Page 1 of 12
CURRICULUM VITE
PERSONAL INFORMATION
Name: Ragab Atta Ragab
Nationality: Egyptian
Current address: Benha / Emam st. no16
Tel.no :01066010539
E.mail : [email protected]
Date of birth : 08/06/1973
Marital status : Married
Military status : Finished
Education : Zagazig University
B.SC. Sciences (math & computer dep.)
Languages: -Arabic (mother tongue)
-English (good)
SKILLS
1- User for total station (LEICA) LEICA 1100 & LEICA 1800 &
LEICA 1103 & LEICA 1203 & LEICA 1201
2- Quantities survey for excavations & backfilling uses computer
programs
Autodesk Land Desktop program
AutoCAD program
Surfer program
Microsoft windows
Microsoft Office
Page 2 of 12
Experiences
11-2011 ~ Till Now
(Besix-Orascom JV, Egypt)
Project:
El-Ain El sokhna Supercritical power plant
Consultant:
PGESCO
ENGINEERING AND CONSULTANTS (A & A)
Owner:
East Delta Electricity Production Company (EDEPC)
Position : Surveyor
DUTIES:
Prepare site layout & surveying work.
The scope of civil works includes the construction of 3 pipelines
totaling a length of approximately 5.1 km
Prepare shop drawing.
Controlling execution of work:
(Formwork, excavations, and backfilling) Make a surveying in each area.
Issue inspection and test plan.
Helping the site team and in preparing work procedure and
method statement.
Page 3 of 12
11-2010 ~ 11-2011:
(ARCHIRODON for Construction (Overseas) Co. S.A)
Project : Damietta cycle power plant 500mw.
Consultant: Power Generation Engineering and Services Company
PGESCo
Owner:
East Delta Electricity Production Company (EDEPC)
4 Gas Turbine (500 MW).
Piles .
Civil .
Infra Structure.
Position : Survey Senior
DUTIES:
Prepare site layout & surveying work.
Prepare shop drawing.
Controlling execution of work:
(Formwork, excavations, and backfilling) Make a surveying in each area.
Issue inspection and test plan.
Helping the site team and in preparing work procedure and
method statement.
Page 4 of 12
05-2010 ~ 11-2010:
(ARCHIRODON for Construction (Overseas) Co. S.A)
Project:
El-Ain El sokhna Supercritical power plant
(Piling works)
Consultant:
PGESCO
ENGINEERING AND CONSULTANTS (A & A)
Owner:
East Delta Electricity Production Company (EDEPC)
Position : Survey Senior
DUTIES:
Prepare site layout & surveying work.
Prepare shop drawing.
Controlling execution of work:
(Formwork, excavations, and backfilling) Make a surveying in each area.
Issue inspection and test plan.
Helping the site team and in preparing work procedure and
method statement.
Page 5 of 12
05-2009 ~ 04-2010 : El- Nasr Building & Construction Company " EGYCO " Project:
( المنيا –بنً سىيف )مشروع ابنً بيتك
Consultant:
مكتب الدكتىر السعداوي لالستشاراث الهندسيت
Owner:
( المنيا الجديده –بنً سىيف )جهاز تنميت
Project description:
انشاء محطة رفع
كيلومتز فى ارض صخزيو 5 كيلو متز الى 1 طزيق باطوال مختلفو من 46انشاء
(صزف صحى والتغذية بالمياه )انشاء البنية الداخلية
Position : Survey Senior
DUTIES:
Prepare site layout & surveying work.
Prepare shop drawing.
Controlling execution of work:
(Formwork, excavations, and backfilling) Make a surveying in each area.
Issue inspection and test plan.
Helping the site team and in preparing work procedure and
method statement.
Page 6 of 12
09-2007 ~ 03-2009 :
(ARCHIRODON for Construction (Overseas) Co.S.A)
(Archirodon Arab Contractor- JV)
Project:
New container terminal and Quay wall Damietta port Egypt
Consultant:
HPC Hamburg Port Consulting
SELLHORN INGENIEURGESELLSCHAFT
Owner:
Damietta international ports S.A.E.
Project description:
Quay wall for 1400m length with 38m height
Container terminal area (280000 m2)
Administration and amenities buildings and utilities
Position : Survey Senior
DUTIES:
Prepare site layout & surveying work.
Prepare shop drawing.
Controlling execution of work:
(Formwork, excavations, and backfilling) Make a surveying in each area.
Issue inspection and test plan.
Helping the site team and in preparing work procedure and
method statement.
Page 7 of 12
04-2005~ 05-2007:
شركت المشروعاث الصناعيت والهندسيو
Project:
Constructing of village at (Sahl-Eltena)
Consultant:
Development of Sinai instrument
Owner:
Ministry of irrigation
Project description:
Constructing village on 240,000 m2 includes 350 cabins
Constructing a main building for its village
Constructing its services (roads & pipe lines & elevated tank…etc.)
Position : Surveyor
DUTIES:
Prepare site layout & surveying work.
Prepare shop drawing.
Controlling execution of work:
(Formwork, excavations, and backfilling) Make a
surveying in each area.
Controlling assembling of pipelines and its joints.
Issue inspection and tests of pipelines and elevated tank.
Helping the site team and supervisor in preparing work
procedure and method statement.
Make a restrict and invoice with main contractor and
subcontractor.
Page 8 of 12
01-2004 ~ 02-2005:
(El salam-Misr for trading and contracting)
Project:
Livestock terminal handing facility & infra structure
Consultant:
Sabbour for consultants
Owner:
Sokhna port development co. (SPDC)
Project description:
Live stock terminal area (206080 m2)
.
Two roads (walk way & paving road).
Cover areas by steel structure.
Make water trough and footer trough for live stock terminal.
Position : Survey Senior
DUTIES:
Make leveling for area for live stock terminal
Issue inspection for leveling and compaction test.
Maintain document register in connection with quality records.
Make leveling for two roads (walk way & paving road).
Helping the site team in preparing work procedure and method
statement.
Make a restrict and invoice with main contractor and
subcontractor.
Page 9 of 12
01-2002 ~ 12-2003:
(ARCHIRODON for Construction (Overseas) Co. S.A)
Project:
Port Said East Container Terminal
Consultant:
Posford Duvivier Haskoning, Pacer, U.K
Owner:
Suez Canal Container Terminal S.A.E
Project description:
Container terminal area (400000 m2)
Administration and amenities buildings
Concrete paving blocks (360000 m2)
Sand cement under concrete paving block.
Position : Survey Senior
DUTIES:
Prepare site layout & surveying work.
Prepare shop drawing.
Controlling execution of work:
(Form work, excavations, backfilling Make a surveying in each area.
Issue inspection and test plan.
Helping the site team and in preparing work procedure and
method statement.
Make a restrict and invoice with main contractor and
subcontractor.
Page 10 of 12
10-2000 ~ 12-2001:
(شركت القنطره للبترول)
Project:
Preparing the sites and its roads of drilling for natural gas
Owner:
القنطزه للبتزول
Project description:
Yard of drilling of ten sites (180000 m2)
Roads service for this yards (50.0 km)
Backfilling of coarse aggregate with thick (40 cm)
Pipe lines services.
Position : Surveyor
DUTIES:
Prepare site layout & surveying work.
Make site leveling of areas and backfilling of it by coarse
aggregate to prepare it for drilling.
Make a surveying in each area and roads.
Issue inspection and surveying check.
Helping the site team in preparing work procedure and method
statement.
Make a restrict and invoice with main contractor and
subcontractor.
Page 11 of 12
05-1999~09-2000:
(ً ( الشركو العامت لألستصالح األراض
Project:
Intakes 3&5&7 in El-Salam Canal
Consultant:
Development of Sinai instrument
Owner:
Ministry of Irrigation
Project description:
3 pump stations
Main Pipes lines & sub main Pipes lines for El-Salam canal
Roads and excavations& backfilling work’s
Position : Surveyor
DUTIES:
Prepare shop drawing.
Controlling execution of work:
(Form work, excavations, backfilling)
Controlling assembling of pipelines and its joints.
Issue inspection and tests of pipelines and elevated tank.
Supervising for roads (cut & fill) and pipe lines connected with
intakes.
Make coarse agg. For roads with thick. (30.0 cm)
Page 12 of 12
02-1998~04-1999:
شركت مصر الجديدة لألسكان والتعمير
Project:
Group of resident building
Owner:
شركت مصر الجديدة لألسكان والتعمير
Project description:
Group of resident building
Infrastructure of resident building
Make a landscape of resident building
Position : Surveyor
DUTIES:
Prepare site layout & surveying work.
Controlling execution of work:
(Form wok, excavations, backfilling)
Supervising of group of resident building.
Supervising of Road service of its group and green area with
parking.
Helping the site team in preparing work procedure and method
statement.
Make invoice with main contractor.