    It is important for managers to realize that how they run items using

    inventory control logic relates directly to the fin. Perf. of the firm.

    Price-break models deal with the fact that, generally, the selling price of an

    item varies with the order size.(EOQ) Q = Sqt of 2*D*S / I *CAggregate value of inventory = (order quantity/2+safety stock)* cost perunit

    Compute weeks of inventory

    Units held / units used each week

    If a company has 50 units and they use 10 units a week, they

    have 5 weeks worth of inventory

    K = expected demand during lead time + safety stock / size of container or

    DL(1 + S)/ CK= # of Kanban card sets D = avg. # of units demanded per period L = lead

    time to replenish order S = safety stock as a % of demand during the lead

    time C = container size

    TCO= acquisition costpurchase planning cos.quality cos/tax/purch

    p/fin.cost + ownership costenergy

    co/maintaince&repair/fin/suplychain/suply netw +post-ownership

    costsdisposal environmental co/warranty cost/product

    liability/customer dissatistification cos ts.

    Flexible resources-study op&imp. Operation/general purpos machine

    Total people inv.labor is to clos to action/rethink perf measurr/resp at so

    Visibility- posted schd/strict lim in inve/layout/communicat/charts,logs

    Preautomation-attain results without exp/system analys/elem. Wst pross

    Cellular layouts-group dissmilar machines in manufac/workflow 1

    dir/cycle time adj by workers path

    Pull production system-

    Kanban production control-Kanban card indicates stand quantity of

    prod/Derived from two-bin inv. Sys/ Kanban maintains discipline of pull

    prod/Prod. kanban authorizes production.

    Withdrawal kanban authorizes movement of goods

    Small-lot production-Req. < space and cap./Move proc. Closser/quality

    problems easy to detect.Quick setupsSMED System-separate int setup from ext setp/convert

    int stp to extern stp/steam line all the aspect of stp/ perf stp activit parall

    OED/IED/SMED/OTED

    Uniform production-PROD. Littl bit of evrthing. Daily/smotth production/

    Quality at the sourc-jidoka/andon/pokayoka/visual control makes prob vi

    Total prodctiv maintc-braikdown maint/ prevent maint

    Sole sourcing

    Continuous improvement./Requires total employment

    involvement/Essence of JIT is willingness of workers to: Kaizen Spot quality problems/Halt production when necessary

    Generate ideas for improvemen/Analyze problems

    Perform different functions

    Constraints-dont ship more than you have/ you cant have negat cost.

    No lower than 0/needs to be= to amount demanded