Thomas Wegmann, Thomas Keilig
Deutsches SOFIA InstitutUniversity of Stuttgart
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
DSI Personnel in California
N.N. soon Deputy Director AmesJ. Wolf 01.11.04 Senior Scientist - DSI Representative AmesA. Reinacher 01.11.04 Engineer (Chopper) PalmdaleT. Keilig 01.04.05 Project Management PalmdaleM. Lentini 01.05.05 TA Mechanical Technician Palmdale M. Burgdorf 06.04.09 Scientist, German Instruments Ames U. Lampater 15.05.05 Engineer (TA Structure, Controls) Palmdale S. Schmid 01.08.05 Aeroacoustics / Aerodynamics Palmdale/StuttgartC. Engfer 09.11.09 Aeroacoustics / Aerodynamics PalmdaleK. Bosse 01.04.07 Senior Electrical Engineer Palmdale H. Jakob 01.04.07 Software Engineer / TA controls PalmdaleS. Beckmann 01.08.07 TA Electrical Technician PalmdaleR. Strecker 01.06.09 TA Technician, QA PalmdaleJ. Trendelkamp 01.08.09 TA Mechanical Technician PalmdaleS. Teufel 01.02.08 Engineer (Struc. Dynam., End-to-end sim.) PalmdaleN. Hanisch 28.01.08 Technician, Documentation, Logistics Stuttgart/Palmdale
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
DSI Personnel in Stuttgart
Th. Wegmann 18.07.05 Managing Director DSI StuttgartN. Lampa 01.08.05 Assistant of the Management StuttgartD. Mehlert 16.01.06 EPO Program StuttgartC. Scorza de Appl 01.09.07 EPO Program StuttgartA. Krabbe 08.01.09 Professor Airborne Astronomy, Physics StuttgartJ. Wagner 01.04.09 Technical Director, Prof. Struc. Dynam. Stuttgart B. Klett 01.07.09 Secretary StuttgartN.N. soon Senior Scientist Stuttgart
E. Pfüller Fall 09 PhD Student, USRA AmesM. Wiedemann Fall 09 PhD Student, USRA Ames
Academic Exchange Program
DAOF Ames
Diplom stud. 2 3
Interns 4 110 Diplom Students & Internships
as of 15.02.10
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
DSI DirectorA. Krabbe
Techn. Managing DirectorJ. Wagner
Managment AssistantN. Lampa
Admin. Managing DirectorT. Wegmann
SecretaryB. Klett
SOFIA Deputy DirectorTBD
ScienceJ. Wolf et al.
EngineeringT. Keilig
Structures & SystemsU. Lampater et al.
Electronics & SoftwareH. Jakob et al.
Quality AssuranceR. Strecker et al.
AerodynamicsS. Schmid
OpticsM. Burgdorf et al.
Document. & LogisticsN. Hanisch
Science CommunityN.N. et al.
EPOD. Mehlert et al.
USRA
DSI Structure
USRA/NASAPersonnel
University StuttgartIRS
Stuttgart
Palmdale
Mountain View
DLRA. Himmes et al.
NASASPO
DSI Partners
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
Current & Past Major DSI Activities
Presentation
Thomas Keilig
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
Current & Past Major DSI Activities cont’d
US/D cross-cultural Integrated DAOF TA-Team Workshop 2 day event in Monterey 26 participants was held on Tuesday – Wednesday, Feb. 16 – 17.
German Science Community Outreach Christof Iserlohe left the DSI N.N. POC for German observers Installation of the German observing time application and evaluation process Installation of science community relevant websites
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
Documentation/Maintenance/Logistics
Goal: Minimizing the downtime after failure of a telescope component
(N. Hanisch)
Status:
the Maintenance Module should be ready in March
- visit of NASA at erpwerk for reviewing the module
The storage module is operational at DAOF
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
Current & Past Major DSI Activities cont’d
Second Gyro System for the SOFIA Telescope
Two Options were presented on the last SSSC-Meeting
- Exchange of the gyro box
- parallel system ( hot standby)
It was decided to follow the first option: exchange of the gyro box
A set of fiber optical gyros (FOG 200) are under procurement from IXSEA
The performance of these FOG200 gyros are equal or better the those of the FOG 180 gyros currently used.
Further activiy: a modified gyrobox must be designed and built
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
Current & Past Major DSI Activities cont’d
Further spare parts in procurement
Power Control Panel for the SOFIA PDU as Line Replaceable Unit (LRU)
Spare Camera Controller as Line Replaceable Unit (LRU)
Coarse Drive (CD-Serv) Unit
Balancing Drive (BD-Serv) Unit
Local Control Board / hand Held Panel (LCP / HHP)
Power Unit A2 (PUA2) and B (PUB) and C (PUC)
and others
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
SOFIA Imager Upgrade
Replace current camera heads with Thompson CCD sensors of WFI, FFI and FPI by new camera heads with e2v CCD47-20 sensors
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
SOFIA Imager Upgrade
New CCD47-20 sensors (flight hardware) have been purchased including thermo-electrical cooler packages
CCD47-20 sensors has been characterized in lab and on-sky measurements with test camera (Finger Lakes Instrumentation)
Prototype camera head (FPI) is currently built by KT/SST - Final optimization of mechanical/thermal design - Electronics is under development - Functional demonstration test (bench) planned for late March 2010 - Delivery of prototype planned for ~ June 2010 - subsequent tests by DSI at Ames (lab and on-sky with simulation optics for WFI, FFI & FPI)
Start of flight hardware phase expected ~ fall 2010
Software update for imager commanding, tracker system, MCCS in parallel (new: sub-frame readout, on-chip binning)
Plan to be ready to implement upgraded WFI, FFI & FPI in summer 2011 during segment 3 downtimes
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
• SOFIA Fast Diagnostic Camera
•Replace FPI with a fast EM-CCD Camera for engineering flights to optically analyze the TA pointing stability (independent of HIPO or FORCAST), i.e. monitor star centroid location in focal plane with up to ~ 400 frames / sec
• ANDOR iXonEM DU-888 (BI) camera purchased and characterized (lab and on-sky, DSI telescope & Lick Observatory)
• Mounting plate for FPI flange built by KT
• First test at TA during line ops in September 2009
- Mechanical and optical interfaces: alignment OK, focussing OK
- Photometric sensitivity was measured: FDC ~ 3 x more sensitive than FPI, limited by DAOF sky background (EM gain not usable)
- High frame rates tested: optical analysis of SM-chopper with 249 & 295 frames/sec, fine drive system analysis with up to 400 frames/sec, extra-focal star images to characterize atmosphere (seeing)
• Currently flight configuration of FDC is prepared for a first flight in summer 2010 (TA Characterization Flight #2):
• - Control computer in ATR box to replace FPI controller on TA, optical link to user station, cable routing at TA - simultaneous data acquisition with FORCAST using FORCAST trigger puls - addition of GPS time stamps
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
•Telescope Assembly Characterization and First Light (TACFL)
•The main aim is to determine the pointing stability of the TA, which is probably the most crucial single issue for airborne observatories. It is also intended to use this opportunity for producing a first light image.
• A working group, led by DSI Ames personnel and with the collaboration of USRA, was brought into being on 1/21 with the task of writing a test plan and a more detailed list of procedures for this flight.
• A version of the test plan that is complete but not final yet was circulated on 2/5.
• The flight is expected to happen in mid-April and to fulfill the following tasks:
- Inertial stability evaluation from observations of point sources with and without FFI and FPI tracking - Tuning of the Quasi-static Flexible Body Compensation and try-out of WFI tracking - Various cavity environment tests - Getting first light images with FORCAST
• Several of the tests under the previous bullet will be carried out with FORCAST:
• - Test targets must be bright enough for both FORCAST in fast read-out mode and the images to see - Coordination with the FORCAST team needed w.r.t. Preceding mini line-ops, parallel activities during the flight etc. - The first light targets will be extended sources that make beautiful pictures
•Planning of the activities with the telescope during the first flight characterization flight
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
EPO Activities @ DSI duringthe International Year of Astronomy 2009 (IYA)
More than > 30 nation wide EPO activities e.g.:
- January 20: > National opening event in Berlin- February 12: > State of Baden-Württemberg (BW) opening event in Mannheim- March 20: > Ceremonial act of the Kepler society- March 16: > Open SOFIA exhibition in the Planetarium Stuttgart- May/Juli: > presenting SOFIA with hand-on experiments in
Weil der Stadt during exhibition of Kepler Society- July 16 - 18: > „Kepler days“ at State Observatory in Heidelberg (BW)- August: > presenting DSI IR Astro Kit @ IAU meeting in Sao Paulo - September: > Annual „Highlights of Physics“ by German physical society
2009 in Cologne on astronomy> Conference of the German „Astronomical Society“ in Potsdam> exhibition on „Science day“ at leisure ground in Rust
- Oktober: > Exhibition on international book fair in Frankfurt
>> Much more (touring exhibition, talks, presentations with hand-on experiments) in cooperation with several partners)
>> Triggered a lot of activities that will continue 2010 an beyond e.g.incooperation of SOFIA exhibit in the „wandering“ exhibut „Augen im All“ by ESA in IR Astronomy & Herschel and Planck satellites
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
Prepare for PO activities on SOFIA milestones during 2010+
- NASA/DLR press release on:> first light
> short science (as fixed in data right use agreement) – 1x FORCAST - First science with SOFIA at all plus
FORCAST results- lead by NASA/FORCAST team - as soon as data available; lastest 1- 2 weeks after short science with FORCAST
– 1x GREAT - First German science with SOFIA plus GREAT results- lead by DLR/GREAT- as soon as data available; lastest 1- 2 weeks after short science with GREAT
>> Prepare background material (images, videos, podcasts, animations on short science targets and goals
>> Continue the PR telecon (NASA-HQ,DFRC,ARC,DLR, USRA, DSI)
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
Cornerstone Ceremony 13. Oktober 2009Completion May 2011
Baden-Württemberg State Aerospace Center
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
FIFI-LS
Technical Status: - will be presented at the SITR- red channel ready for demonstration flights after Basic Science- blue channel in the works
Issue:- MPE announced to terminate its engagement in FIFI-LS- Cannot be accomodated for at UC Berkeley
- Transition to new place by fall 2010
Solution:- Goal: Make it a full facility instrument - DSI/IRS is interested to continue the FIFI-LS project Ongoing discussions with MPE, DLR, German Community and DSI/IRS
Status:- High quality instrument- High scientific potential- EOOP Status- We want to keep FIFI-LS for SOFIA
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
Missing major items:- Final testing of blue grating drive (W. Raab) - blue grating drive electronics / controller (F. Fumi)- blue warm detector electronics (F. Fumi)- blue airworthy warm cables (F. Fumi)- final assembly of support structure (N. Geis)- Final assembly of optical guide camera housing & mechanics (N. Geis)- Airworthiness electronics docs (F. Fumi)- Instrument software completion (R. Klein)- Instrument software documentation (R. Klein)- Assembly of instrument mounting cart (Raab/Geis)
MPE Team:- A. Poglitsch busy with PACS- F. Fumi (Electronics Eng.) retiring end of Feb 2010- N. Geis funded by DLR till 2011- W. Raab funded by DLR till 2011- R. Hönle Free Lancer
FIFI-LS
Other FIFI-LS Team members:- Randolf Klein (co-I, Project Scientist, Software lead, PI for EOOP), UC Berkeley, funded by USRA and 3rd party - Kaori Niskikida (Software development), UC Berkeley funded by USRA- Leslie Looney (co-I, advisor, documentation), UIUC
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
Next steps:- Keep existing team together and at work- Complete FIFI-LS as much as possible at MPE- Bring in additional people from DSI & SMO- Find (additional) funds at Uni Stuttgart, DLR, SMO and NASA- Prepare a new lab at DSI, Stuttgart for fall 2010- Identify show-stoppers (elevator, LHe transfer, crane) - Prepare for know-how transfer
FIFI-LS
Possible lab area for FIFI-LS in Stuttgart
18. Feb. 2010 SSSC Th. Wegmann
Str
ato
sph
eric
Ob
serv
ato
ry f
or
Infr
ared
Ast
ron
om
y Deutsches SOFIA Institut
Open points:
- Support by USRA / SMO / NASA to transition FIFI-LS as Facility Instrument
- Use of FIFI-LS as PI-instrument before transitioning to SMO as Facility Instrument
- Will FIFI-LS be ready for the anticipated demo-flights after Basic Science?
- Will only the red channel or both channels be ready?
-
-
-