Table A ‐ BOQ
No. Description Unit Qty. Unit
Price
Total
Price
remark
1 Dual Fuel generator Phase 1
Design, manufacture, supply,
installation, integration
Comp. 1
1.1 Manufacture, transport to site, install,
connect BOP subsystems, controls and
auxiliaries, test and commission of a
complete dual fuel generator, 6‐7MW,
11kV, as per technical Annex A "The
Technical Specifications" and Section A
& C. without section C.11. "Upgrading
Existing Generators Synchronization
Routing" and without spare parts as per
A.25.2 "Warrantee period of the
engine‐generator". Major items, but
not limited to, the equipment and
works required to complete the Diesel
Generator #5 project:
One (1) dual fuel Gas Diesel Generator
power unit, complete with generator,
flywheel, coupling, gear box, base and
auxiliary equipment
Fuel system (Day light fuel tanks and
refueling system, concrete containment
pit, pipes, connections to the energy
center fuel system ,valves, counters and
other )
Natural gas fuel system
Air intake
2
No. Description Unit Qty. Unit
Price
Total
Price
remark
1.1 Exhaust system‐ (Remark : stack height will be
30m at least)
lube oil system
Air starting, compressed air system
Black start
Cooling systems
Keep warm system
Barring system
Protective device (over speed, Governor, shut‐
off valves etc.)
Connectivity with the main electrical system
Grounding
Local switchboards, Control, MCC
switchboards, PLC switchboards
Controls, synchronization, load sharing,
protection, systems
Working station (HMI screen)
Connectivity with the main SCADA system
(Not include HMI screens, that will be done by
others)
Connectivity with the environment monitoring
system
3
No. Description Unit Qty. Unit
Price
Total
Price
remark
1.1 HVAC works:
Complete air condition system for all Electrical
rooms
Fans schedules ‐ for smoke exhaust and
ventilation of main generator room
Fresh air handling units as per spec , the
drawings and schedules ‐ for ventilation ‐ inlet
including 30 % filters bank
Sheet metal air duct work as per spec. and the
drawings for all building levels
Insulation work for air ducts and piping as per
spec and drawings
Meters and gages as per spec , and the
drawings.
Foundations and mounting Supports as per spec
and the drawings.
Balancing and testing as per spec and drawings
Complete electrical plant installation for all
HVAC works including all switchboards, cabling,
control, control cable, fiber optic etc.
Connectivity with the main SCADA system (Not
include HMI screen, that will be done by others)
Communication system for phase one
Warranty period
Other
4
No. Description Unit Qty. Unit
Price
Total
Price
remark
1.2 Electrical system‐ phase 1
1.2.1 HV114, HV214
Manufacture, transport to site, install as an
expansion to existing MV switchboard,
interconnect of controls and auxiliaries, test and
commission of a complete Schneider Electric
MC‐SET cubicle 24kV, In=2000A Isc=25kA (3sec),
maximum operating voltage of 24kV, for feeder
connection cubicle as defined in the drawings
and the specifications including: 24kV 1250A
SF6 withdrawable circuit breaker, earthling
switch, current transformers, surge arrestors,
protection relays with fiber optic connections
converters, FO cabling, metering devices,
interlocks, control devices, accessories, labels.
Com
p.
2
1.2.2 HV601, HV602
Manufacture, transport to site, install,
interconnect of controls and auxiliaries, test and
commission of a complete 24kV In=1250A
Isc=25kA, Incomer connection cubicle as
defined in the drawings and the specifications
including 1250A SF6 or vacuum withdrawable
circuit breaker, earthling switch, current and
potential transformers, surge arrestors,
protection relays with fiber optic connections
converters with FO cabling, metering devices,
control devices, accessories, labels and
Open/close I/O modules.
Com
p.
2
1.2.3 HV601A
Ditto, but 24kV Isc=25kA, potential
transformers, cubicle.
Com
p.
1
5
No. Description Unit Qty. Unit
Price
Total
Price
remark
1.2.4 HV603
Ditto, but 24kV In=800A Isc=25kA, Step‐up
transformer connection cubicle as defined
in the drawings and the specifications
including 800A SF6 or vacuum withdrawable
circuit breaker, earthling switch, current and
potential transformers, surge arrestors,
protection relays with fiber optic
connections converters with FO cabling,
metering devices, control devices,
accessories, labels and Open/close I/O
modules.
Comp. 1
1.2.5 HV604, HV605, HV606
Ditto, but 24kV In=800A Isc=25kA, outgoing
connection cubicle as defined in the
drawings and the specifications including
800A SF6 or vacuum withdrawable circuit
breaker, earthling switch, current
transformer, surge arrestors, protection
relays with fiber optic connections
converters with FO cabling, metering
devices, control devices, accessories, labels
and Open/close I/O modules.
Comp. 3
1.2.6 HV701
Manufacture, transport to site, install,
interconnect of controls and auxiliaries, test
and commission of a complete 12kV
In=1250A Isc=20kA, Generator connection
cubicle as defined in the drawings and the
specifications including 1250A SF6 or
vacuum withdrawable circuit breaker,
earthling switch, current and potential
transformers, surge arrestors, protection
relays with fiber optic connections
converters with FO cabling, metering
devices, control devices, accessories, labels
and Open/close I/O modules.
Comp. 1
6
No. Description Unit Qty. Unit
Price
Total
Price
remark
1.2.7 HV702
Ditto, but a complete 12kV In=1250A
Isc=20kA, bus riser cubicle as defined in the
drawings and the specifications including
earthling switch, withdrawable potential
transformers, surge arrestors, accessories
and labels.
Comp. 1
1.2.7 HV702
Ditto, but a complete 12kV In=1250A
Isc=20kA, bus riser cubicle as defined in the
drawings and the specifications including
earthling switch, withdrawable potential
transformers, surge arrestors, accessories
and labels.
Comp. 1
1.2.8 TRF010
Manufacture, transport to site, install
connect and commission of a complete oil
immersed power Transformer 22/11kV up to
10MVA Ynd11, Uk=8%, NLTC 0, ±2.5%, ±5%,
±7.5% .
Comp.
1.2.9 TRF011
Manufacture, transport to site, install
connect and commission of a complete oil
immersed power Transformer 22/0.4kV
1600kVA Dyn11, Uk=6%, NLTC 0, ±2.5%,
±5%.
Comp. 1
1.2.10 TRF012
Manufacture, transport to site, install
connect and commission of a complete oil
immersed power Transformer 22/0.4kV
630kVA Dyn11, Uk=4.5%, NLTC 0, ±2.5%,
±5%.
Comp. 1
7
No. Description Unit Qty. Unit
Price
Total
Price
remark
1.2.11 NGR
Manufacture, transport to site, install
connect and commission of a neutral
grounding resistor 22kV 500A/15sec.
Comp. 1
1.2.12 Design, manufacture, transport to site,
install connect a 2500A 65kA Busbar duct
including all turns and supporting structures
for connecting between transformer TRF011
and the main circuit breaker of switchboard
MCC1000.
Comp. 1
1.2.13 Supply and Installation of power cabling,
cable terminations and wiring of all MV, LV,
control, communication, fiber optic and
instrumentation
Comp. 1
1.2.14 Supply and Installation of cable tray system
for (HV,MV, LV, Communication, FIRE alarm )
Comp. 1
1.2.13 Supply and Installation of power cabling,
cable terminations and wiring of all MV, LV,
control, communication, fiber optic and
instrumentation
Comp. 1
1.2.14 Supply and Installation of cable tray system
for (HV,MV, LV, Communication, FIRE alarm )
Comp. 1
1.2.15 Conectivity with the main SCADA system
(Not include HMI screen)
Comp. 1
1.2.16 Supply and install complete lightning system
as per Israeli standard SI 1173 part 1, and
relocation of existing lightning rod after
increasing stack's height
Comp. 1
8
No. Description Unit Qty. Unit
Price
Total
Price
remark
1.2.17 Complete BOP systems and building
accessories as described in the drawings
Comp. 1
Supply and Installation of complete lighting
and receptacles systems and outlets
according to drawings and specifications.
1.3 Design, procure, and install Increasing the
height of an existing stack to 24 meters high.
Comp. 4
1.4 Manufacture, transport to site, install inside
the generator hall, of an electrical operated
maintenance crane for handling the heaviest
electrical, mechanical part of the generator,
pumps and chiller auxiliaries and mechanical
parts as per manufacturer's standard up to 5
tons.
Comp. 1
1.5 Mandatory spare part ‐ list of all parts,
materials and costs for warrantee period
that are required for the operation of the
generator 4000H/Y‐8000H/Y. In order to
keep the guarantee availability as presented
in the contract
Comp. 1
Total for phase 1
9
No. Description Unit Qty. Unit
Price
Total
Price
remark
2 Optional (for phase 1)
2.1 Additional price for Upgrading Existing
Generators Synchronization Routing
according to Chapter C
(option for phase 1)
Comp. 1
2.2 Design and supply of additional day tank at
capacity of 10m3 that will be connected to
the existing LFO system and will be replace
the old daily tank that shall be remove from
the site by the contractor. According to
Chapter C (option for phase 1)
Comp. 1
Total for phase 1 ‐ optional
10
No. Description Unit Qty. Unit
Price
Total
Price
remark
3 NATURAL GAS SYSTEM‐(Phase 2‐ option)
Manufacture, transport to site, install and
connect all necessary components, controls
software programming, commission, testing
and all other. That are required for operating
the generator automatically on natural gas
Comp. 1
Total for phase 2
4 Co‐GENERATION‐ (Phase 3‐ option)
Design, manufacture, supply, installation,
integration
Comp. 1
Design, supply, install and commission
absorption chillers cooling tower and
auxiliary as per technical spec.
Major items, but not limited to, the
equipment and works required to complete
the Co ‐Generation project:
Assembled absorption chillers as per spec,
drawings and schedules.
Main centrifugal cold water pumps as per
spec , drawings and schedules.
Main centrifugal cooling water pumps as per
spec , drawings and schedules.
Main centrifugal heat recovery water pumps
as per spec , drawings and schedules.
Foundations and mounting Supports as per
spec and the drawings
11
No. Description Unit Qty. Unit
Price
Total
Price
remark
4 Supply and install all Pipework and fittings as
per spec and drawings, including ןinsulation,
penetrations, sleeves, sealing, all excavation,
filling and recover of road.
Assembled cooling tower cell as per specs,
drawings and schedules.
Complete electrical installation for
absorption chiller and cooling tower
including , cabling, control, etc.
MCC switchboard , drawings and schedules
Supply and Installation of power cabling,
cable terminations and wiring of all LV,
control, communication, fiber optic and
instrumentation
Supply and Installation of cable tray system
for (LV, Communication )
Connectivity with the main SCADA system
(Not include HMI screen)
Warranty period
Other
Total for phase 3
12
No. Description Unit Qty. Unit
Price
Total
Price
remark
Optional (for phase3)
price for install and commissioning
additional cooling tower cell as per specs
include all auxiliary, pipework, electrical and
control work that required to complete the
cooling tower
Total for phase 3
13
No. Description Unit Qty. Unit
Price
Total
Price
remark
6 Engine& Generator LTSA package (Services
during the Service and Maintenance Period
as per chapter A section A25)
6.1 Technical Support for the entire term of the
Contract ‐ annual payment for hotline support
as per chapter A section A25
year 10
6.2 Option : Remote Support year
6.3 Maintenance for phase 3 (Absorption Chiller) year 10
6.4 On‐site support
6.4.1 Technician Visit ‐ arrival of a senior technical
member from manufacturer's staff to
assist/carry out a repair work, at IAA's site as
defined in the Technical Specifications.
day In addition to the
payments for
technician's
working day that is
defined as 10
hours per day, the
IAA will pay for
economy class
flight costs
(against
presentation of
invoices) and daily
allowance of 200
euros per day.
During Warranty
Period the
Technician Visit
will be provided as
part of the
Warranty with no
cost to the IAA.
6.4.2 Hourly Fee for additional work hours beyond the 10 hours work day
hour
14
No. Description Unit Qty. Unit
Price
Total
Price
Remark
6.5 Spare Parts
6.5.1 All Spare Parts, Special Tools, Consumables
and costs of supervision by Contractor's
representative that are required, according to
Contractor's O&M Manual and in accordance
with prudent industry practices, for all
Preventative Maintenance of the Generator
up to and including full overhaul.
The contractor shall
attach a list of all
works, part’s and
costs required for
preventive
maintenance
including time
schedule until full
major overhaul,
including a
breakdown of all
parts that are
required for each
Preventative
Maintenance service
and whether such
service requires
supervision by the
Contractor.This shall
also be used for the
evaluation of the
proposals in the
table attached as
annex B to the Price
Proposal Form.
15
No. Description Unit Qty. Unit
Price
Total
Price
Remark
6.5.2 Mandatory spare part ‐ list of all parts,
materials and costs for warrantee period that
are required for the operation of the
generator 4000H/Y‐8000H/Y. In order to keep
the guarantee availability as presented in the
contract
Comp. 1 The contractor shall
attach a list of all
parts , materials and
costs and shall
specify within this
list the
recommended
Spare Parts, Special
Tools and
Consumables
required for
Unplanned
Maintenance” or
"Corrective
Maintenance"
7 Addition Training
7.1 Training at the manufacturer’s facilities as per
annex A section (per technic)
Comp. 1
7.2 Training at the owner's facilities‐ one week
training
week 1
Total for LTSA package