TELANGANA STATE POWER GENERATION CORPORATION LIMITED
From
The Chief Engineer CivilThermal
TSGENCO Vidyut Soudha
Hyderabad-500 082
To
The Member Secretary (Thermal Power)
Indira Paryavaran Bhawan (New building)
Jorbagh New Delhi-110003
Lr No CECThermalSECTCD-IFKTPS-VIIDNo12314 Date 03022015
Dear Sir
Sub TSGENCO-Expansion by Addition of (1x800) MW Supercritical Coal based
Kothagudem Thermal Power Station-VII-Essential Details Sought ndashFurnished- Reg
Ref 1 Our Proposal No IATGTHE247902012 Submission dated 19092014
2 File No J-13012242012-IAII (T)
3 Your email on Essential Details sought dated 13102014
With reference to your email dated 13102014 related to our online application dated
19092014 for expansion of (addition of 1 x 800 MW Supercritical) Coal Based
Kothagudem Thermal Power Station- (VII) for EC We are here by submitting point wise
replies for essential details sought in the email 3rd
cited
1 Latest certified compliance report from Regional Office of MoEFampCC
Dr MT Karuppiah Scientiest-C Ministry of Environment Forest amp Climate Change
Regional Office (South Eastern Zone) - Chennai visited the site and issued the
compliance report on 28112014 The same is attached as Annexure-I for your kind
perusal
2 Status of the Suliary Belwar Coal Block including EC amp FC
Originally the requirement of coal for the project is envisaged from Suliary Belwar Coal
Block Madhya Pradesh being developed by State Mineral Development Corporation The
quality parameters requirement in MTPA etc of the coal are furnished in EIA report
Contdhellip P-2
SCCL Fuel Analysis Details
The coal requirement for the project is 395 MTPA based on GCV 3700 KcalKg Daily coal
requirement is 12023 Tonnes The coal will be sourced from SCCL Telangana State
The Indigenous coal (40 MTPA as per MoU) will be obtained from Ms SCCL a
Government of Telangana under taking An MOU has been signed with Ms SCCL for supply
of 40 MTPA coal and will be transported by rail to the proposed power station
The quality parameters of SCCL Indigenous coal are tabulated in below
Table Analysis of SCCL Coal
Item Indigenous G13
Grade Coal
Indigenous G11
Grade Coal Average grade of Coal
Fixed Carbon 25 30 27
Ash 40 36 38
Volatile matter 30 25 27
Total Moisture 12 10 11
Sulphur lt05 lt062 lt062
HGI 50 50 50
GCV (HHV) KcalKg 3400 4000 3700
The quality of coal offered by SCCL is similar to the quality of coal originally proposed from
Suliary Belwar Coal block
Table Stack and Emission Details
Details Units SCCL Coal
Plant Heat rate KcalKWH 2317
GCV Kcalkg 3700
Fuel consumption
TPH 501
TPD 12023
TPA 395
Flow rate Nm3s 847
Ash Content 38
Sulfur Content 062
PM Emissions gs 423
SO2 Emissions gs 1726
NOx Emissions gs 430
Ash TPD 4560
Fly ash TPD 3648
Bottom ash TPD 912
Note 1) The EIA report prepared based on 100 Indigenous coal (ie Suliary Belwar Coal Block)
2) Calculations based on Indigenous (SCCL) coal of GCV gt3700 Kcalkg
Model Inputs and Results
Based on MoU with SCCL coal the Inputs used to run the model are stack details emission
details and a twenty-four Hours mean meteorological data The stack amp emission details are
shown in the below
Stack and Emission Details
Details Units Proposed Plant
Plant Capacity MW 800
Boiler Capacity TPH 2600
Type of Fuel - Coal
Height of the Stack M 275
Internal Dia of Stack M 7
Temperature of Flue Gas degC 125
Ambient Temperature (mean) degC 318
Velocity of Flue Gas ms 22
Flow Nm3s 847
Fuel Consumption TPH 501
Ash Content (in coal used) 38
Sulfur Content 062
PM Emissions gs 423
SO2 Emissions gs 1726
NOX Emissions gs 430
24 Hour Mean Meteorological Data for Post Monsoon Season
Hr Speed
(ms)
Wind Direction
(Degrees)
Temperature Cloud Cover Relative Humidity
Celsius (OKTAS) ()
1 166 225 201 4 65
2 156 225 198 4 67
3 142 225 192 4 74
4 125 225 184 3 76
5 105 225 178 4 76
6 096 225 186 3 78
7 082 225 208 3 74
8 081 45 222 2 72
9 106 90 244 2 70
10 152 45 264 2 68
11 229 45 284 1 65
12 295 45 291 1 62
13 335 45 302 1 60
14 382 45 314 1 60
15 441 45 312 2 59
16 424 45 304 3 59
17 427 45 291 3 59
18 401 45 272 3 61
19 242 360 254 3 61
20 168 45 232 5 60
21 135 90 217 5 61
22 128 90 21 5 61
23 141 45 21 4 62
24 146 225 20 4 63
Post Project Scenario-Units microgm3
Particulars Particulate Matter
(PM10)
Sulfur Dioxide
(SO2)
Oxides of Nitrogen
(NOX)
Baseline Scenario (Max) 972 414 468
Predicted GLC (Max) 066 240 84
Overall Scenario
(Worst Case)
979 654 552
NAAQ Standards lsquorsquo 100 80 80
Source lsquorsquo MoEF Notification New Delhi 16th November 2009 Schedule VII
The Predicted maximum Ground level concentration of 24 Hour average PM10 SO2 and NOX
concentrations considering 24 hour mean meteorological data of study season are superimposed on the
maximum baseline concentrations obtained during the study period to estimate the post project
scenario which would prevail at the post operational phase The overall post project scenario is shown
in above Table
The isopleths of the predicted concentrations of the monitored pollutants are presented in Figures (A)
(B) (C)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Predicted 24-Hourly Average GLCs of PM (microgm3)
Figure (A)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Figure (B) Predicted 24-Hourly Average GLCs of SO2 (microgm3)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)
3mCr~GOVERNMENT OF INDIA
q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE
CHANGERegional Office (South Eastern Zone)
1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034
TeINo044-2822 2325 E-mail roefcccgmaiIcom
ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003
FNoEP121511AP 1~2JDate 28112014
Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding
Ref (1)(2)(3)(4)
Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014
Madam
In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action
Encls As above
Copy to
1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003
2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO
I ~rtQ~o u (Dr MT Karuppiah)Scientist - C
(Dr MT Karup lah)Scientist - C
GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change
(Regional Office Southern Eastern Zone)Chennai -600 034
MONITORING REPORTPART I
DATA SHEET
FNoEP121511AP
1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify
Thermal
2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)
No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad
3 Clearance leUer(s)OM No anddated
4 Locations
a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N
80deg4134 E
5 Address of correspondence
a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha
Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin
6 Salient features
a of the project Covered in EIAIEMP
Page 1of 19
b of the environmental managementplans
7 Break up of the project area
a Submergence area (forest amp nonshyforests)
bOthers
8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans
a SCSTAdivasisbOthers
9 Financial Details
a Project cost as originally plannedand subsequent revised estimatesand the years of price reference
b Allocations made for environmentalmanagement plans with item wiseand year wise breakup
c Benefit cost ratiointernal rate ofreturn and the years of assessment
d Whether (c) includes the cost ofenvironmental management asshown in (b) above
e Total expenditure on the Project so
Submitted to MoEF during projectappraisal
Nil
8970 Ha (including common areas ofStage-V)
NANA
1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)
1 Green belt Development Rs100 Cr2 Pollution monitoring
instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system
for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection
storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)
Rs 247096 Crores (As per project
Page 2 of 19
far
f Actual expenditure incurred on theenvironmental management plansso far
10 Forest land requirement
a The status of approval for adiversion of forest land for nonshyforestry use
b The status of compensatoryafforestation if any
c The status of clear felling
d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far
11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information
12 Status of construction
a Date of commencementb Date of completion (actual andor
planned)
13 Reasons for the delay if the projectis yet to start
14 Date of site visit
a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any
b Date of site visit for this monitoringreport
15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards
authorities)
Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)
Nil
NA
NA
NA
NA
NA
Completed
22-02-200721-02-2010 (Planned)23-10-2011 ( COD)
NA
18112014 amp 19112014
PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore
Page 3 of 19
PRESENT STATUS
Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under
Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967
Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978
EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated
28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007
The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project
Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI
Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under
Page 4 of 19
Panoramic view of the KTPS Stage V amp VI
Page 5 of 19
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
SCCL Fuel Analysis Details
The coal requirement for the project is 395 MTPA based on GCV 3700 KcalKg Daily coal
requirement is 12023 Tonnes The coal will be sourced from SCCL Telangana State
The Indigenous coal (40 MTPA as per MoU) will be obtained from Ms SCCL a
Government of Telangana under taking An MOU has been signed with Ms SCCL for supply
of 40 MTPA coal and will be transported by rail to the proposed power station
The quality parameters of SCCL Indigenous coal are tabulated in below
Table Analysis of SCCL Coal
Item Indigenous G13
Grade Coal
Indigenous G11
Grade Coal Average grade of Coal
Fixed Carbon 25 30 27
Ash 40 36 38
Volatile matter 30 25 27
Total Moisture 12 10 11
Sulphur lt05 lt062 lt062
HGI 50 50 50
GCV (HHV) KcalKg 3400 4000 3700
The quality of coal offered by SCCL is similar to the quality of coal originally proposed from
Suliary Belwar Coal block
Table Stack and Emission Details
Details Units SCCL Coal
Plant Heat rate KcalKWH 2317
GCV Kcalkg 3700
Fuel consumption
TPH 501
TPD 12023
TPA 395
Flow rate Nm3s 847
Ash Content 38
Sulfur Content 062
PM Emissions gs 423
SO2 Emissions gs 1726
NOx Emissions gs 430
Ash TPD 4560
Fly ash TPD 3648
Bottom ash TPD 912
Note 1) The EIA report prepared based on 100 Indigenous coal (ie Suliary Belwar Coal Block)
2) Calculations based on Indigenous (SCCL) coal of GCV gt3700 Kcalkg
Model Inputs and Results
Based on MoU with SCCL coal the Inputs used to run the model are stack details emission
details and a twenty-four Hours mean meteorological data The stack amp emission details are
shown in the below
Stack and Emission Details
Details Units Proposed Plant
Plant Capacity MW 800
Boiler Capacity TPH 2600
Type of Fuel - Coal
Height of the Stack M 275
Internal Dia of Stack M 7
Temperature of Flue Gas degC 125
Ambient Temperature (mean) degC 318
Velocity of Flue Gas ms 22
Flow Nm3s 847
Fuel Consumption TPH 501
Ash Content (in coal used) 38
Sulfur Content 062
PM Emissions gs 423
SO2 Emissions gs 1726
NOX Emissions gs 430
24 Hour Mean Meteorological Data for Post Monsoon Season
Hr Speed
(ms)
Wind Direction
(Degrees)
Temperature Cloud Cover Relative Humidity
Celsius (OKTAS) ()
1 166 225 201 4 65
2 156 225 198 4 67
3 142 225 192 4 74
4 125 225 184 3 76
5 105 225 178 4 76
6 096 225 186 3 78
7 082 225 208 3 74
8 081 45 222 2 72
9 106 90 244 2 70
10 152 45 264 2 68
11 229 45 284 1 65
12 295 45 291 1 62
13 335 45 302 1 60
14 382 45 314 1 60
15 441 45 312 2 59
16 424 45 304 3 59
17 427 45 291 3 59
18 401 45 272 3 61
19 242 360 254 3 61
20 168 45 232 5 60
21 135 90 217 5 61
22 128 90 21 5 61
23 141 45 21 4 62
24 146 225 20 4 63
Post Project Scenario-Units microgm3
Particulars Particulate Matter
(PM10)
Sulfur Dioxide
(SO2)
Oxides of Nitrogen
(NOX)
Baseline Scenario (Max) 972 414 468
Predicted GLC (Max) 066 240 84
Overall Scenario
(Worst Case)
979 654 552
NAAQ Standards lsquorsquo 100 80 80
Source lsquorsquo MoEF Notification New Delhi 16th November 2009 Schedule VII
The Predicted maximum Ground level concentration of 24 Hour average PM10 SO2 and NOX
concentrations considering 24 hour mean meteorological data of study season are superimposed on the
maximum baseline concentrations obtained during the study period to estimate the post project
scenario which would prevail at the post operational phase The overall post project scenario is shown
in above Table
The isopleths of the predicted concentrations of the monitored pollutants are presented in Figures (A)
(B) (C)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Predicted 24-Hourly Average GLCs of PM (microgm3)
Figure (A)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Figure (B) Predicted 24-Hourly Average GLCs of SO2 (microgm3)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)
3mCr~GOVERNMENT OF INDIA
q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE
CHANGERegional Office (South Eastern Zone)
1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034
TeINo044-2822 2325 E-mail roefcccgmaiIcom
ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003
FNoEP121511AP 1~2JDate 28112014
Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding
Ref (1)(2)(3)(4)
Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014
Madam
In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action
Encls As above
Copy to
1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003
2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO
I ~rtQ~o u (Dr MT Karuppiah)Scientist - C
(Dr MT Karup lah)Scientist - C
GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change
(Regional Office Southern Eastern Zone)Chennai -600 034
MONITORING REPORTPART I
DATA SHEET
FNoEP121511AP
1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify
Thermal
2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)
No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad
3 Clearance leUer(s)OM No anddated
4 Locations
a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N
80deg4134 E
5 Address of correspondence
a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha
Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin
6 Salient features
a of the project Covered in EIAIEMP
Page 1of 19
b of the environmental managementplans
7 Break up of the project area
a Submergence area (forest amp nonshyforests)
bOthers
8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans
a SCSTAdivasisbOthers
9 Financial Details
a Project cost as originally plannedand subsequent revised estimatesand the years of price reference
b Allocations made for environmentalmanagement plans with item wiseand year wise breakup
c Benefit cost ratiointernal rate ofreturn and the years of assessment
d Whether (c) includes the cost ofenvironmental management asshown in (b) above
e Total expenditure on the Project so
Submitted to MoEF during projectappraisal
Nil
8970 Ha (including common areas ofStage-V)
NANA
1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)
1 Green belt Development Rs100 Cr2 Pollution monitoring
instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system
for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection
storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)
Rs 247096 Crores (As per project
Page 2 of 19
far
f Actual expenditure incurred on theenvironmental management plansso far
10 Forest land requirement
a The status of approval for adiversion of forest land for nonshyforestry use
b The status of compensatoryafforestation if any
c The status of clear felling
d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far
11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information
12 Status of construction
a Date of commencementb Date of completion (actual andor
planned)
13 Reasons for the delay if the projectis yet to start
14 Date of site visit
a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any
b Date of site visit for this monitoringreport
15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards
authorities)
Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)
Nil
NA
NA
NA
NA
NA
Completed
22-02-200721-02-2010 (Planned)23-10-2011 ( COD)
NA
18112014 amp 19112014
PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore
Page 3 of 19
PRESENT STATUS
Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under
Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967
Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978
EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated
28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007
The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project
Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI
Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under
Page 4 of 19
Panoramic view of the KTPS Stage V amp VI
Page 5 of 19
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
Model Inputs and Results
Based on MoU with SCCL coal the Inputs used to run the model are stack details emission
details and a twenty-four Hours mean meteorological data The stack amp emission details are
shown in the below
Stack and Emission Details
Details Units Proposed Plant
Plant Capacity MW 800
Boiler Capacity TPH 2600
Type of Fuel - Coal
Height of the Stack M 275
Internal Dia of Stack M 7
Temperature of Flue Gas degC 125
Ambient Temperature (mean) degC 318
Velocity of Flue Gas ms 22
Flow Nm3s 847
Fuel Consumption TPH 501
Ash Content (in coal used) 38
Sulfur Content 062
PM Emissions gs 423
SO2 Emissions gs 1726
NOX Emissions gs 430
24 Hour Mean Meteorological Data for Post Monsoon Season
Hr Speed
(ms)
Wind Direction
(Degrees)
Temperature Cloud Cover Relative Humidity
Celsius (OKTAS) ()
1 166 225 201 4 65
2 156 225 198 4 67
3 142 225 192 4 74
4 125 225 184 3 76
5 105 225 178 4 76
6 096 225 186 3 78
7 082 225 208 3 74
8 081 45 222 2 72
9 106 90 244 2 70
10 152 45 264 2 68
11 229 45 284 1 65
12 295 45 291 1 62
13 335 45 302 1 60
14 382 45 314 1 60
15 441 45 312 2 59
16 424 45 304 3 59
17 427 45 291 3 59
18 401 45 272 3 61
19 242 360 254 3 61
20 168 45 232 5 60
21 135 90 217 5 61
22 128 90 21 5 61
23 141 45 21 4 62
24 146 225 20 4 63
Post Project Scenario-Units microgm3
Particulars Particulate Matter
(PM10)
Sulfur Dioxide
(SO2)
Oxides of Nitrogen
(NOX)
Baseline Scenario (Max) 972 414 468
Predicted GLC (Max) 066 240 84
Overall Scenario
(Worst Case)
979 654 552
NAAQ Standards lsquorsquo 100 80 80
Source lsquorsquo MoEF Notification New Delhi 16th November 2009 Schedule VII
The Predicted maximum Ground level concentration of 24 Hour average PM10 SO2 and NOX
concentrations considering 24 hour mean meteorological data of study season are superimposed on the
maximum baseline concentrations obtained during the study period to estimate the post project
scenario which would prevail at the post operational phase The overall post project scenario is shown
in above Table
The isopleths of the predicted concentrations of the monitored pollutants are presented in Figures (A)
(B) (C)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Predicted 24-Hourly Average GLCs of PM (microgm3)
Figure (A)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Figure (B) Predicted 24-Hourly Average GLCs of SO2 (microgm3)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)
3mCr~GOVERNMENT OF INDIA
q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE
CHANGERegional Office (South Eastern Zone)
1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034
TeINo044-2822 2325 E-mail roefcccgmaiIcom
ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003
FNoEP121511AP 1~2JDate 28112014
Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding
Ref (1)(2)(3)(4)
Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014
Madam
In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action
Encls As above
Copy to
1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003
2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO
I ~rtQ~o u (Dr MT Karuppiah)Scientist - C
(Dr MT Karup lah)Scientist - C
GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change
(Regional Office Southern Eastern Zone)Chennai -600 034
MONITORING REPORTPART I
DATA SHEET
FNoEP121511AP
1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify
Thermal
2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)
No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad
3 Clearance leUer(s)OM No anddated
4 Locations
a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N
80deg4134 E
5 Address of correspondence
a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha
Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin
6 Salient features
a of the project Covered in EIAIEMP
Page 1of 19
b of the environmental managementplans
7 Break up of the project area
a Submergence area (forest amp nonshyforests)
bOthers
8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans
a SCSTAdivasisbOthers
9 Financial Details
a Project cost as originally plannedand subsequent revised estimatesand the years of price reference
b Allocations made for environmentalmanagement plans with item wiseand year wise breakup
c Benefit cost ratiointernal rate ofreturn and the years of assessment
d Whether (c) includes the cost ofenvironmental management asshown in (b) above
e Total expenditure on the Project so
Submitted to MoEF during projectappraisal
Nil
8970 Ha (including common areas ofStage-V)
NANA
1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)
1 Green belt Development Rs100 Cr2 Pollution monitoring
instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system
for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection
storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)
Rs 247096 Crores (As per project
Page 2 of 19
far
f Actual expenditure incurred on theenvironmental management plansso far
10 Forest land requirement
a The status of approval for adiversion of forest land for nonshyforestry use
b The status of compensatoryafforestation if any
c The status of clear felling
d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far
11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information
12 Status of construction
a Date of commencementb Date of completion (actual andor
planned)
13 Reasons for the delay if the projectis yet to start
14 Date of site visit
a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any
b Date of site visit for this monitoringreport
15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards
authorities)
Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)
Nil
NA
NA
NA
NA
NA
Completed
22-02-200721-02-2010 (Planned)23-10-2011 ( COD)
NA
18112014 amp 19112014
PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore
Page 3 of 19
PRESENT STATUS
Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under
Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967
Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978
EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated
28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007
The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project
Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI
Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under
Page 4 of 19
Panoramic view of the KTPS Stage V amp VI
Page 5 of 19
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
Post Project Scenario-Units microgm3
Particulars Particulate Matter
(PM10)
Sulfur Dioxide
(SO2)
Oxides of Nitrogen
(NOX)
Baseline Scenario (Max) 972 414 468
Predicted GLC (Max) 066 240 84
Overall Scenario
(Worst Case)
979 654 552
NAAQ Standards lsquorsquo 100 80 80
Source lsquorsquo MoEF Notification New Delhi 16th November 2009 Schedule VII
The Predicted maximum Ground level concentration of 24 Hour average PM10 SO2 and NOX
concentrations considering 24 hour mean meteorological data of study season are superimposed on the
maximum baseline concentrations obtained during the study period to estimate the post project
scenario which would prevail at the post operational phase The overall post project scenario is shown
in above Table
The isopleths of the predicted concentrations of the monitored pollutants are presented in Figures (A)
(B) (C)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Predicted 24-Hourly Average GLCs of PM (microgm3)
Figure (A)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Figure (B) Predicted 24-Hourly Average GLCs of SO2 (microgm3)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)
3mCr~GOVERNMENT OF INDIA
q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE
CHANGERegional Office (South Eastern Zone)
1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034
TeINo044-2822 2325 E-mail roefcccgmaiIcom
ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003
FNoEP121511AP 1~2JDate 28112014
Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding
Ref (1)(2)(3)(4)
Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014
Madam
In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action
Encls As above
Copy to
1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003
2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO
I ~rtQ~o u (Dr MT Karuppiah)Scientist - C
(Dr MT Karup lah)Scientist - C
GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change
(Regional Office Southern Eastern Zone)Chennai -600 034
MONITORING REPORTPART I
DATA SHEET
FNoEP121511AP
1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify
Thermal
2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)
No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad
3 Clearance leUer(s)OM No anddated
4 Locations
a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N
80deg4134 E
5 Address of correspondence
a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha
Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin
6 Salient features
a of the project Covered in EIAIEMP
Page 1of 19
b of the environmental managementplans
7 Break up of the project area
a Submergence area (forest amp nonshyforests)
bOthers
8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans
a SCSTAdivasisbOthers
9 Financial Details
a Project cost as originally plannedand subsequent revised estimatesand the years of price reference
b Allocations made for environmentalmanagement plans with item wiseand year wise breakup
c Benefit cost ratiointernal rate ofreturn and the years of assessment
d Whether (c) includes the cost ofenvironmental management asshown in (b) above
e Total expenditure on the Project so
Submitted to MoEF during projectappraisal
Nil
8970 Ha (including common areas ofStage-V)
NANA
1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)
1 Green belt Development Rs100 Cr2 Pollution monitoring
instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system
for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection
storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)
Rs 247096 Crores (As per project
Page 2 of 19
far
f Actual expenditure incurred on theenvironmental management plansso far
10 Forest land requirement
a The status of approval for adiversion of forest land for nonshyforestry use
b The status of compensatoryafforestation if any
c The status of clear felling
d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far
11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information
12 Status of construction
a Date of commencementb Date of completion (actual andor
planned)
13 Reasons for the delay if the projectis yet to start
14 Date of site visit
a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any
b Date of site visit for this monitoringreport
15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards
authorities)
Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)
Nil
NA
NA
NA
NA
NA
Completed
22-02-200721-02-2010 (Planned)23-10-2011 ( COD)
NA
18112014 amp 19112014
PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore
Page 3 of 19
PRESENT STATUS
Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under
Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967
Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978
EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated
28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007
The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project
Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI
Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under
Page 4 of 19
Panoramic view of the KTPS Stage V amp VI
Page 5 of 19
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Predicted 24-Hourly Average GLCs of PM (microgm3)
Figure (A)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Figure (B) Predicted 24-Hourly Average GLCs of SO2 (microgm3)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)
3mCr~GOVERNMENT OF INDIA
q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE
CHANGERegional Office (South Eastern Zone)
1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034
TeINo044-2822 2325 E-mail roefcccgmaiIcom
ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003
FNoEP121511AP 1~2JDate 28112014
Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding
Ref (1)(2)(3)(4)
Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014
Madam
In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action
Encls As above
Copy to
1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003
2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO
I ~rtQ~o u (Dr MT Karuppiah)Scientist - C
(Dr MT Karup lah)Scientist - C
GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change
(Regional Office Southern Eastern Zone)Chennai -600 034
MONITORING REPORTPART I
DATA SHEET
FNoEP121511AP
1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify
Thermal
2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)
No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad
3 Clearance leUer(s)OM No anddated
4 Locations
a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N
80deg4134 E
5 Address of correspondence
a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha
Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin
6 Salient features
a of the project Covered in EIAIEMP
Page 1of 19
b of the environmental managementplans
7 Break up of the project area
a Submergence area (forest amp nonshyforests)
bOthers
8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans
a SCSTAdivasisbOthers
9 Financial Details
a Project cost as originally plannedand subsequent revised estimatesand the years of price reference
b Allocations made for environmentalmanagement plans with item wiseand year wise breakup
c Benefit cost ratiointernal rate ofreturn and the years of assessment
d Whether (c) includes the cost ofenvironmental management asshown in (b) above
e Total expenditure on the Project so
Submitted to MoEF during projectappraisal
Nil
8970 Ha (including common areas ofStage-V)
NANA
1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)
1 Green belt Development Rs100 Cr2 Pollution monitoring
instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system
for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection
storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)
Rs 247096 Crores (As per project
Page 2 of 19
far
f Actual expenditure incurred on theenvironmental management plansso far
10 Forest land requirement
a The status of approval for adiversion of forest land for nonshyforestry use
b The status of compensatoryafforestation if any
c The status of clear felling
d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far
11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information
12 Status of construction
a Date of commencementb Date of completion (actual andor
planned)
13 Reasons for the delay if the projectis yet to start
14 Date of site visit
a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any
b Date of site visit for this monitoringreport
15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards
authorities)
Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)
Nil
NA
NA
NA
NA
NA
Completed
22-02-200721-02-2010 (Planned)23-10-2011 ( COD)
NA
18112014 amp 19112014
PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore
Page 3 of 19
PRESENT STATUS
Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under
Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967
Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978
EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated
28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007
The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project
Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI
Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under
Page 4 of 19
Panoramic view of the KTPS Stage V amp VI
Page 5 of 19
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Figure (B) Predicted 24-Hourly Average GLCs of SO2 (microgm3)
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)
3mCr~GOVERNMENT OF INDIA
q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE
CHANGERegional Office (South Eastern Zone)
1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034
TeINo044-2822 2325 E-mail roefcccgmaiIcom
ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003
FNoEP121511AP 1~2JDate 28112014
Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding
Ref (1)(2)(3)(4)
Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014
Madam
In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action
Encls As above
Copy to
1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003
2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO
I ~rtQ~o u (Dr MT Karuppiah)Scientist - C
(Dr MT Karup lah)Scientist - C
GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change
(Regional Office Southern Eastern Zone)Chennai -600 034
MONITORING REPORTPART I
DATA SHEET
FNoEP121511AP
1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify
Thermal
2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)
No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad
3 Clearance leUer(s)OM No anddated
4 Locations
a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N
80deg4134 E
5 Address of correspondence
a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha
Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin
6 Salient features
a of the project Covered in EIAIEMP
Page 1of 19
b of the environmental managementplans
7 Break up of the project area
a Submergence area (forest amp nonshyforests)
bOthers
8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans
a SCSTAdivasisbOthers
9 Financial Details
a Project cost as originally plannedand subsequent revised estimatesand the years of price reference
b Allocations made for environmentalmanagement plans with item wiseand year wise breakup
c Benefit cost ratiointernal rate ofreturn and the years of assessment
d Whether (c) includes the cost ofenvironmental management asshown in (b) above
e Total expenditure on the Project so
Submitted to MoEF during projectappraisal
Nil
8970 Ha (including common areas ofStage-V)
NANA
1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)
1 Green belt Development Rs100 Cr2 Pollution monitoring
instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system
for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection
storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)
Rs 247096 Crores (As per project
Page 2 of 19
far
f Actual expenditure incurred on theenvironmental management plansso far
10 Forest land requirement
a The status of approval for adiversion of forest land for nonshyforestry use
b The status of compensatoryafforestation if any
c The status of clear felling
d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far
11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information
12 Status of construction
a Date of commencementb Date of completion (actual andor
planned)
13 Reasons for the delay if the projectis yet to start
14 Date of site visit
a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any
b Date of site visit for this monitoringreport
15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards
authorities)
Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)
Nil
NA
NA
NA
NA
NA
Completed
22-02-200721-02-2010 (Planned)23-10-2011 ( COD)
NA
18112014 amp 19112014
PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore
Page 3 of 19
PRESENT STATUS
Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under
Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967
Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978
EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated
28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007
The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project
Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI
Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under
Page 4 of 19
Panoramic view of the KTPS Stage V amp VI
Page 5 of 19
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)
at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana
Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)
3mCr~GOVERNMENT OF INDIA
q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE
CHANGERegional Office (South Eastern Zone)
1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034
TeINo044-2822 2325 E-mail roefcccgmaiIcom
ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003
FNoEP121511AP 1~2JDate 28112014
Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding
Ref (1)(2)(3)(4)
Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014
Madam
In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action
Encls As above
Copy to
1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003
2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO
I ~rtQ~o u (Dr MT Karuppiah)Scientist - C
(Dr MT Karup lah)Scientist - C
GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change
(Regional Office Southern Eastern Zone)Chennai -600 034
MONITORING REPORTPART I
DATA SHEET
FNoEP121511AP
1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify
Thermal
2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)
No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad
3 Clearance leUer(s)OM No anddated
4 Locations
a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N
80deg4134 E
5 Address of correspondence
a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha
Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin
6 Salient features
a of the project Covered in EIAIEMP
Page 1of 19
b of the environmental managementplans
7 Break up of the project area
a Submergence area (forest amp nonshyforests)
bOthers
8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans
a SCSTAdivasisbOthers
9 Financial Details
a Project cost as originally plannedand subsequent revised estimatesand the years of price reference
b Allocations made for environmentalmanagement plans with item wiseand year wise breakup
c Benefit cost ratiointernal rate ofreturn and the years of assessment
d Whether (c) includes the cost ofenvironmental management asshown in (b) above
e Total expenditure on the Project so
Submitted to MoEF during projectappraisal
Nil
8970 Ha (including common areas ofStage-V)
NANA
1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)
1 Green belt Development Rs100 Cr2 Pollution monitoring
instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system
for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection
storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)
Rs 247096 Crores (As per project
Page 2 of 19
far
f Actual expenditure incurred on theenvironmental management plansso far
10 Forest land requirement
a The status of approval for adiversion of forest land for nonshyforestry use
b The status of compensatoryafforestation if any
c The status of clear felling
d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far
11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information
12 Status of construction
a Date of commencementb Date of completion (actual andor
planned)
13 Reasons for the delay if the projectis yet to start
14 Date of site visit
a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any
b Date of site visit for this monitoringreport
15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards
authorities)
Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)
Nil
NA
NA
NA
NA
NA
Completed
22-02-200721-02-2010 (Planned)23-10-2011 ( COD)
NA
18112014 amp 19112014
PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore
Page 3 of 19
PRESENT STATUS
Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under
Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967
Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978
EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated
28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007
The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project
Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI
Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under
Page 4 of 19
Panoramic view of the KTPS Stage V amp VI
Page 5 of 19
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
3mCr~GOVERNMENT OF INDIA
q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE
CHANGERegional Office (South Eastern Zone)
1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034
TeINo044-2822 2325 E-mail roefcccgmaiIcom
ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003
FNoEP121511AP 1~2JDate 28112014
Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding
Ref (1)(2)(3)(4)
Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014
Madam
In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action
Encls As above
Copy to
1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003
2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO
I ~rtQ~o u (Dr MT Karuppiah)Scientist - C
(Dr MT Karup lah)Scientist - C
GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change
(Regional Office Southern Eastern Zone)Chennai -600 034
MONITORING REPORTPART I
DATA SHEET
FNoEP121511AP
1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify
Thermal
2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)
No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad
3 Clearance leUer(s)OM No anddated
4 Locations
a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N
80deg4134 E
5 Address of correspondence
a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha
Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin
6 Salient features
a of the project Covered in EIAIEMP
Page 1of 19
b of the environmental managementplans
7 Break up of the project area
a Submergence area (forest amp nonshyforests)
bOthers
8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans
a SCSTAdivasisbOthers
9 Financial Details
a Project cost as originally plannedand subsequent revised estimatesand the years of price reference
b Allocations made for environmentalmanagement plans with item wiseand year wise breakup
c Benefit cost ratiointernal rate ofreturn and the years of assessment
d Whether (c) includes the cost ofenvironmental management asshown in (b) above
e Total expenditure on the Project so
Submitted to MoEF during projectappraisal
Nil
8970 Ha (including common areas ofStage-V)
NANA
1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)
1 Green belt Development Rs100 Cr2 Pollution monitoring
instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system
for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection
storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)
Rs 247096 Crores (As per project
Page 2 of 19
far
f Actual expenditure incurred on theenvironmental management plansso far
10 Forest land requirement
a The status of approval for adiversion of forest land for nonshyforestry use
b The status of compensatoryafforestation if any
c The status of clear felling
d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far
11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information
12 Status of construction
a Date of commencementb Date of completion (actual andor
planned)
13 Reasons for the delay if the projectis yet to start
14 Date of site visit
a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any
b Date of site visit for this monitoringreport
15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards
authorities)
Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)
Nil
NA
NA
NA
NA
NA
Completed
22-02-200721-02-2010 (Planned)23-10-2011 ( COD)
NA
18112014 amp 19112014
PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore
Page 3 of 19
PRESENT STATUS
Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under
Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967
Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978
EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated
28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007
The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project
Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI
Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under
Page 4 of 19
Panoramic view of the KTPS Stage V amp VI
Page 5 of 19
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change
(Regional Office Southern Eastern Zone)Chennai -600 034
MONITORING REPORTPART I
DATA SHEET
FNoEP121511AP
1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify
Thermal
2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)
No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad
3 Clearance leUer(s)OM No anddated
4 Locations
a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N
80deg4134 E
5 Address of correspondence
a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha
Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin
6 Salient features
a of the project Covered in EIAIEMP
Page 1of 19
b of the environmental managementplans
7 Break up of the project area
a Submergence area (forest amp nonshyforests)
bOthers
8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans
a SCSTAdivasisbOthers
9 Financial Details
a Project cost as originally plannedand subsequent revised estimatesand the years of price reference
b Allocations made for environmentalmanagement plans with item wiseand year wise breakup
c Benefit cost ratiointernal rate ofreturn and the years of assessment
d Whether (c) includes the cost ofenvironmental management asshown in (b) above
e Total expenditure on the Project so
Submitted to MoEF during projectappraisal
Nil
8970 Ha (including common areas ofStage-V)
NANA
1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)
1 Green belt Development Rs100 Cr2 Pollution monitoring
instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system
for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection
storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)
Rs 247096 Crores (As per project
Page 2 of 19
far
f Actual expenditure incurred on theenvironmental management plansso far
10 Forest land requirement
a The status of approval for adiversion of forest land for nonshyforestry use
b The status of compensatoryafforestation if any
c The status of clear felling
d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far
11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information
12 Status of construction
a Date of commencementb Date of completion (actual andor
planned)
13 Reasons for the delay if the projectis yet to start
14 Date of site visit
a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any
b Date of site visit for this monitoringreport
15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards
authorities)
Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)
Nil
NA
NA
NA
NA
NA
Completed
22-02-200721-02-2010 (Planned)23-10-2011 ( COD)
NA
18112014 amp 19112014
PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore
Page 3 of 19
PRESENT STATUS
Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under
Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967
Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978
EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated
28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007
The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project
Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI
Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under
Page 4 of 19
Panoramic view of the KTPS Stage V amp VI
Page 5 of 19
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
b of the environmental managementplans
7 Break up of the project area
a Submergence area (forest amp nonshyforests)
bOthers
8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans
a SCSTAdivasisbOthers
9 Financial Details
a Project cost as originally plannedand subsequent revised estimatesand the years of price reference
b Allocations made for environmentalmanagement plans with item wiseand year wise breakup
c Benefit cost ratiointernal rate ofreturn and the years of assessment
d Whether (c) includes the cost ofenvironmental management asshown in (b) above
e Total expenditure on the Project so
Submitted to MoEF during projectappraisal
Nil
8970 Ha (including common areas ofStage-V)
NANA
1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)
1 Green belt Development Rs100 Cr2 Pollution monitoring
instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system
for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection
storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)
Rs 247096 Crores (As per project
Page 2 of 19
far
f Actual expenditure incurred on theenvironmental management plansso far
10 Forest land requirement
a The status of approval for adiversion of forest land for nonshyforestry use
b The status of compensatoryafforestation if any
c The status of clear felling
d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far
11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information
12 Status of construction
a Date of commencementb Date of completion (actual andor
planned)
13 Reasons for the delay if the projectis yet to start
14 Date of site visit
a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any
b Date of site visit for this monitoringreport
15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards
authorities)
Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)
Nil
NA
NA
NA
NA
NA
Completed
22-02-200721-02-2010 (Planned)23-10-2011 ( COD)
NA
18112014 amp 19112014
PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore
Page 3 of 19
PRESENT STATUS
Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under
Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967
Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978
EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated
28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007
The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project
Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI
Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under
Page 4 of 19
Panoramic view of the KTPS Stage V amp VI
Page 5 of 19
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
far
f Actual expenditure incurred on theenvironmental management plansso far
10 Forest land requirement
a The status of approval for adiversion of forest land for nonshyforestry use
b The status of compensatoryafforestation if any
c The status of clear felling
d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far
11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information
12 Status of construction
a Date of commencementb Date of completion (actual andor
planned)
13 Reasons for the delay if the projectis yet to start
14 Date of site visit
a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any
b Date of site visit for this monitoringreport
15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards
authorities)
Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)
Nil
NA
NA
NA
NA
NA
Completed
22-02-200721-02-2010 (Planned)23-10-2011 ( COD)
NA
18112014 amp 19112014
PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore
Page 3 of 19
PRESENT STATUS
Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under
Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967
Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978
EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated
28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007
The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project
Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI
Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under
Page 4 of 19
Panoramic view of the KTPS Stage V amp VI
Page 5 of 19
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
PRESENT STATUS
Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under
Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967
Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978
EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated
28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007
The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project
Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI
Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under
Page 4 of 19
Panoramic view of the KTPS Stage V amp VI
Page 5 of 19
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
Panoramic view of the KTPS Stage V amp VI
Page 5 of 19
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
Reference
PART-II
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I
Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)
(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions
(i) Implementation of the conditions stipulated by the APPCB Refer Part III
(ii) No additional land for any facilitiesl activities shall be acquired Complied
(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III
(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec
(v) Installation of High efficiency ESPs Complied
(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area
(vii) Fly ash utilization and disposal Refer part III
(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures
(ix) Discharge of effluents Refer part III
(x) Rainwater harvesting measures Refer part III
(xi) Greenbelt Development Complied
(xii) First aid and sanitation arrangements during construction phase Refer part III
(xiii) Noise level monitoring and provision for personal protection devices Complied
(xiv) AAQ MonitoringPartly Complied
(xv) Paper Advertisement shall be given about the EC Complied
(xvi) Setting up of separate environment monitoring cell
(xvii) Submission of six monthly compliance report
Complied
Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied
(xix) Separate fund allocation for implementation of environmentalprotection measures Complied
Page 6 of 19
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
---- __ -- _
(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon
(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations
(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC
(7) Compliance with various statutory requirements Partly Complied
Page 7 of 19
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
PART-III
1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)
1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated
04102006
Subject
Reference
No EC Conditions
All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented
3 (i)
(ii) No additional land for any facilitieslactivities shall be acquired for the project
(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively
Status of Compliance
Partly Complied with
As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V
Complied withThe project is constructed in the existing landwithout acquiring additional land
Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail
PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received
As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under
Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803
Page 8 of 19
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
(iv)
Coal Storage Yard
A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained
(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3
(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry
(vii)
Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation
Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant
Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished
StockQuantity Quantity avaiiable(MT)
Year produced transported Disposed to(MT) (MT) ash pond
2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215
Page 9 of 19
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V
PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill
PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond
View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI
Page 10 of 19
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
View of Ash pond water
(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting
Stage Avg Waterrequirement(M3) day
STAGE I TO IV 68400STAGE V 50250STAGE VI 33400
The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the
Page 11of 19
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
PA
Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP
Typical view of Rainwater harvesting Structure
Page 12 of 19
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with
nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into
Page 13of 19
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
(xi)
MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity
open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided
(x)
Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under
Area No of SurvivalYear Covered plants rate
(ha) planted
3466Lakhs
2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082
ExpenditureincurredRs616 Lakh
502 Lakh
998 Lakh
1350 Lakh
View of greenbelt development within the plant Premises
Page 14 of 19
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
(xiii)
(xiv)
(xii)View of greenbelt development within the Residential Colony
First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided
Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry
Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea
Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines
One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards
Page 15of 19
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
(xv)
(xvi)
Online AAQMonitoring Station located within the old residential colony
The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln
A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards
Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007
Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities
The following executives are working under thesupervision of Superintend Engineer
1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist
EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up
Page 16 of 19
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB
(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry
(xix)
(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant
4
5
6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any
Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated
Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007
Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)
Complied withPA extended full cooperation during the duringplant visit
Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition
Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011
Agreed to comply
Page 17 of 19
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
7b f d Partly Complied with
The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under
Remarks amp recommendation for corrective action
PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following
1 STP has not been installed - Condition No i
2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)
3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv
4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii
5 Public Liability Insurance has not been obtained - Condition No7
Other observations
1 Court cases PA has submitted that no court case filed under progress for the pastthree years
2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears
3 House keeping It was found satisfactory
4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~
(Dr MT Karuppiah)Scientist - C
Page 18 of 19
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
MEMORANDUM OF UNDERSTANDING
BETWEEN
TSGENCOANlgtSCCL
FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
i
MEMORANDUM OF UNDERSTANDING i
~001 ~ie~d6~
U1iti- ~Jd62j2amp1S
~~~i_~~~~~~K~
This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r
A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull
e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean
and include its sucqessors and permittedassignsJofthe FIRSTPARf _
-
BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered
Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -
~
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
-
(The Seller and the Purchaser are hereinafter collectively referred to as the
Parties)
Whereas the Seller is a Government Company engaged in mining and sale of coal
including coal exploration design construction project management
development operations and allied consultancy servic~s
Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed
800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull
Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to
meetthe generation r~uirementof this unit_
middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser
_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -
Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost
plusmi~esbull
NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants
he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull
10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of
coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of
-
India for such supplies as per lTCDP 2007andcostpluspolicy guidelines
2008
20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC
GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would
eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for
2 ~
middotmiddotmiddotmiddotx I
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
- ------
supply of coal which shall include price and other details on mutually agreed
terms and conditions
30 SCCL shall open new cost plus mines for this power plant and the schedule of
opening of such mine shall link to the commissioning of TSGENCO power
plant which is expected to be commissioned by December-2017 The supply
of coal shall commence from October-2017 tentatively Upon delay in
commissioning of the cost plus mines due to force majeure reasons coal shall
be supplied from other sources on weighted average e-auction prices on best
effort basis
4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe
plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate
proposal for enteringintoFSA whicih shall indicate the modalities for supply
ofcoal ~-----shy
50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to
Seller (SCCL) sufficiently in advaIlceto supply coal
6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the
MQU between the parties shall be settled inaecQrdance with thefoHowing
guidelines
ARBITRATION In the event of any difference or dispute between the parties
th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be
settled through Arbitration in accordance with the provisions urthe Arbitration and
Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators
ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH
be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The
venue ofArbitration shall be decided mutually between the parties
3 1
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
70 Severability and Renegotiation In the event any part or provision of this Agreement
becomes for any reason unenforceable or is declared invalid by a Competent Court
of Law or Tribunal the rest of this agreement shall remain in full force and effect as if
the unenforceable or invalid portions had not been part of this agreement and in such
eventuality the parties agree to negotiate with a view to amend or modify this
agreement for achieving the original intent of the parties
80Termination of MOU The MOU shall stand terminated after payment of
consequential damages liable to SCCL or TSGENCO as the case may be
Such consequential damages shall be as per the decision of competent
authority of SCCL TSGENCO as the case may be
90 Eflective Date This MOU will be effective from the date of signing and can
beam~nded supplemented or replaced by another document signed by the
Parties
IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN
middotForalldonbebalfofmiddotSeller ltspdli)
K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot
WcVmiddot 1( fgtlttIIVlv4J
~~l4 (H~rv4lt~ 1 )
4
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
lmluea page http environmentclearanceni cinUserEDS _Replyaspx
13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change
Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1
My Account Mil Prt)posals Hf
Essential Details Sought of EOSSno IlOltlsal No Ham
uigtmlioll Reply
onReply Date
fdsSno Proposal No Essential Details
(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy
Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC
Sought
-
f 1 10132014411 PM
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
CC
monitori ng-ecnicin To saroj-mefnicin Me
rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM
Acknowledgement Slip for EC application
This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent
Following should be mentioned in further correspondence
1 Proposal No IATGTHE247902012
2 Category of the Proposal
Thermal Projects
3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)
4 Date of Receipt of Proposal
19 Sep 2014
5 Date of TOR Granted
26 Sep 2012
6 Date of 19092014submission for EC
6 Name of the Project proponent along with contact details
a) Name of the proponent AAJAY
b) State Telangana
c) District Khammam
d) Pincode 500082
-ampmIY Reply All or Forward I More
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12
Project Details1
i Proposal No IATGTHE247902012
ii MoEFCC File No IATGTHE247902012
iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)
iv Project Sector Thermal Projects
v CompanyProponent AAJAY
viDetails of State of the project
Details of State of the project
Sno State Name District Name Tehsil Name
1 Telangana Khammam Palwancha
viiDate of TOR Granted 26 Sep 2012
viiiTOR letter issued by Ministry Annexure-TOR letter
Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2
iEIAEMP Annexure-EIAEMP
iiRisk Assessment Annexure-Risk Assessment
iiiPublic Hearing Annexure-Public Hearing
iv Date of Public Hearing 25 Jul 2014
vCertified Monitoring report by RoMoEF Annexure-UploadFile
Accredited Consultant Details3
i Accreditation status Yes
EC Report
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
9192014 Report Part 1
httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22
ii Accreditation No NABETEIARA005rev01010
iii Name of Consultant Ramky Enviro Engineers Ltd
iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082
v Mobile No 9000604455
vi Landline No 04023305726
vii Email Id cecthermal2yahoocom
viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None
ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies
Undertaking4
The aforesaid application and documents furnished herewith are true to my knowledge
i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED
ii Designation CHIEF ENGINEERCIVILTHERMAL
iii Company AAJAY
iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER
GOVERNMENT OF TElANGANA ABSTRACT
I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued
IRRIGATION AND CAD (REFORMS) DEPARTMENT
G0MsNo47 Dated 24122014 READ the following
1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012
2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014
3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1
DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010
ORDER
Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O
2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)
Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)
TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc
IIFORWARDEDBY ORDERII
b~ SECTION OFFICER