMAG SMM1 Tray Repair & Installation Work for Tower Field Jurong Island, Singapore Apr 2017 - Apr 2017
28 Desloratadine (DCL) ProjectMechanical & Architectural works including M&E equipment and
Scaffolding includes PSV, PSE for MSD Tuas, Singapore Apr 2016 - Apr 2017
29 Comil ProjectInstallation of Comil MI-83336, construction, piping and mechanical
work. Tuas, Singapore Nov 2016 - To Date
30 SGMX Project Equipment Installation & Piping Fabrication Tuas, Singapore Feb 2017 - To Date
Track Record (Cont.)
S/N Project Name Work of Scope Location Period
31 Silesia Flavours South East Asia Mechanical Installation Silesia, Singapore Jun 2017 - Mar 2018
32 Glaxo Smith Kline Biologicals Daily Maintenance Tuas , Singapore May 2016 - Jul 2017
33Amgen Singapore Manufacturing Pte
LtdDaily Maintenance Tuas, Singapore May 2016 - Jul 2017
34
35
36
37
38
39
40
Working
DaysM
gm
t
/Sta
ff
Wo
rke
r
s
To
tal
He
ad
Co
un
t
Me
n
Me
n
Me
n
Da
ng
ero
us
Oc
cu
rre
nc
e
Fir
st
Aid
Ca
se
s
Ne
ar
Mis
s
Ca
se
s
Ca
se
s
Lo
ss
Da
ys
Ca
se
s
Lo
ss
Da
ys
Ca
se
s
Lo
ss
Da
ys
Ca
se
s
Ca
se
s
Lo
ss
Da
ys
Ca
se
s
Ca
se
s
Ca
se
s
Da
ys
Lo
st
Fre
qu
en
c
y
Se
ve
rity
2013 306 91 953 1,044 26,852 214,816 41,153 255,969 255,969 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2014 308 277 1,494 1,771 45,433 363,464 68,853 432,317 688,286 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2015 299 239 496 735 18,323 146,584 17,765 164,349 852,635 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2016 304 484 1,420 1,904 48,268 386,144 72,392 458,536 1,311,171 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2017 90 87 183 270 8,097 64,776 15,602 80,378 1,391,549 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 1,307 1,178 4,546 5,724 146,973 1,175,784 215,765 1,391,549 1,391,549 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Loss Day / Case 0 0 Day 0 Day 0 Day 0 0 0 0
Head Count Per Year Total Working Hours
> 3 Days > 1 Day 0 Day < 3 Days
Inju
ry
(Ho
sp
ita
liza
ti
on
)
Oc
cu
pa
tio
na
l
Dis
ea
se
Inju
ry
(Min
or)
Lost Time Injury (Non - Reportable)
5/6 days
To
tal M
an
-Da
y
No
rma
l H
ou
rs
Ov
ert
ime
Ho
urs
To
tal M
an
-Ho
urs
Cu
mu
lati
ve
Ma
n-
Ho
urs
Lost Time Injury (Reportable)
Inju
ry
(Ma
jor)
P3 PROJECT SAFETY STATISTICS REPORTWORK RELATED
Year
Manpower Man-Hours Incident / Accident
Statistics
Safety Record
Safety Record (Cont.)
Safety Record (Cont.)
FIRE SAFETY DEMOSTRATION
SAFE LIFTING DEMOSTRATIONRISK ASSESSMENT & METHOD STATEMENT BRIEFING
CONFINED SPACE SAFETY DEMOSTRATION
Photos
STRONG FINISHING TEAM RECOGNITION FROM OUR CLIENT
Photos (Cont.)
200,000 MAN-HOURS CELEBRATION 500,000 MAN-HOURS CELEBRATION 1,000,000 MAN-HOURS CELEBRATION
Photos (Cont.)
Main Clients
OEM Plant Owner Main Con
Main Clients
Thank You!