Transcript
Page 1: Technical Report Electrical02252016

KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS

Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station

TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.

Date: 09.11.1436 (25.08.2015)____________________________________________________________________________

a. Electrical

Electrical Room with Panel Boards (18/02/2016)

Electrical Manhole 1 Cable Rack/ Support Not yet Installed

Page 2: Technical Report Electrical02252016

KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS

Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station

TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.

Date: 09.11.1436 (25.08.2015)____________________________________________________________________________

Electrical Manhole 2 , Cable Rack Support Not Installed

Main Cables going to Transformer , but Ductbank Not yet Finished