STAGEnet 2006 Video Pre-Migration & Test Plan

BackboneRouter

Switch

ATM

InternetRouter

Switch

Edge Rtr

UBR VBR

Switch

VideoRouter

VideoBackbone

MCU Segment(s)

Switch

Use a VLAN crossover cable for VLAN access from the data backbone routers to the MCU VLAN’s. (Shortest Path)

Bundled ATM T1

Test Locations

DCN ATM Test T1 (Local T1 Test, Non-Production)Dickinson DOT ATM T1 (Production T1 Test)Fargo DOT Metro Ethernet (Metro Fiber Test)

Pre-Migration Phase (April-June)Perform all test at locations noted aboveMigrate all Non-K12 locations to their respective data router

Create sub-interface for access to Video Router’s MCU VLAN Segment. Route. Static route to 10.233.0.0.

IBM

Configure QoS along all paths as supported by hardware and software.

This represents the State, PSD, LIB/HAN, and HECN switch(s). HECN is for Tribes and UoM.

End site configurations will need ACL moved to video outbound interface:(example)Permit 10.233 anyPermit any 10.233 H.323Deny all…

Recommended