OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIATHE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike Gilmore
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Mike Gilmore
Mike Gilmore
Managing Directore-Ready Building Limited
Mobile: +44 (0) 7860 110563
FIA e-mail: [email protected]
e-mail: mike.gilmore
@e-readybuilding.com
Standards Activities
MemberJTC1 SC25 WG3: Generic Cabling
Convenor TC215 WG1: Cabling design
Secretary TC215 WG2: Cabling installation - QA and installation practices
Member TC215 WG3: Facilities and infrastructures: Data Centres
Past-ChairmanTCT7: Telecommunications - Installation Requirements
Chairman TCT7/-/1: Cabling: Infrastructure design, planning and commissioning
Secretary TCT7/-/2: Cabling; Installation and UK implementation
TCT7/-/3: Facilities and infrastructures
Technical and Standards DirectorFibreoptic Industry Association
FIAwww.fia-online.co.uk
DirectorTelecommunications Infrastructure
Advisory Board
Leader - Special Task Force 362 Energy Efficiency and Broadband Deployment
www.tiab-online.co.uk
Industry Roles
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
The Enemy Within!
Optical fibre has proven itself to be a reliable, hi-bandwidth medium
“Apparent” reliability has allowed bad habits to develop
Significant changes to network demands undermine “apparent” reliability
The absence of “end-caps” is symptomatic of bad practice
End-caps do not “in themselves” prevent contamination
Problems may be more deep-seated
Contamination control presents an administrative challenge
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Network Tolerance - 10/100 Mb/s
Channel length (m)
10/100 Mbit/s
Cable loss
Loss allowedfor connections
Max. length supported
10BASE-F and 100BASE-F - targeted at backbone implementations
Typical campus or building backbone length
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Network Tolerance - 1000 Mb/s
Channel length (m)
1000 Mbit/s
10/100 Mbit/s
Cable loss
Loss allowedfor connections
Max. length supported
1000BASE-SX - targeted at data centre and backbone implementations
Typical campus or building backbone length
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Network Tolerance - 10 Gb/s
Channel length (m)
10 Gbit/s
1000 Mbit/s
10/100 Mbit/s
Cable loss
Loss allowedfor connections
Max. length supported
78% of all data centre “switch-switch” lengths
1000BASE-SX - targeted at data centre and backbone implementations
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Network Tolerance - 40/100 Gb/s
10 Gbit/s
40/100 Gbit/s
Channel length (m)
1000 Mbit/s
10/100 Mbit/s
Cable loss
78% of all data centre “switch-switch” lengths
78% of all data centre “switch-server” lengths
Loss allowedfor connections
Max. length supported
40G/100GBASE-S* - targeted at data centre implementations
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Moving The Goalposts - I
High bit rate applications illuminate only part of the optical fibre
1,25 mm
Core
LED launch
VCSELlaunch
0,05 mm50 m
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Moving The Goalposts - II
Parallel
optics
Simplex
optics
Higher bit rate applications adopt parallel optics
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Customer Premises Cabling
DATA CENTRES
Zone distributioncabling subsystem
Main distributioncabling subsystem
Intermediate distribution cabling
subsystem
MD
ID
ZDLDP
LDP
ZDLDP
LDP
ID
ZDLDP
LDP
ZDLDP
LDP
Source: ISO/IEC 24764 + A1:2011 andEN 50173-5 + A2:2011
Multiple connections within a channel (saving equipment costs)Forced air cooling
Many unused optical fibre ports (initially) - pragmatic resilience
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Knowledge Transfer
CORE/ACCESS
NETWORKS
CUSTOMER PREMISES
NETWORKS
Core~ 9 m
Small core - susceptible to contamination Larger core Smaller “lit” area
Few de-mates/re-mates Multiple de-mates/re-mates
Simplex optics
Parallel optics
“One out - all out” risk
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
ContagionTHIS SLIDE CONTAINS INFORMATION AND IMAGES PROVIDED BY JDSU
FAILURE TO INSPECT UNTIL PROBLEMS OCCURCAN CAUSE PERMANENT DAMAGE
After mated contaminated is removed, pits and chips may remain in the opticalfibre rendering the contamination outcomes permanent
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
The Old Ways
INSTALLATION
TESTING
OPERATION
Assume anything that arrives in plastic bag to be “clean”Only inspect on-site termination work
Never inspect
until test results begin to show systematic problems
Assume anything that has an “end-cap” to be “clean”
If a fault occurs following connection:
Give the plug a quick “polish”
Choose a new connection from the paneluntil you find one that works
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
The New World
25120130 250 A
BC
D
Zone
ACore
BCladding
CAdhesive
DContact
25 m
65 m
Dia.
ScratchesDefects
CIRCULARRECTANGULAR
BS EN 61300-3-35:2010
Fibre optic interconnecting devices and passive components - Basic testand measurement procedures - Part 3-35: Examinations and measurements -Fibre optic connector endface visual and automated inspection
ApplicabilityOptical fibre
Connector styles
SINGLEMODEMULTIMODE
Requirements
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Inspect and Clean
BS EN 61300-3-35:2010 Removing human-dependent assessment
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
The FIA Initiative
FIA 200 members
Suppliers Installers Users
APPROVED INSTALLER SCHEME
AUDIT AND ARBITRATION SCHEME
TECHNICAL SUPPORT DOCUMENTS
WHITE PAPERS (www.fia-online.co.uk/epaper-FIA.htm)
OpenAccess
CONTAMINATION MANAGEMENT (2012)
Application Support
Testing
“Fair” SpecificationRisk Managed Planning and Installation
SuppliersASSESSMENT
TOOLS
SuppliersCLEANINGPRODUCTS
FIATechnical Directorate
Installation
Testing
Operation
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Practical Connections
10 Gbit/s
40/100 Gbit/s
Channel length (m)
1000 Mbit/s
10/100 Mbit/s
Cable loss
No room to manouevre
The statistical loss of two worst case “clean” connections
EQP EQP
Channel
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Myths
We do not fight
Hospital Acquired Infectionby wiping our hands on our clothes
Manage the problem properly
orsuffer the consequences
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Myths
The fibre optic cleaning shirt(sleeve)
DOES NOT EXIST!
Manage the problem properly
orsuffer the consequences
© 2011 The Cabling Partnershipwww.it-cabling.com www.e-readybuilding.com
P. O. Box MT65, LEEDS, LS17 8YD. United Kingdom Tel: +44 (0) 113 232 3721
CONTENTS
The Enemy Within
Technological Change
Living with Contamination
The Way Forward
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike GilmoreFIA Technical Director
FIA
Close
THE OPERATIONAL IMPACT OFHIGH BIT RATE
OPTICAL FIBRE NETWORKS
Mike Gilmore