MAINTENANCE OF HYDRAULIC WORKS AND GREEN AREAS FOR THE SAFETY AND THE FUNCTIONALITY OF THE
ROAD AND MOTORWAY INFRASTRUCTURE
- Mr. Valerio MOLINARI- Mr. Andrea RONDINARA 1
THE IMPORTANCE OF THE MAINTENANCE OF HYDRAULIC WORKS AND GREEN AREAS FOR THE SAFETY AND THE FUNCTIONALITY OF THE TRANSPORT INFRASTRUCTURE
Mr. Valerio MOLINARI
2
THE MAINTENANCE OF HYDRAULIC WORKS AND GREEN AREAS HAS A SIGNIFICANT IMPACT ON THE PRESERVATION AND THE FUNCTIONALITYOF BRIDGES, VIADUCTS, OVERPASSES AND THE
TRANSPORT INFRASTRUCTURE ITSELF
Mr. Valerio MOLINARI
3
LACK OF MAINTENANCE OF HYDRAULIC WORKS ON MOTORWAYS
Mr. Valerio MOLINARI
4
LACK OF MAINTENANCE OF GREEN AREAS ON MOTORWAYS
Mr. Valerio MOLINARI
5
CONSEQUENCES OF THE LACK AND INADEQUATE MAINTENANCE
Mr. Valerio MOLINARI
6
WEAKENING OF THE LANDSCAPE AND THE INFRASTRUCTURE
Mr. Valerio MOLINARI
7
G R E E N A R E A S O N M O T O R W A Y S
• REQUIREMENTS IN THE PLANNING PHASE✓Hydroseeding on slopes and embankments✓Use of biodegradable erosion control blankets✓Selection of the most suitable plant species for
different areas✓Use of Soil Bioengineering Techniques✓Grass removal along the inner part of the shoulders✓Installation of fences✓Wildlife crossing structures
• IMPROVEMENT OF THE MAINTENANCE PLANS✓Use of machines and specialized personnel for grass
mowing✓Increase of the workers and road users' safety
TECHNICAL PROPOSALS
Mr. Valerio MOLINARI
8a
PROJECT REQUIREMENTS
Hydroseeding on slopes and embankments
Mr. Valerio MOLINARI
8b
PROJECT REQUIREMENTSHydroseeding and use of the suitable
plant species for different areas
Mr. Valerio MOLINARI
8c
PROJECT REQUIREMENTS
Biodegradable erosion control blankets and
Soil Bioengineering Techniques
Mr. Valerio MOLINARI
9
PROJECT REQUIREMENTSUse of Soil Bioengineering Techniques and
reduction of the environmental impact
Mr. Valerio MOLINARI
10
PROJECT REQUIREMENTSGrass removal along the inner part of the shoulders
Mr. Valerio MOLINARI
11
PROJECT REQUIREMENTSConstruction of the wildlife crossing structures
Mr. Valerio MOLINARI
12
PROJECT REQUIREMENTS
Use of fences
Mr. Valerio MOLINARI
13
PROJECT REQUIREMENTSConstruction of the wildlife crossing structures
Mr. Valerio MOLINARI
14
PROJECT REQUIREMENTSConstruction of the wildlife crossing
structures
Mr. Valerio MOLINARI
15
PROJECT REQUIREMENTSConstruction of the wildlife crossing
structures
Mr. Valerio MOLINARI
16
IMPROVEMENT OF THE MAINTENANCE PLANS
OF GREEN AREAS ALONG THE MOTORWAY NETWORK
Mr. Valerio MOLINARI
17
Use of machines and specialized personnel
Mr. Valerio MOLINARI
18
SAFETY DURING MAINTENANCE WORKS
Mr. Valerio MOLINARI
19
H Y D R A U L I C W O R K S ON M O T O R W A Y S
• REQUIREMENTS IN THE PLANNING PHASE✓Rainwater system✓Vertical drainage systems✓Rainwater storage tanks✓Soil Bioengineering Techniques
• IMPROVEMENT OF THE MAINTENANCE PLANS✓Hydraulic systems of embankments and
trenches✓Hydraulic protection systems of piers,
abutments and manholes✓Retaining walls and gabions✓Cliffs and coastal areas
TECHNICAL PROPOSALS
Mr. Andrea RONDINARA
20
PROJECT REQUIREMENTSRainwater system and vertical drainage systems
Mr. Andrea RONDINARA
21
PROJECT REQUIREMENTSRainwater storage tanks and
Soil Bioengineering Techniques
Mr. Andrea RONDINARA
22
MAINTENANCE OF HYDRAULIC WORKS ON MOTORWAYSHydraulic systems of embankments and trenches
Mr. Andrea RONDINARA
23
MAINTENANCE OF HYDRAULIC WORKS ON MOTORWAYS
✓Hydraulic protection systems of piers and abutments
✓Retaining walls and gabions
Mr. Andrea RONDINARA
24
MAINTENANCE OF HYDRAULIC WORKS ON
MOTORWAYS✓ Manholes
Mr. Andrea RONDINARA
25
CORRECT CONSTRUCTION AND MANAGEMENT OF HYDRAULIC WORKS
Mr. Valerio MOLINARIMr. Andrea RONDINARA
26
CORRECT CONSTRUCTION AND MANAGEMENT OF GREEN AREASON THE MOTORWAY NETWORK
Mr. Valerio MOLINARIMr. Andrea RONDINARA
27
HIGH FUNCTIONALITY AND SAFETY OF THE ROAD AND MOTORWAY NETWORK
Mr. Valerio MOLINARIMr. Andrea RONDINARA
28