Issue Date
4 May 2010Version Number
Version 1.4
Networks
License Grant.Artefact Systems (Australia) Pty Ltd hereby grants Western Power a non-exclusive, non-transferable right to use one copy of this version of the Western Power Switchgear InstructionManual 1 Version 1.4 - Issue Date 4 May 2010. You may install one copy of the CD on one computer / workstation for which the CD was designed.The CD and documentation are protected by copyright law and remain the intellectual property of Artefact Systems (Australia) Pty Ltd.Artefact Systems (Australia) Pty Ltd. is not responsible for any damage to the user's computer system or data and in no event will Artefact Systems (Australia) Pty Ltd., its officers, directors, employees or agents be responsible to the user for any consequential, incidental, or indirect damages (including damages for loss of business profits, business interruption, loss of business information and the like) arising out of the use or inability to use the Artefact Systems (Australia) Pty Ltd. CD.
This Document Is Uncontrolled When Printed
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 4 May 2010Doc Ref: WPWorkProcedure1
NETWORK SWITCHGEAR INSTRUCTION MANUAL 1WORK PROCEDURE INSTRUCTIONS
NE
TW
OR
K S
WIT
CH
GE
AR
INS
TR
UC
TIO
N M
AN
UA
L 1
WO
RK
PR
OC
ED
UR
E IN
ST
RU
CT
ION
S
1 of 2
The following information is the 'Western Power Work Procedure Instructions' for the use of this Network Switchgear Instruction Manual 1
Please refer to the How To Use This Manual template for further details on how to use this Network Switchgear Instruction Manual 1
The responsibility for safe working with electrical switchgear rests with the employer, employees, and contractors required to operate the different types of switchgear that exists on the Western Power network.
The purpose of this manual is to provide a common set of operating instructions for electrical switchgear. The intent is to provide a consistent understanding of switchgear operating requirements and promote the safe and efficient operation of switchgear. This can reduce the likelihood of personal injury, equipment damage and loss of supply.
This manual is a physical operating guide only, and does not contain all of the technical details, system protection requirements, and operational checks that are required for safe operation of the network. This manual must be used in conjunction with the Western Power's Electrical Safety Code, Switching Operators Manuals, Network Operating Instructions, Field Instructions, the Job Risk Assessment process - and remember to Switch On Mate .
When access or switching is required on the electrical network for ANY PURPOSE the Control Centre MUST be advised prior to the operation starting, and at the completion of the operation.
Persons operating the equipment contained in this Manual must be appropriately trained and authorised by Western Power as per NOI 04-13. They should also ensure operating equipment is in good order and wear and use the correct protective apparel.
The equipment covered in this Manual is not exhaustive and there are items of equipment that have not yet been included. Whilst every effort has been made to ensure accuracy all users are encouraged to report any errors inaccuracies or omissions found while using the manual as a guide. If an amendment is required on an item of equipment or a new template is required for equipment not yet contained in this manual, contact your representative on the Operations Policy and Practices Committee or the Manager Network Operations - Network Operations Control Centre.
Arrangements will be made for the photography and text to be compiled to enable new templates to be made and distributed. This manual is a controlled document. When there are modifications or additions to this manual the modified or new templates will be replaced and a new index issued and dated accordingly.
It is the switching operators responsibility to operate only within their authorised levels.Attention
onsibility for safe working with electrical switchgear rests with th
Western Power
Network Switchgear Instruction Manual 1
Document Number PSC/80/3(78)V1
This Document Is Uncontrolled When Printed
This Document Is Uncontrolled When Printed
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 4 May 2010 Doc Ref: WPWorkProcedure2
NE
TW
OR
K S
WIT
CH
GE
AR
INS
TR
UC
TIO
N M
AN
UA
L 1
WO
RK
PR
OC
ED
UR
E IN
ST
RU
CT
ION
SNETWORK SWITCHGEAR INSTRUCTION MANUAL 1
WORK PROCEDURE INSTRUCTIONS
2 of 2
'A3' DX & N, Combination of restrictions
'D' Under Direction
'DN' Under Direct, EXCL Comm of RMU
'DX' Under Direct, EXCL Earthing
'R' Excludes switching on Regulators
'N' Excludes Commissioning of Ring Main Switchgear
'NX' Excludes Earthing & Comm of RMU
'S' Excludes writing and checking of switching programs
'X' Excludes Earthing
'Z' Authority Suspended
'G' Gas Insulated Transmission Switchgear
Switching Level Levels Include
1 All LV O/H systems including Distribution HV from drop-outs to transformers
2 All O/H apparatus including Reclosers, Sectionalisers, Regulators,
Capacitors and Ground mounted transformers.
3 Distribution HV O/H to U/G systems (ie. aerial to RMU )
4 LV underground systems
5 Distribution HV underground RMU to RMU
6 Operation of Distribution HV feeders from Zone Substations including
protection by-pass, transformer paralleling and transfer bus.
7 Transmission circuits from Zone Substations.
8 All apparatus within a Zone Substation.
9 Transmission circuits into Zone Substations.
10 All Terminal Substation apparatus.
11 Control Room operations including switching schedule preparation (NOCC).
12 Control Room operations including switching schedule preparation (SOCC).
SWITCHING AUTHORITIES AND COMPETENCY (Ref NOI 04-13)
AUTHORITY RESTRICTIONS
Operation Options
Special Notes
Ensure the switchgear is fit for service prior to and after operation.
Note: The transformer fuse switch has a different operating mechanism to the circuit switch.
Caution
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006Doc Ref: WPAlstomFBX1
OpeningClosingEarthingHV FusesSpring Charge
3322116.6
33022013266
Manufacturer:Model:Rating:
Break Rating:Insulant:
AlstomFBX630 Amps16 KASF6
ALSTOMFBX
AL
ST
OM
FB
X
1 of 2
Voltage KV
OperationClosing the Circuit Switch
Special Notes
Confirm the circuit switch location and labeling prior to operation.
Special Notes
1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle CW to the stop position to close the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.
OperationOpening the Circuit Switch
1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to open the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
Confirm the circuit switch location and labeling prior to operation.
Operation
Closing the Transformer Fuse Switch1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to charge the operating spring then CW to the stop position to close the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.
Caution
Caution
Caution
C 2 E 2
F 2
C 2 E 2
Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators
1
1
1
2
2
22
Closing
Opening Earthing Isolate / Misc
Symbols Colour / Reference Operating Instruction Colour Reference Switchgear Category Colour Reference
Overhead
Underground
LV
Circuit Breakers
MiscYesYesNo
No
CautionC 2 Main Picture
Grid ReferenceNote
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 4 May 2010Doc Ref: WPManualInstructions1
NETWORK SWITCHGEAR INSTRUCTION MANUAL 1DISTRIBUTION - HOW TO USE THIS MANUAL
NE
TW
OR
K S
WIT
CH
GE
AR
INS
TR
UC
TIO
N M
AN
UA
L 1
DIS
TR
IBU
TIO
N - H
OW
TO
US
E T
HIS
MA
NU
AL
1 of 2
The following is a general guide for the use of this manual. For company specific instructions please refer to the introductory pages. Page 1 of this guide template shows how to interpret data on 'Page 1' of all templates in this manual. Please turn over for a guide on interpreting data on 'Pages 2, 3 and 4' of templates in this manual.
Document reference name.
Quote this for updates etc.
Company logo. Identifies
the manual issuing
company.
Switchgear name. Templates are
sorted in alphabetical order.
Switchgear details. Rating is maximum current load rating. If text is red then rating is maximum load
breaking capacity.
Operating option icons. Use these as a quick visual reference for
operating function options on this switchgear.
Page number icon. Indicates the total number
of pages used for the switchgear information.
Date issued.Indicates
issuing date for switchgear template. This must be the
same as listed in the manual
index.
Red arrows Indicate nominal
operating voltage (KV) or
LV where specifically indicated.
Switchgear photograph. May be one
shot or a montage showing
switchgear options.
Main switchgear
picture reference grid.Refer to grid
co-ordinates in top left corner of operating instruction pictures.
Special notes. General
precautions / instructions pertinent to switchgear
type.
Quick reference legend for mandatory operational
checks prior to operation
Mainphotograph grid reference. This
refers to the section of the
main photograph
shown in operating
instruction.
Operating instruction
photographs. In most cases
the photograph will show
apparatus as you would find
it prior to performing the
operation.
Switchgear operating
options. Red arrows indicate
functions available.
Operating instruction.
Step numbers correspond
with coloured arrows in the
adjacent photograph.
Special notes pertinent to the
particular operating instruction
Page number within
switchgear category colour.
Western Power
document reference number.
Switchgear name in large type for quick referencing.
Switchgear category colour for
quick referencing.
Operating instruction arrows. Numbers correspond with step numbers in adjacent operating instructions. Arrows
are colour coded for the particular operation.
Operating instruction headings. Headings are colour coded for the particular operating
instruction.
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006 Doc Ref: WPAlstomFBX2
ALSTOMFBX
AL
ST
OM
FB
X
2 of 2
Operation
Opening the Transformer Fuse Switch
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW marginally to the stop position to open the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.
Caution
OperationClosing the Earth Switch
Special Notes
Confirm the earth switch location and labeling prior to operation.
Ensure the remote end of the circuit / transformer to be earthed is isolated.
1. Confirm the circuit / transformer fuse switch is open.2. Test 'Safe to Earth' with the neon indicator as shown.3. Slide the earth switch interlock lever to the right and:4. Unlock if required and insert the operating handle into the earth switch operating mechanism.5. Rotate the operating handle CW to the stop position to close the earth switch. Remove the operating handle.6. Confirm the mechanical indicator agrees with the earth switch status.
Caution
F 2
C 2 D 2 F 2
OperationOpening the Earth Switch
Special Notes
Confirm the earth switch location and labeling prior to operation.
1. Unlock if required and insert the operating handle into the earth switch operating mechanism.2. Rotate the operating handle ACW to the stop position to open the earth switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the earth switch status.
Caution
C 2 D 2 F 2
OperationAccess to the HV Fuses
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
1. Confirm the transformer fuse switch is open and the transformer earth switch is closed.2. Confirm the HV fuse operation via the red mechanical indicator as shown. 3. Insert the supplied HV fuse access panel latch key and rotate ACW. Remove the key.4. Raise the HV fuse access panel interlock and lower the HV fuse access panel.
Caution
F 2 F 4
4
2
3
OperationAccess to the HV Fuses
Special Notes
Ensure the HV fuse striker pin is located in the top mounting assembly.
Exercise caution when removing HV fuses as they may be hot.
5. Grasp the end cap tabs as shown and withdraw the required HV fuse.6. Replace the required HV fuse(s) with the striker pin(s) facing towards the access cover.7. Raise the HV fuse access panel.8. Insert the supplied HV fuse access panel latch key and rotate CW. Remove the key.
Caution
F 4
5
5
1
52
34
1
2
2
Closing
Opening Earthing Isolate / Misc
Symbols Colour / Reference Operating Instruction Colour Reference Switchgear Category Colour Reference
Overhead
Underground
LV
Circuit Breakers
MiscYesYesNo
No
CautionC 2 Main Picture
Grid ReferenceNote
Operating option icons. Use these as a quick visual reference for
operating function options on this switchgear.
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 4 May 2010 Doc Ref: WPManualInstructions2
NE
TW
OR
K S
WIT
CH
GE
AR
INS
TR
UC
TIO
N M
AN
UA
L 1
DIS
TR
IBU
TIO
N -
HO
W T
O U
SE
TH
IS M
AN
UA
LNETWORK SWITCHGEAR INSTRUCTION MANUAL 1
DISTRIBUTION - HOW TO USE THIS MANUAL
2 of 2
Page 2 of this guide template shows how to interpret data on 'Pages 2, 3 and 4' of templates in this manual. In the majority of cases a complete switchgear template will consist of two pages only. If more than two pages are required for a particular switchgear item the total page number will be indicated in the top right hand corner of 'Page 1' of the relevant switchgear template. If a switchgear item has only one page of instructions the reverse side of the template will not have a page reference and will only show the switchgear item name and operation icons. The words 'This page is deliberately left blank' will be printed in the centre of the page.
Document reference name. Quote this for for
updates etc.
Switchgear name. Templates are sorted in
alphabetical order.
Page number icon. Indicates the total number of pages used for the switchgear information. If the template has only one
page nothing will appear here.
Date issued.Indicates
issuing date for switchgear template. This must be the
same as listed in the manual
index.
Page number within
switchgear category colour. If
template has only one page
nothing will appear here.
Operating instruction.
Step numbers correspond
with coloured arrows in adjacent
photograph.
Operating instruction headings.
Headings are colour coded
for the particular operating
instruction.
Western Power document
reference number.
Switchgear name in large type for quick referencing.
Switchgear category colour for quick referencing.
Special notes pertinent to the
particular operating instruction
Operating instruction
photographs. In most cases
the photograph will show
apparatus as you would find
it prior to performing the
operation.
Main photograph
grid reference. This refers to
section of main photograph
shown in operating
instruction.
This Document Is Uncontrolled When Printed
Local Manual OperatingHandle Open / Close
HV Stick - Close
Access Cover - Bolted
Relay / Meter AnalogHV Stick - Open
Arc Fault Protection
Air Operated
Relay Targets - Flag LED
Local Manual PushButton Close
Local Electrical Close
LV Links
Distance Protection
Overcurrent Protection Tap ChangerAutomatic
Isolation
Differential Protection
Lock and Tag
Open
Oil Level Gauge
Not ApplicableDo Not Operate
Remote ElectricalOpen / Close
Interlock Key
Auto Reclose
Closed
Local Manual PushButton Open / Close
Remote Electrical Open
HV Stick - Open / Close
Assembly Required Local Manual PushButton Open
Remote Electrical Close
Local Electrical Open
Earth Fault Protection
Tap ChangerManual
Pilot Wire Protection
Padlock Open
Padlock Close
Local Manual OperatingHandle Close
Racking In / Out
Fault Indicators
Local Manual OperatingHandle Open
Gas / Oil PressureGauge
Hand Operated Close
Hand OperatedClose / Open
HV fuses
Racking Trolley - CB
Local ElectricalClose / open
Earthing - ManualApplied
Test Probes
Plug Box - CB
LV De-ion / Fuse
Latching
Spring Charge
Solenoid Operated
Shutters
Directional Protection
Local Manual OperatingHandle - Earthing
Earthing Via CB / Switch
Hand Operated Open
Rackable VT
Viewing Ports
Two Man operation
HV Stick - Earthing
Relay / Meter Digital
Hydraulic Pump
LV Fuse
CW ClockwiseACW Anti-clockwise
Page 1 0f 1 Page 1 0f 2
Page 2 0f 2
Page 1 0f 3
Page 2 0f 3
Page 3 0f 3
Page 1 0f 4
Page 2 0f 4
Page 3 0f 4
Page 4 0f 4Instruction ContinuedFrom Previous PageInstruction Continued
A
A
A
A
D
H
HC
LH
R
R
T
TM
A
P
O
Manual Open / Close
Manual Close
Manual Open
L
Linked Templates Visual Confirmation Magnified Image
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 4 May 2010Doc Ref: WPSymbolLegend1
NETWORK SWITCHGEAR INSTRUCTION MANUAL 1SYMBOL LEGEND
NE
TW
OR
K S
WIT
CH
GE
AR
INS
TR
UC
TIO
N M
AN
UA
L 1
SY
MB
OL
LE
GE
ND
1 of 1
The following information is the Symbol Legend for the Western Power Network Switchgear Instruction Manual 1 .
Please refer to the How To Use This Manual template for further details on how to use this Network Switchgear Instruction Manual 1 .
SYMBOL LEGEND
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 4 May 2010 Doc Ref: WPSymbolLegend2
NE
TW
OR
K S
WIT
CH
GE
AR
INS
TR
UC
TIO
N M
AN
UA
L 1
SY
MB
OL
LE
GE
ND
NETWORK SWITCHGEAR INSTRUCTION MANUAL 1SYMBOL LEGEND
This page is deliberately left blank.
Switchgear Type Date Issued
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 4 May 2010Doc Ref: WPIndexV141
NETWORK SWITCHGEAR INSTRUCTION MANUAL 1DISTRIBUTION - VERSION 1.4
NE
TW
OR
K S
WIT
CH
GE
AR
INS
TR
UC
TIO
N M
AN
UA
L 1
DIS
TR
IBU
TIO
N - V
ER
SIO
N 1.4
1 of 2
2 March 20062 March 2006
4 May 20104 May 2010
2 March 20062 March 2006
17 February 2009 2 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 2006
27 August 200727 August 2007
2 March 20062 March 20062 March 2006
17 February 200917 February 200917 February 200917 February 2009
27 August 200717 February 2009
2 March 200627 August 200727 August 2007
2 March 200617 February 2009
27 August 20072 March 2006
17 February 200927 August 2007
17 February 200917 February 200917 February 200917 February 200917 February 2009
2 March 20062 March 20062 March 20062 March 2006
The following is an index of all switchgear templates in this manual.Please note: The Date Issued data on each switchgear template must be the same as in this index. Any additions or reissue of current switchgear templates will be accompanied with a new index template. Templates are listed alphabetically. Please ensure all templates in the manual, including new and reissued, are sorted alphabetically. Denotes new templates issued with this Index - Version 1.4
Underground Switchgear
Overhead Switchgear
Circuit Breakers
Alstom FBA5 (2 Templates) Alstom FBX Alstom Fluokit M Alstom Fluokit M C10M Motorised Isolator English Electric OLX Felten & Guilleaume GA2K GEC DDFAHazemeyer Magnefix MD (2 Templates) Holec SVS (2 Templates) Long & Crawford ETV3/2 Long & Crawford T4GF3 (2 Templates) Long & Crawford Type GF3 & J4 Long & Crawford Type J Long & Crawford Type J3 Long & Crawford Type R3 Merlin Gerin RM6 Ring Main Isolator - Type 1 Merlin Gerin RM6 Ring Main Isolator - Type 2 Merlin Gerin / Schneider SM6 (2 Templates) Merlin Gerin / Schneider SM6 Circuit Breaker Merlin Gerin Vercors M6 Nebb Brown Boveri RGB12 S & C SML 20 Fuse Element S & C SML 20 Ground Mounted Fuse (2 Templates) Schneider D14 Circuit Switch Siemens 8CK2 Western Power Mechanical Actuator
ABB NWI-58 Pole Top Capacitor ALM Air Break Switch Falcon Air Break Switch Falcon - Ezybreak Air Break Switch Haycolec Sectionaliser Type 01-04 HV Drop-out (HVDO) Fuses McGraw Edison RV ACR Nulec N24-150 Auto Circuit Recloser Nulec RL Load Break Switch / Sectionaliser Nulec U27 ACR Nulec W Series Single Phase Auto Circuit Recloser Reyrolle OYT Recloser S & C Fault Tamer (2 Templates) S & C SMD20 Boric Acid Drop-out Fuses Stanger In Line Links
ABB Unigear ZS1 Capacitor Circuit Interlock ABB Unigear ZS1 Circuit Breaker (2 Templates) ABB Unigear ZS1 Earth Switch ABB Unigear ZS1 Transformer Switch / Earth Switch / HV Fuses ABB Unigear ZS1 VT Alstom GL 107 Circuit Breaker Alstom HWX Busbar Earth Switch Alstom HWX Circuit Breaker (2 Templates) Alstom HWX VT
Switchgear Type Date Issued
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 4 May 2010 Doc Ref: WPIndexV142
NE
TW
OR
K S
WIT
CH
GE
AR
INS
TR
UC
TIO
N M
AN
UA
L 1
DIS
TR
IBU
TIO
N -
VE
RS
ION
1.4
NETWORK SWITCHGEAR INSTRUCTION MANUAL 1DISTRIBUTION - VERSION 1.4
2 of 2
ASEA HLC 63-52/1250 Circuit BreakerEmail J18 Solenoid CBEmail J22 Solenoid CBEnglish Electric OKW3 Circuit Breaker GEC Alsthom SBV 24 Circuit Breaker (2 Templates) GEC Alsthom SBV 24 Earth Truck (2 Templates)GEC D4XD Circuit BreakerGEC OX36 Circuit BreakerInoue Denki 30TE0150RS Circuit BreakerMagrini Galileo 38 MGE 1000 BM Circuit BreakerMagrini Galileo 38 MGE 1000 BM20 Circuit BreakerMagrini Scarpa E Magnano MMS24C Circuit BreakerNilsen AEI JB422/OMI Retrofit Circuit Breaker (2 Templates) Nilsen GEC OLX Retrofit Circuit Breaker (2 Templates) Nuovo Magrini Galileo 36 GI-E 25 Type 1Nuovo Magrini Galileo 36 GI-E 25 Type 2Reyrolle 2A9T/X1/MO Circuit Breaker (2 Templates) Reyrolle D16 GFC H VT Reyrolle LMVP X5B / X8 Circuit Breaker (2 Templates) Reyrolle LMVP X5B / X8 CB Earthing Schneider AD4 MC Set Type SF1 CB (2 Templates) Schneider AD4 MC Set Type SF1 Earth Switch Schneider AD4 MC Set Type SF1 VTWestern Power CB Earth Switch - Generic (2 Templates)Westinghouse (Siemens) Retrofit J18 CBYorkshire YSF6 Circuit Breaker (2 Templates)
Alarm and Fault Relay Flags - Distribution SystemEquipment Label Reading (2 Templates)Horstmann Alpha E Fault Indicator Horstmann Fluid Type Fault Indicator HV - LV Fuse Rating Tables Kyle Form 4C Electronic Recloser Control Nulec CAPM2 Electronic Recloser Control (2 Templates) Nulec CAPM5 Electronic Recloser Control (2 Templates) Nulec Electronic Control Box Operation Flow Chart SEL 351 Protection Relay
GEC VR-1 Voltage Regulator Control
ABB SLBM / BSL 3 Phase Gang Isolator Nilsen AB5 / 200 Circuit Breaker Nilsen NAB1 / 20 Circuit Breaker
2 March 20062 March 20062 March 20062 March 2006
17 February 200917 February 2009
2 March 20064 May 2010
2 March 20062 March 20062 March 20062 March 2006
27 August 200727 August 2007
2 March 20062 March 2006
9 November 20062 March 2006
17 February 200917 February 200917 February 200917 February 200917 February 2009
2 March 20062 March 20062 March 2006
9 November 20064 May 2010
17 February 20099 November 2006
4 May 20102 March 2006
17 February 200917 February 20099 November 20069 November 2006
17 February 2009
27 August 20072 March 20062 March 2006
Miscellaneous Equipment
Voltage Regulators
Low Voltage Switchgear
Operation Options
Special Notes
Ensure the switchgear is fit for service prior to and after operation.Note: The transformer fuse switch has a different operating mechanism to the circuit switch.Note: The earth switch operating handle is different to the circuit switch operating handle.
Note: This switchgear can have both a local manual and electrical operation option. Confirm the mechanism type prior to operation. Remote electrical operation is always the preferred method of operation.
Caution
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006Doc Ref: WPAlstomFBA51
OpeningClosingIsolationRackingSpring Charge
EarthingAuto RecloseHV FusesO/C ProtectionE/F Protection
3322116.6
33022013266
Manufacturer:Model:Rating:
Break Rating:Insulant:
AlstomFBA5630 Amps16 KASF6
ALSTOMFBA5
AL
ST
OM
FB
A5
1 of 3
Voltage KV
OperationClosing the Circuit Switch
Special Notes
Confirm the circuit switch location and labeling prior to operation.
Special Notes
1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle CW to the stop position to close the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.
OperationOpening the Circuit Switch
1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to open the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
Confirm the circuit switch location and labeling prior to operation.
Operation
Closing the Transformer Fuse Switch1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to charge the operating spring then CW to the stop position to close the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.
Caution
Caution
Caution
D 3
F 3
D 3
Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators
1
1
1
2
2
22
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006 Doc Ref: WPAlstomFBA52
ALSTOMFBA5
AL
ST
OM
FB
A5
2 of 3
Operation
Opening the Transformer Fuse Switch
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW marginally to the stop position to open the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.
Caution
OperationClosing / Opening the Circuit Switch - Local Elec.
Special Notes
Confirm the circuit switch location and labeling prior to operation.
At the completion of the electrical operation confirm the circuit switch status via the mechanical indicator.
1. Confirm the '24 VOLT DC SUPPLY FOR CONTROL' switch is on.2. Plug in the remote operation control switch as shown and stand away from the RMU.3. Rotate the switch CW to the 'ON' position to close the circuit switch.4. Rotate the switch ACW to the 'OFF' position to open the circuit switch.5. If required unplug the remote operation control switch.
Caution
F 3
B 1
OperationClosing the Remote Circuit Switch - Manually
Special Notes
Confirm the circuit switch location and labeling prior to operation.
At the completion of the operation confirm the circuit switch status via the mechanical indicator.
1. Switch the '24 VOLT DC SUPPLY FOR CONTROL' off.2. Unlock if required and insert the operating handle into the open / close operating mechanism as shown.3. Rotate the operating handle CW until the circuit switch closes.4. Remove the operating handle. Lock if required.5. If required switch the '24 VOLT DC SUPPLY FOR CONTROL' on.
Caution
B 2
OperationOpening the Remote Circuit Switch - Manually
Special Notes
Confirm the circuit switch location and labeling prior to operation.
At the completion of the operation confirm the circuit switch status via the mechanical indicator.
1. Switch the '24 VOLT DC SUPPLY FOR CONTROL' off.2. Unlock if required and insert the operating handle into the open / close operating mechanism as shown.3. Rotate the operating handle CW until the circuit switch opens.4. Remove the operating handle. Lock if required.5. If required switch the '24 VOLT DC SUPPLY FOR CONTROL' on.
Caution
B 2
1
1
2
3
3
2
2
2
34
OperationClosing the Earth Switch
Special Notes
Confirm the earth switch location and labeling prior to operation.
Ensure the remote end of the circuit / transformer to be earthed is isolated.
1. Confirm the circuit / transformer fuse switch is open.2. Test 'Safe to Earth' with the neon indicator as shown.3. Slide the earth switch interlock lever to the left and:4. Unlock if required and insert the earth switch operating handle into the earth switch operating mechanism.5. Rotate the operating handle CW to the stop position to close the earth switch. Remove the operating handle.6. Confirm the mechanical indicator agrees with the earth switch status.
Caution
C 3 E 3 G 3
5
23
4
Date Issued: 2 March 2006Doc Ref: WPAlstomFBA53
3 of 3Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
ALSTOMFBA5A
LS
TO
M F
BA
5
OperationOpening the Earth Switch
Special Notes
Confirm the earth switch location and labeling prior to operation.
1. Unlock if required and insert the earth switch operating handle into the earth switch operating mechanism.2. Rotate the operating handle ACW to the stop position to open the earth switch.3. Remove the earth switch operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the earth switch status.
Caution
C 3 E 3 G 3
OperationAccess to the HV Fuses
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
1. Confirm the transformer fuse switch is open and the transformer earth switch is closed.2. Confirm the HV fuse operation via the red indicator as shown. 3. Insert the supplied HV fuse access panel latch key and rotate ACW. Remove the key.4. Remove the HV fuse access panel.
Caution
F 7 G 5
2
3
OperationAccess to the HV Fuses
Special Notes
Ensure the HV fuse striker pin is located in the top mounting assembly.
Exercise caution when removing HV fuses as they may be hot.
5. Grasp the end cap tabs as shown and withdraw the required HV fuse.6. Replace the required HV fuse(s) with the striker pin(s) facing towards the access panel.7. Replace the HV fuse access panel.8. Insert the supplied HV fuse access cover latch key and rotate CW. Remove the key.
Caution
F 5
4
4
12
This page is deliberately left blank.
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006 Doc Ref: WPAlstomFBA54
AL
ST
OM
FB
A5
ALSTOMFBA5
Operation Options
Special Notes
Ensure the switchgear is fit for service prior to and after operation.
Note: The transformer fuse switch has a different operating mechanism to the circuit switch.
Caution
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006Doc Ref: WPAlstomFBX1
OpeningClosingIsolationRackingSpring Charge
EarthingAuto RecloseHV FusesO/C ProtectionE/F Protection
3322116.6
33022013266
Manufacturer:Model:Rating:
Break Rating:Insulant:
AlstomFBX630 Amps16 KASF6
ALSTOMFBX
AL
ST
OM
FB
X
1 of 2
Voltage KV
OperationClosing the Circuit Switch
Special Notes
Confirm the circuit switch location and labeling prior to operation.
Special Notes
1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle CW to the stop position to close the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.
OperationOpening the Circuit Switch
1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to open the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
Confirm the circuit switch location and labeling prior to operation.
Operation
Closing the Transformer Fuse Switch1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to charge the operating spring then CW to the stop position to close the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.
Caution
Caution
Caution
C 2 E 2
F 2
C 2 E 2
Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators
1
1
1
2
2
22
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006 Doc Ref: WPAlstomFBX2
ALSTOMFBX
AL
ST
OM
FB
X
2 of 2
Operation
Opening the Transformer Fuse Switch
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW marginally to the stop position to open the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.
Caution
OperationClosing the Earth Switch
Special Notes
Confirm the earth switch location and labeling prior to operation.
Ensure the remote end of the circuit / transformer to be earthed is isolated.
1. Confirm the circuit / transformer fuse switch is open.2. Test 'Safe to Earth' with the neon indicator as shown.3. Slide the earth switch interlock lever to the right and:4. Unlock if required and insert the operating handle into the earth switch operating mechanism.5. Rotate the operating handle CW to the stop position to close the earth switch. Remove the operating handle.6. Confirm the mechanical indicator agrees with the earth switch status.
Caution
F 2
C 2 D 2 F 2
OperationOpening the Earth Switch
Special Notes
Confirm the earth switch location and labeling prior to operation.
1. Unlock if required and insert the operating handle into the earth switch operating mechanism.2. Rotate the operating handle ACW to the stop position to open the earth switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the earth switch status.
Caution
C 2 D 2 F 2
OperationAccess to the HV Fuses
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
1. Confirm the transformer fuse switch is open and the transformer earth switch is closed.2. Confirm the HV fuse operation via the red mechanical indicator as shown. 3. Insert the supplied HV fuse access panel latch key and rotate ACW. Remove the key.4. Raise the HV fuse access panel interlock and lower the HV fuse access panel.
Caution
F 2 F 4
4
2
3
OperationAccess to the HV Fuses
Special Notes
Ensure the HV fuse striker pin is located in the top mounting assembly.
Exercise caution when removing HV fuses as they may be hot.
5. Grasp the end cap tabs as shown and withdraw the required HV fuse.6. Replace the required HV fuse(s) with the striker pin(s) facing towards the access cover.7. Raise the HV fuse access panel.8. Insert the supplied HV fuse access panel latch key and rotate CW. Remove the key.
Caution
F 4
5
5
1
52
34
1
2
2
33
2
2
3
3
1
1
2
1
Operation Options
Special Notes
Ensure the switchgear is fit for service prior to and after operation.
Note: The transformer fuse switch has a different operating mechanism to the circuit switch. The main picture shows a transformer fuse switch.
Note: There is a motorised version of this switchgear. Refer to the ALSTOM FLUOKIT M C10M MOTORISED ISOLATOR template in this manual if required.
Caution
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 4 May 2010Doc Ref: WPAlstomFluokitM1
OpeningClosingSpring Charge
EarthingHV Fuses
33 22 11 6.6
330 220 132 66
Manufacturer:Model:Rating:
Break Rating:Insulant:
Alstom FluokitM630 Amps630 AmpsSF6
ALSTOM FLUOKIT MA
LS
TO
M F
LU
OK
IT M
1 of 2
Voltage KV
Operation Closing the Circuit Switch
Special Notes
Confirm the circuit switch location and labeling prior to any operation.
Special Notes
1. Unlock if required and slide out the operating handle interlock bar.2. Insert the operating handle into the operating mechanism as shown.3. Rotate the operating handle ACW to the stop position to close the circuit switch.4. Remove the operating handle.5. Confirm the mechanical indicator shows
Operation Opening the Circuit Switch 1. Unlock if required and slide out the operating handle interlock bar.2. Insert the operating handle into the operating mechanism as shown.3. Rotate the operating handle CW to the stop position to open the circuit switch.4. Remove the operating handle.5. Confirm the mechanical indicator shows
Special Notes
Confirm the transformer fuse switch location and labeling prior to any operation.
Confirm the circuit switch location and labeling prior to any operation.
Operation
Closing the Transformer Fuse Switch 1. Unlock if required and slide out the operating handle interlock bar.2. Insert the operating handle into the operating mechanism as shown.3. Rotate the operating handle ACW to the stop position to close the transformer fuse switch then rotate the handle CW to charge the tripping mechanism spring.4. Confirm the mechanical indicator shows
Caution
Caution
Caution
D 4
D 4 F 4
D 4
Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 4 May 2010 Doc Ref: WPAlstomFluokitM2
ALSTOM FLUOKIT M A
LS
TO
M F
LU
OK
IT M
2 of 2
Operation
Opening the Transformer Fuse Switch
Special Notes
Confirm the transformer fuse switch location and labeling prior to any operation.
1. Slide out the operating mechanism interlock bar as shown.2. Raise the trip lever to open the transformer fuse switch.3. Confirm the mechanical indicator shows
Caution
Operation Closing the HV Earth Switch
Special Notes
Confirm the HV earth switch location and labeling prior to any operation.
Ensure the remote end of the circuit / transformer to be earthed is isolated.
1. Slide out the operating mechanism interlock bar. 2. Confirm the relevant HV switch is open.3. Perform a 'Safe To Earth' test using the neon indicators.4. Insert the operating handle into the earth switch operating mechanism as shown.5. Rotate the operating handle CW to the stop position to close the earth switch.6. Confirm the mechanical indicator shows
Caution
F 2
F 4
Operation Opening the HV Earth Switch
Special Notes
Confirm the HV earth switch location and labeling prior to any operation.
1. Slide out the operating mechanism interlock bar. 2. Insert the operating handle into the earth switch operating mechanism as shown.3. Shift the earth switch interlock lever to the right (as shown) and gently rotate the operating handle ACW to the first stop position. Release the interlock lever.4. Rotate the operating handle ACW to the stop position to open the HV earth switch.5. Confirm the mechanical indicator shows
Caution
F 4
Operation Access to the HV Fuses
Special Notes
HV fuse striker pins must be located on the top of the HV fuse.
Exercise caution when handling HV fuses as they may be hot.
1. Confirm the relevant HV transformer HV earth switch is closed.2. Rotate the HV fuse access cover handle ACW and remove the access cover.
Caution
D 8
1
2
1
5
4
4
3
3
23
2
31
3
2
6
74
Operation Options
Special Notes
Ensure the switchgear is fit for service prior to and after operation.
Note: For operation of the earth switch and access to the HV fuses refer to the ALSTOM FLUOKIT M template in this manual.
Caution
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 4 May 2010Doc Ref: WPAlstomFluokitMC10m1
3322116.6
33022013266
Manufacturer:Model:Rating:
Break Rating:Insulant:
Alstom FluokitM C10m Motorised Isolator630 Amps630 AmpsSF6
ALSTOM FLUOKIT MC10M MOTORISED ISOLATOR
AL
ST
OM
FL
UO
KIT
M C
10M M
OT
OR
ISE
D IS
OL
AT
OR
1 of 2
Voltage KV
OperationClosing / Opening the Circuit Switch - Local Elec.
Closing / Opening the Circuit Switch - Local Elec.
Closing / Opening the Circuit Switch - Local Elec.
Special Notes
Confirm the circuit switch location and labeling prior to any operation.
Special Notes
1. Rotate the 'LOCAL REMOTE' switch on the RTU ACW to the 'LOCAL' position.
Operation
2. Confirm the 'ISOLATION SWITCH' on the panel directly above the switch unit is in the 'I' (on) position as shown.3. Confirm the key locking switch on the switchgear panel is in the 'I' (on) position as shown.
Special Notes
Confirm the remote operating switch is in the neutral (vertical) position before plugging the control cable into the socket.
Confirm the circuit switch location and labeling prior to any operation.
Operation
4. Plug the remote operating switch control cable connector into the socket on the panel directly above the switch unit as shown.5. With the operating switch in hand move a safe distance from the switch unit.To Close:6. Rotate the remote operating switch CW to the 'ON' position and release to close the switch.7. Confirm the mechanical indicator shows
Caution
Caution
Caution
N/A
G 3
F 2 E 4
Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators
Opening / Closing - RemoteOpening / Closing - Local ElectricalOpening / Closing - ManualEarth Switch Opening / Closing - Manual
83
2
910
4
4
5
76
9
1113
13
8
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 4 May 2010 Doc Ref: WPAlstomFluokitMC10m2
ALSTOM FLUOKIT MC10M MOTORISED ISOLATOR
AL
ST
OM
FL
UO
KIT
M C
10M
MO
TO
RIS
ED
ISO
LA
TO
R
2 of 2
Operation Special Notes
Confirm the circuit switch location and labeling prior to any operation.
1. Rotate the 'LOCAL REMOTE' switch on the RTU ACW to the 'LOCAL' position.2. Rotate the 'ISOLATION SWITCH' on the panel directly above the switch unit ACW to the 'O' (off) position.3. Rotate the key locking switch on the switchgear panel CW to the 'O' (off) position.
Caution
F 2 E 4
Operation Special Notes
Confirm the circuit switch location and labeling prior to any operation.
4. Rotate the manual control knob on the switchgear panel ACW until the notches align with the black indicators.5. Unlock and remove the padlock then slide out the operating mechanism interlock bar.
Caution
C 6
Operation Special Notes
Confirm the circuit switch location and labeling prior to any operation.
To Close: 6. Insert the operating handle into the operating mechanism as shown.7. Rotate the operating handle ACW to the stop position to close the switch.8. Confirm the mechanical indicator showsTo Open:9. Rotate the operating handle CW to the stop position to open the switch.
Caution
C 6
Closing / Opening the Circuit Switch - Manually
Closing / Opening the Circuit Switch - Manually
Closing / Opening the Circuit Switch - Manually
Special Notes
Confirm the circuit switch location and labeling prior to any operation.
Operation
To Open:8. Rotate the remote operating switch ACW to the 'OFF' position and release to open the switch.9. Confirm the mechanical indicator shows10. At the completion of the operation remove the remote operating switch cable connector from the socket.11. Rotate the 'LOCAL REMOTE' switch on the RTU CW to the 'REMOTE' position.
Caution
G 3
Operation Special Notes
Confirm the circuit switch location and labeling prior to any operation.
10. Remove the operating handle.11. Confirm the mechanical indicator shows12. Replace the operating mechanism interlock bar and padlock.13. Rotate the manual control knob on the switchgear panel CW until the notches are clear of the black indicators.14. Rotate the key locking switch CW to the 'O' (on) position.15. Rotate the 'ISOLATION SWITCH' CW to the 'I' (on) position.16. Rotate the 'LOCAL REMOTE' switch on the RTU CW to the 'REMOTE' position.
Caution
C 6
Closing / Opening the Circuit Switch - Manually
Closing / Opening the Circuit Switch - Local Elec.
Operation Options
Special Notes
Ensure the switchgear is fit for service prior to and after operation.
Note: This switchgear is not spring assisted. All operations must be done in a firm and continuous motion to the stop position.
Caution
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006Doc Ref: WPEnglishElectricOLX1
OpeningClosingIsolationRackingSpring Charge
EarthingAuto RecloseTest ProbesO/C ProtectionE/F Protection
3322116.6
33022013266
Manufacturer:Model:Rating:
Break Rating:Insulant:
English ElectricOLX800 Amps800 AmpsOil
ENGLISH ELECTRIC OLX
EN
GL
ISH
EL
EC
TR
IC O
LX
1 of 2
Voltage KV
OperationClosing the Circuit Switch
Special Notes
Confirm the circuit switch location and labeling prior to operation.
The operation is not spring assisted. Move the operating handle in a firm and continuous motion.
Special Notes
1. Unlock if required and rotate the circuit interlock ACW.2. Withdraw the circuit interlock pin.3. Move the operating handle CW in a firm and continuous motion to the stop position to close the circuit switch. 4. Confirm the operating handle aligns with the 'ON' indicator.5. Push in the circuit interlock pin.6. Rotate the circuit interlock CW and lock if required.
OperationOpening the Circuit / Transformer Fuse Switch
1. Unlock if required and rotate the circuit interlock ACW.2. Withdraw the circuit interlock pin.3. Move the operating handle ACW in a firm and continuous motion to the stop position to open the circuit switch. 4. Confirm the operating handle aligns with the 'OFF' indicator.5. Push in the circuit interlock pin.6. Rotate the circuit interlock CW and lock if required.
Special Notes
Confirm the remote end of the circuit is isolated prior to closing the earth switch.
The operation is not spring assisted. Move the operating handle in a firm and continuous motion.
Confirm the circuit switch location and labeling prior to operation.
The operation is not spring assisted. Move the operating handle in a firm and continuous motion.
Operation
Closing the Circuit Earth Switch1. Confirm the relevant circuit switch is open.2. Confirm the circuit interlock is rotated CW to the stop position as shown. Lock if required.3. Unlock if required and rotate the earth interlock CW.4. Withdraw the earth interlock pin.
Caution
Caution
Caution
G 2 G 3
C 2
G 6 F 7
Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators
3
3
3
4
2
2
2
1
2
1
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006 Doc Ref: WPEnglishElectricOLX2
ENGLISH ELECTRICOLX
EN
GL
ISH
EL
EC
TR
IC O
LX
2 of 2
Operation
Closing the Circuit Earth Switch
Special Notes
Confirm the remote end of the circuit is isolated prior to closing the earth switch.
The operation is not spring assisted. Move the operating handle in a firm and continuous motion.
5. Move the operating handle ACW in a firm and continuous motion to the stop position to close the earth switch.6. Push in the earth interlock pin.7. Rotate the earth interlock ACW and lock if required.
Caution
OperationOpening the Circuit Earth Switch
Special Notes
Confirm the circuit earth switch location and labeling prior to operation.
1. Unlock if required and rotate the earth interlock CW.2. Withdraw the earth interlock pin.3. Move the operating handle CW to the stop position to open the earth switch. 4. Confirm the operating handle aligns with the 'OFF' indicator.5. Push in the earth interlock pin.6. Rotate the circuit interlock ACW and lock if required.
Caution
C 2
C 2
E 7 OperationAccess to the Test Probes
Special Notes
Confirm the circuit earth switch location and labeling prior to operation.
1. Confirm the relevant circuit earth switch is closed.2. Unscrew the two (2) access cover retaining bolts.3. Lower the access cover.
Caution
A 7
6
2
1
7
5
3
OperationAccess to the Test Probes
Special Notes
Confirm the circuit switch location and labeling prior to operation.
4. Insert the appropriate probes to the stop position.5. Open the circuit earth switch. Perform tests as required.6. Close the circuit earth switch.7. Withdraw the probes.8. Close the access cover.9. Tighten the two (2) access cover retaining bolts.
Caution
A 7 E 7
2
4 4 4
1
OperationChecking the Switchgear Oil Level
Special Notes
Note: The oil level dipstick must be screwed home prior to checking oil levels.
1. Unscrew the oil level dipstick at the rear of the switchgear unit to confirm correct oil levels. At the completion of the check ensure the dipstick is screwed home correctly.
Caution
N/A
2
Operation Options
Special Notes
Ensure the switchgear is fit for service prior to and after operation. Note: The transformer fuse switch has a different operating mechanism to the circuit switch.
Caution
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006Doc Ref: WPF&GGA2K1
Opening Closing Isolation Racking Spring Charge
Earthing Auto Reclose HV Fuses O/C Protection E/F Protection
33 22 11 6.6
330 220 132 66
Manufacturer:Model:Rating:
Break Rating:Insulant:
Felten & Guilleaume GA2K 630 Amps 630 Amps SF6
FELTEN & GUILLEAUMEGA2K
FE
LTE
N &
GU
ILL
EA
UM
E G
A2K
1 of 2
Voltage KV
Operation Closing the Circuit Switch
Special Notes
Confirm the circuit switch location and labeling prior to operation.
Special Notes
1. Open the circuit switch open / close operating mechanism access flap.2. Insert the operating handle into the open / close operating mechanism.3. Push in and rotate the operating handle CW to the stop position to close the circuit switch. Remove the operating handle.4. Confirm the mechanical indicator agrees with the circuit switch status.
Operation Opening the Circuit Switch 1. Open the circuit switch open / close operating mechanism access flap.2. Insert the operating handle into the open / close operating mechanism.3. Push in and rotate the operating handle ACW to the stop position to open the circuit switch. Remove the operating handle.4. Confirm the mechanical indicator agrees with the circuit switch status.
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
Confirm the circuit switch location and labeling prior to operation.
Operation
Closing the Transformer Fuse Switch 1. Open the transformer fuse switch open / close operating mechanism access flap.2. Insert the operating handle into the open / close operating mechanism.3. Push in and rotate the operating handle ACW to the stop position then CW to the stop position to close the transformer fuse switch. Remove the handle.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.
Caution
Caution
Caution
C 2 D 2
F 2
C 2 D 2
Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators
2
2
2
3
3
3
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006 Doc Ref: WPF&GGA2K2
FELTEN & GUILLEAUMEGA2K
FE
LTE
N &
GU
ILL
EA
UM
E G
A2K
2 of 2
Operation
Opening the Transformer Fuse Switch
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
1. Open the transformer fuse switch open / close operating mechanism access flap.2. Insert the operating handle into the open / close operating mechanism.3. Push in and rotate the operating handle ACW marginally to the stop position to open the transformer fuse switch. Remove the operating handle.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.
Caution
Operation Closing the Earth Switch
Special Notes
Confirm the earth switch location and labeling prior to operation.
Ensure the remote end of the circuit / transformer to be earthed is isolated.
1. Confirm the circuit / transformer fuse switch is open.2. Unlock if required and open the earth switch open / close operating mechanism access flap.3. Insert the operating handle into the earth switch operating mechanism.4. Push in and rotate the operating handle CW to the stop position to close the earth switch.5. Confirm the mechanical indicator agrees with the earth switch status.
Caution
F 2
B 2 D 2 F 2
OperationOpening the Earth Switch
Special Notes
Confirm the earth switch location and labeling prior to operation.
1. Unlock if required and open the earth switch open / close operating mechanism access flap.2. Insert the operating handle into the earth switch operating mechanism.3. Push in and rotate the operating handle ACW to the stop position to open the earth switch. Remove the operating handle.4. Confirm the mechanical indicator agrees with the earth switch status.
Caution
B 2 D 2 F 2
OperationAccess to the HV Fuses
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
Exercise caution when removing HV fuses as they may be hot.
1. Confirm the transformer fuse switch is open and the transformer earth switch is closed.2. Insert the supplied HV fuse access cover latch key and rotate ACW. Raise and remove the HV fuse access cover.3. Raise the retaining bale of the HV fuse(s) to be replaced.4. Withdraw the HV fuse top mounting assembly.
Caution
F 3
3
2
OperationAccess to the HV Fuses
Special Notes
Ensure the HV fuse striker pin is located in the top mounting assembly.
Exercise caution when removing HV fuses as they may be hot.
5. Remove the required HV fuse from the lower mounting assembly.6. Replace the required HV fuse(s) with the striker pin(s) pointing to the top.7. Clean and lubricate all contact fittings prior to restoration of the HV fuse mounting assemblies.8. Lower the HV fuse retaining bale.9. Replace the HV fuse access cover and latch using the supplied latch key.
Caution
F 3
5
8
2
3
3
32
4
Operation Options
Special Notes
Ensure the switchgear is fit for service prior to and after any operation.
Note: The rotation direction of the operating handle for the required function - open / close - will depend on the switch location on the switchgear unit. Confirm the required direction before operating.
Note: Placing the 'FUSE ISOLATOR' in the 'ISOLATED' position earths the HV fuses.
Caution
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 17 February 2009Doc Ref: WPGECDDFA1
OpeningClosingSpring Charge
EarthingTest ProbesHV Fuses
3322116.6
33022013266
Manufacturer:Model:Rating:
Break Rating:Insulant:
GECDDFA400 Amps-Oil
GECDDFA
GE
C D
DFA
1 of 2
Voltage KV
OperationClosing the Circuit / Transformer Fuse Switch
Special Notes
Confirm the circuit / transformer fuse switch location and labeling prior to any operation.
Special Notes
1. Confirm the rotating interlock selector is in the circuit switch position as shown.2. Insert the operating handle into the open / close operating mechanism as shown.3. Rotate the operating handle in the required direction to the stop position to close the circuit / transformer fuse switch.4. Remove the operating handle.5. Confirm the mechanical indicator points to 'ON'.
OperationOpening the Circuit Switch1. Confirm the rotating interlock selector is in the circuit switch position as shown.2. Insert the operating handle into the open / close operating mechanism as shown.3. Rotate the operating handle in the required direction to the stop position to open the circuit switch.4. Remove the operating handle.5. Confirm the mechanical indicator points to 'OFF'.
Special Notes
Confirm the transformer fuse switch location and labeling prior to any operation.
Confirm the circuit switch location and labeling prior to operation.
Operation
Opening the Transformer Fuse Switch1. Push the 'TRIP' lever to the left to open the transformer fuse switch.2. Confirm the mechanical indicator points to 'OFF'.
Caution
Caution
Caution
B 2 F 2 G 2
D 2
F 2 G 2
Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators
1
2
1
3
3
1
2
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 17 February 2009 Doc Ref: WPGECDDFA2
GECDDFA
GE
C D
DFA
2 of 2
Operation
Closing the Earth Switch
Special Notes
Ensure the remote end of the circuit / transformer to be earthed is isolated.
Confirm the mechanical indicator points to 'EARTH' at the completion of the operation.
1. Confirm the relevant circuit / transformer fuse switch is open.2. Unlock if required and rotate the interlock selector to the earth position as shown.3. Insert the operating handle into the open / close operating mechanism as shown.4. Rotate the operating handle in the required direction to the stop position to close the earth switch.5. Remove the operating handle.
Caution
Operation
Closing the Earth SwitchSpecial Notes
Confirm the circuit earth switch location and labeling prior to any operation.
6. Confirm the mechanical indicator points to 'EARTH'7. If required rotate the interlock and lock in the 'Earth Switch On' position as shown.
Caution
B 2 F 2 G 2
B 2 F 2 G 2
OperationAccess to the HV Fuses
Special Notes
Exercise caution when removing HV fuses as they may be hot.
When replacing the HV fuse ensure the striker pin points upwards.
1. Confirm the transformer fuse switch is open.2. Confirm the HV fuse operation via the red target indicator as shown. 3. Insert the operating handle into the Fuse Isolator mechanism as shown and rotate CW to the 'ISOLATED' position. The HV fuses are now earthed.4. Raise the HV fuse access panel. Remove and replace the relevant HV fuse. Close the access panel.5. Rotate the Fuse Isolator to the 'SERVICE' position.
Caution
D 25
33
OperationAccess to the Circuit Test Probes
Special Notes
When restoring the after test ensure the earthing bar is pushed home firmly to the stop position.
1. Confirm the relevant circuit / transformer fuse switch is open and the circuit / transformer earth switch is closed.2. Unscrew the circuit test probes access cover retaining bolt.3. Lower the test probe access cover.4. Lower the earthing bar. Perform the required tests.Note: To restore, reverse the above instructions.
Caution
B 6
2
34
2
7
3
4
Operation
Opening the Earth SwitchSpecial Notes
Confirm the circuit earth switch location and labeling prior to any operation.
Confirm the mechanical indicator points to 'OFF' at the completion of the operation.
1. Unlock if required and rotate the interlock selector to the earth position as shown.2. Insert the operating handle into the open / close operating mechanism as shown.3. Rotate the operating handle in the required direction to the stop position to open the earth switch.4. Remove the operating handle.5. If required rotate the interlock selector to the circuit switch position. Lock if required.
Caution
B 2 F 2 G 2
2
31
3
Operation Options
Special Notes
Ensure the switchgear is fit for service prior to and after operation.
Note: The three (3) phase operating handle is to be used for the closing function only.
Caution
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006Doc Ref: WPHazemeyerMD1
OpeningClosingIsolationRackingSpring Charge
EarthingAuto RecloseHV FusesO/C ProtectionE/F Protection
3322116.6
33022013266
Manufacturer:Model:Rating:
Break Rating:Insulant:
HazemeyerMagnefix MD250 / 400 Amps400 AmpsAir
HAZEMEYERMAGNEFIX MD
HA
ZE
ME
YE
R M
AG
NE
FIX
MD
1 of 3
Voltage KV
OperationClosing the Single Phase Circuit Switch Link
Special Notes
Confirm the circuit switch link location and labeling prior to operation.
Special Notes
1. Attach the switch link operating handle onto the switch link as shown.
OperationClosing the Single Phase Circuit Switch Link
2. Insert the switch link carefully in the desired position.3. Push the switch link with a firm and continuous motion to the stop position to close the link.4. Slide up the operating handle and remove from the switch link.5. Repeat this operation for all three (3) phases.
Special Notes
Confirm the circuit switch link location and labeling prior to operation.
Ensure all three (3) phases are opened and removed correctly.
Confirm the circuit switch link location and labeling prior to operation.
Ensure all three (3) phases are closed correctly.
Operation
Opening the Single Phase Circuit Switch Link1. Attach the switch link operating handle to the required switch link as shown.2. Grasp the operating handle and withdraw the switch link in a firm and continuous motion.3. Remove the switch link from the operating handle and stow correctly.4. Repeat this operation for all three (3) phases.5. If required place switch link spout covers onto the switch link spouts as shown.
Caution
Caution
Caution
N/A
C 2
C 2
Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators
1
32
4
1
5
2
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006 Doc Ref: WPHazemeyerMD2
HAZEMEYERMAGNEFIX MD
HA
ZE
ME
YE
R M
AG
NE
FIX
MD
2 of 3
Operation
Closing the Three Phase Circuit Switch Link
Special Notes
Confirm the circuit three phase switch link location and labeling prior to operation.
Engage the switch link three phase operating handle by:
1. Place the operating handle in a vertical position on the ground as shown. Secure in this position by placing the foot through the handle.2. Using both hands, raise the attachment cylinder until a 'click' is heard thereby latching the cylinder mechanism.
Caution
Operation
Closing the Three Phase Circuit Switch LinkSpecial Notes
Confirm the circuit three phase switch link location and labeling prior to operation.
3. Insert the three phase switch carefully into position ready to be closed.4. Attach the operating handle to the three phase switch link with the long tongue on the LH side as shown.5. Unlock the cylinder closing mechanism by depressing the latches as shown.6. Push in the operating handle in a firm and continuous motion to the stop position to close the three phase switch link. Remove the operating handle.
Caution
N/A
B 4
OperationOpening the Three Phase Circuit Switch Link
Special Notes
Confirm the circuit three phase switch link location and labeling prior to operation.
1. Grasp the three phase switch link by the two handles as shown.2. Withdraw the three phase switch link in a firm and continuous motion and stow correctly.3. If required place switch link spout covers onto the switch link spouts.
Caution
B 4
1
4
65
5
1
1
2
2
OperationEarthing the Circuit
Special Notes
Confirm the circuit location and labeling prior to operation.
Confirm the earthing lead is firmly attached to the earthing link.
1. Attach the earthing handle to the earthing link as shown.
Caution
N/A
1
OperationEarthing the Circuit
Special Notes
Confirm the circuit / earth switch location and labeling prior to operation.
Ensure the remote end of the circuit / transformer to be earthed is isolated.
2. Place the earthing link carefully on the relevant circuit spout.3. Grasp the earthing handle above the red limit ring and push the earthing link in to the stop position in a firm and continuous motion to earth the circuit.4. Remove the earthing handle.5. Repeat this operation for all three (3) phases.Note: To remove the circuit earth reverse the above instructions.
Caution
F 2
2
3
Date Issued: 2 March 2006Doc Ref: WPHazemeyerMD3
3 of 3Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
HAZEMEYERMAGNEFIX MDH
AZ
EM
EY
ER
MA
GN
EF
IX M
D
Operation
Access to the HV Fuses
Special Notes
Confirm the transformer fuse circuit location and labeling prior to operation.
1. Confirm the transformer fuse circuit switch links have been removed.2. If required, confirm the transformer fuse circuit is earthed via the earthing links.3. Rotate the HV fuse interlock ACW as shown.
Caution
G 2
OperationAccess to the HV Fuses
Special Notes
Exercise caution when removing HV fuses as they may be hot.
4. Grasp the required HV fuse extraction handle and withdraw the HV fuse.5. Remove the HV fuse from the end cap and replace with a new HV fuse.
Caution
G 24
5
31
1
1
OperationAccess to the HV Fuses
Special Notes
Note: The circuit switch links cannot be replaced unless the HV fuse interlock is in the correct position - rotated CW.
6. Insert the HV fuse into the HV fuse chamber ensuring the end cap seats home correctly.7. Rotate the HV fuse interlock CW to the stop position.
Caution
A 2
6
This page is deliberately left blank.
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006 Doc Ref: WPHazemeyerMD4
HA
ZE
ME
YE
R M
AG
NE
FIX
MD
HAZEMEYERMAGNEFIX MD
Operation Options
Special Notes
Ensure the switchgear is fit for service prior to and after operation.
Note: The transformer fuse switch has a different operating mechanism to the circuit switch.
Caution
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006Doc Ref: WPHolecSVS1
OpeningClosingIsolationRackingSpring Charge
EarthingAuto RecloseHV FusesO/C ProtectionE/F Protection
3322116.6
33022013266
Manufacturer:Model:Rating:
Break Rating:Insulant:
HolecSVS630 Amps630 AmpsSF6
HOLECSVS
HO
LE
C S
VS
1 of 3
Voltage KV
OperationClosing the Circuit Switch
Special Notes
Confirm the circuit switch location and labeling prior to operation.
Special Notes
1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle CW to the stop position to close the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.
OperationOpening the Circuit Switch
1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to open the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.
Confirm the circuit switch location and labeling prior to operation.
Caution
Caution
F 2
F 2
Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators
1
1
2
2
Operation
Closing the Transformer Fuse Switch
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
1. Unlock if required and insert the operating handle into the transformer fuse switch open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to charge the operating spring then CW to the stop position to close the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.
Caution
A 2
1
2
2
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006 Doc Ref: WPHolecSVS2
HOLECSVS
HO
LE
C S
VS
2 of 3
OperationOpening the Transformer Fuse Switch
Special Notes
Confirm the transformer fuse switch location and labeling prior to operation.
1. Press the red 'O' button to open the transformer fuse switch.2. Confirm the mechanical indicator agrees with the transformer fuse switch status.
Caution
A 2
OperationClosing the Earth Switch
Special Notes
Confirm the earth selector switch location and labeling prior to operation.
Ensure the remote end of the circuit / transformer to be earthed is isolated.
1. Confirm the circuit / transformer fuse switch is open.2. Confirm 'Safe to Earth' with the LED indicators if fitted.3. Unlock if required and slide the earth switch interlock lever to the right and:4. Unlock if required and insert the operating handle into the earth switch selector mechanism.5. Rotate the operating handle CW to the stop position to select the earthing option.6. Confirm the mechanical indicator shows earthed.
Caution
F 2
OperationClosing the Earth Switch
Special Notes
Confirm the circuit / earth switch location and labeling prior to operation.
Ensure the remote end of the circuit / transformer to be earthed is isolated.
7. Remove the operating handle from the earth switch selector mechanism and insert into the circuit switch open / close mechanism as shown.8. Rotate the operating handle CW to the stop position to close the circuit switch thereby earthing the circuit.9. Confirm the mechanical indicator agrees with the circuit / earth switch status.
Caution
F 2
1
5
8
3
4
7
2
OperationOpening the Earth Switch
Special Notes
Confirm the circuit / earth switch location and labeling prior to operation.
1. Unlock if required and insert the operating handle into the circuit / earth switch open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to open the circuit switch thereby de-earthing the circuit.3. Remove the operating handle.
Caution
F 2
2
1
OperationOpening the Earth Switch
Special Notes
Confirm the circuit / earth switch location and labeling prior to operation.
4. Unlock if required and slide the earth switch interlock lever to the right and:5. Unlock if required and insert the operating handle into the earth switch selector mechanism.6. Rotate the operating handle ACW to the stop position to de-select the earthing option.7. Confirm the mechanical indicator shows normal circuit.8. Remove the operating handle and lock if required.
Caution
F 2
5
6
Date Issued: 2 March 2006Doc Ref: WPHolecSVS3
3 of 3Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
HOLECSVSH
OL
EC
SV
S
OperationAccess to the HV Fuses
Special Notes
Ensure the HV fuse striker pin is located in the top mounting assembly.
Exercise caution when removing HV fuses as they may be hot.
1. Confirm the transformer fuse switch is closed with the selector switch in the earth position.2. Slide the earth switch interlock across to the right and up.3. Insert the supplied HV fuse access panel latch key and rotate ACW.4. Remove the HV fuse access panel.5. Replace HV fuses as required.
Caution
A 2
2
3
This page is deliberately left blank.
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006 Doc Ref: WPHolecSVS4
HO
LE
C S
VS
HOLECSVS
Operation Options
Special Notes
Ensure the circuit switch is fit for service prior to and after operation.
Note: This switchgear does not have an earthing switch.
Caution
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006Doc Ref: WPLong&CrawfordETV3-21
OpeningClosingIsolationRackingLatching
EarthingAuto RecloseHV FusesO/C ProtectionE/F Protection
3322116.6
33022013266
Manufacturer:Model:Rating:
Break Rating:Insulant:
Long & CrawfordETV3/2200 Amps250 MVAOil
LONG & CRAWFORDETV3/2 L
ON
G &
CR
AW
FO
RD
ET
V3/2
1 of 1
Voltage KV
OperationClosing the Circuit / Transformer Fuse Switch
Special Notes
Confirm the circuit / transformer fuse switch location and labeling prior to operation.
Special Notes
Confirm the circuit / transformer fuse switch location and labeling prior to operation.
1. Unlock if required and raise the operating handle to the stop position to close the switch. Lock if required.2. Confirm the mechanical indicator agrees with the switch status.
OperationOpening the Circuit / Transformer Fuse Switch
1. Unlock if required and lower the operating handle to the stop position to open the switch. Lock if required.2. Confirm the mechanical indicator agrees with the switch status.
Special Notes
Confirm the circuit / transformer fuse switch location and labeling prior to operation.
Ensure the remote end of the fused circuit is isolated prior to accessing the HV fuses.
Operation
Access to the HV Fuses1. Confirm the relevant transformer fuse switch is open.2. Unlock the HV fuse access lid interlock bar and remove.3. Unscrew the two (2) HV fuse access lid retaining wing nuts and lower the retaining bolts.4. Raise the HV fuse access lid to the stop position.
Caution
Caution
Caution
F 3
C 2
F 3
1
1
1
2
33
1
Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Correct Latching
This Page Is Deliberately Left Blank
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006 Doc Ref: WPLong&CrawfordETV3-22
LONG & CRAWFORDETV3/2
LO
NG
& C
RA
WF
OR
D E
TV
3/2
Operation Options
Special Notes
Ensure the ring main isolator is fit for service prior to and after operation.
Note: The transformer fuse switch and earth switch have different operating mechanisms to the circuit switches.
Note: In some cases this switchgear may be fitted with a Western Power Mechanical A ctuator. Refer to the 'WESTERN POWER MECHANICAL ACTUATOR' template in this manual for further details if required.
Caution
Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.
Date Issued: 2 March 2006Doc Ref: WPLong&CrawfordT4GF31
Opening Closing Isolation Racking Spring Charge
Earthing Auto Reclose HV Fuses O/C Protection E/F Protection
33 22 11 6.6
330 220 132 66
Manufacturer:Model:Rating:
Break Rating:Insulant:
Long & Crawford T4GF3 Ring Main Isolator 630 Amps 630 Amps Oil
LONG & CRAWFORDT4GF3 RING MAIN ISOLATOR
LO
NG
& C
RA
WF
OR
D T
4GF
3 RIN
G M
AIN
ISO
LA
TO
R
1 of 3
Voltage KV
Operation Configuring the Ring Main Isolator Operating Handle
Special Notes
The operating handle will 'spin free' if the ratchet cam is not set to the correct position.
Special Notes
1. Determine the required direction of the operating handle rotation - clockwise or anticlockwise. 2. Rotate the operating handle ratchet cam to the required position ,A or B, (as shown). The operating handle will only function in the direction of the ratchet cam.
Operation Closing the Circuit Switch
1. Attach the operating handle to the circuit switch operating mechanism as shown. 2. Rotate the operating handle in the direction of the indicating arrow (adjacent to the operating mechanism) to the stop position to close the switch. 3. Confirm the mechanical indicator agrees with the switch status.
Special Notes
Confirm the circuit switch location and labeling prior to operation. Ensure the operating handle ratchet cam is set to the correct position prior to operating.
Confirm the circuit switch location and labeling prior to operation. Ensure the operating handle ratchet cam is set to the correct position prior to operating.
Operation
Opening the Circuit Switch 1. Attach the operatin