The Final Link in the Sealift Chain
Amphibious Construction Battalion Two
Maritime Prepositioning Force
Joint Logistics Over The Shore (JLOTS)
BENIGN
CMPF
Chain of Command
COMNAVBCHGRUTWO
COMPHIBGRUTWO
COMNAVSURFLANT
CINCLANTFLT
ACB-2 ACU-2BMU-2 ACU-4
Mission Areas
• Causeway Ferry
• Roll On/Roll Off Discharge Facility (RRDF)
• Amphibious Assault Bulk Fuel/Water System (AABFS/AABWS)
• Offshore Petroleum Discharge System (OPDS)
• Elevated Causeway, Modular (ELCAS-M)
• Defensive Military Operations
• Camp Support
Barge Ferry System
• Side Loadable Warping Tug (SLWT)
• Causeway Section Powered (CSP)
• Causeway Section Non-Powered (CNSP)
MPS-1 Lighterage
• 4 SLWTs• 16 CSPs• 14 Intermediates• 16 Beach Ends• 8 LCM-8s
• For Dynamic Mix:
Instream: 8 rolling stock/hour
Pierside: 20/hour.
Roll On/Roll Off Discharge Facility (RRDF)
• 5,000 ft of 6” conduit (Fuel)• 10,000 ft of 4” conduit (Water)• Deploy from Barge Ferry or LCU• Install in 8 hours• 700Kgal/day
Amphibious Assault BulkFuel/Water System
Offshore Petroleum Discharge System (OPDS)
• Single Product 4 NM
• Dual Product 2 NM
• 1.2 Mgal/day
• First Fuel in 48 hrs.
• Total install in 7 days
• Water Depth 35-200 ft.
• Service Life 2 yrs.
Lighterage support w/ OPDS
• SLWT Lighterage support:
• 3 tow tugs• Converted lay repair
barge 1 SLWT • Dive boat - LCM 8
• OUB Lighterage support:
• 3 tow tugs - OUBs• Converted lay repair
barge 1 OUB • Dive boat - OUB
Elevated Causeway-Modular
- Up to 3000 ft length
- 20 FSW at MLW
- 7 Days to Erect
- UCT Site Survey
Defensive Military Operations
Camp Support
• Berthing Tents• Galley/Scullery• Laundry• Showers/Heads• Transportation• Beach Salvage• Water Purification• Medical/Admin