Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interim
• Interactions with users & B2B communications
• Next Steps
• Contacts2
Introduction
• In order to overcome the constraints and technological obsolescence of the application
currently being used (CAMINUS/AltraWEB), as well as direct the management and the
support for the development of new commercial processes resulting from national and
European regulations, Snam Rete Gas has started a specific project to create a new
information system dedicated to the commercial area
• The initiative was launched in November 2012 with the establishment of a transversal work
group dedicated to directing the various requirements to all the internal and/or external
processes involved
3
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interactions with users & B2B communications
• Interim
• Next Steps
• Contacts4
Scope
5
• New application for the management of the Gas Logistics area to cover the planning process of the transportation, allocation and gas statement.
Planning and Programming of the transportation service
As an example:
• Annual Planning• Half Year Planning• Monthly Planning• Weekly Planning• Planning at 30 days• Planning Authority• Daily Planning (Nomination)• Intraday Planning (Re-
Nomination)• Management of products of
trading capacity• Balancing session
Calculation of the quantities of gas to be allocated to the
users of the transportation
As an example:
• Provisional Allocation and Statement
• Final Allocation and Statement
• Adjustment session• Default service• Temporary Supplier
Contracting of the transportation capacity on National and Regional network. Verification and management access services
Dispatching and physical management of the transportation network; measurement of the volumes and the quality of the gas
Invoicing of the transportation capacity, the commodity, considerations for disequilibrium, other considerations
Capacity Contracts Planning Dispatching &
MeasurementBalancing Invoicing
Related processes
NOT Related processes
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interim
• Interactions with users & B2B communications
• Next Steps
• Contacts6
The application solution (1/3)
• The decision-making process relative to the application solution to be created has gone through:
• a software selection of the solutions available on the market
• a verification of the functional coverage offered relative to the distinctive features of the Italian
market
• a verification of the constraints imposed by the various packages
• a comparison with the implementation choices made by other European Transporters, who
have turned to custom applications to meet their needs
• The new application solution identified anticipates the realisation of a custom application based
on the latest technologies.
7
The application solution (2/3)
8
Portale Capacità
Bacheca Capacità
PSV
Bacheca PSV
Portale Mercato
Portale OBS
M- gas
Portale Fatture
Portale GPIT
Portale A/D PdR
The application solution (3/3)
9
«SNAM Applications in use»
«WEB Applications in use»
Under construction
NLG
The application solution: conceptual model
10
Planning
Daily and Intraday Planning
Allocation & Statement of Provisional Transportation
Allocation & Statement of Final Transportation
Adjustment Sessions
Protocols X12 /
Edig@s …
USER INTERFACE
Integration other systems
PSV /Portal M
M-Gas Portal OBS SampeiCapacity
PortalPortal GPIT
Portal SRG
Shipper / Foreign Transportation Companies
SRG Shipper National &Foreign
TransportationCompanies
Balancing Trader
Storage and Regasification
Companies
GME Op. Extra
Business
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interim
• Interactions with users & B2B communications
• Next Steps
• Contacts11
Features of the new platform (1/2)
• High reliability in the continuity of the service guaranteed by adopting the latest generation technologies
• Reduction in the processing times and guarantee of their stability
• Easier to adopt new functional and/or regulatory changes through application modularity and configuration / parameterisation tools
• Preparation to support various communication protocols (Edig@s)
• Optimisation and expansion of the integration capacities and degree of accessibility of the system both in the internal SRG context and externally with third parties
• Exceeding the technological limits imposed by the current system (increase in performance, greater compliance and flexibility of adjustment relative to the regulations, the standards of ICT security....)
12
Features of the new platform (2/2)
• Improvement in the operating methods for all the Users of the Transportation Service (Users of the Balancing, Storage Companies, Regasification Companies, Foreign and National Transportation Companies, Balancing Traders...)
• Complete management of the versioning and tracking of the data
• Availability of the business data on the new system going back 5 years, which can be viewed in a single environment of reference
• Introduction of the Multi-Language option (Italian and English)
• Availability of integrated Help Online & Manuals features
13
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interim
• Interactions with users & B2B communications
• Next Steps
• Contacts14
Release strategy
15
• 4 subsequent releases according to a "by process" organization
Daily Nomination/Re-Nomination(Release 1)
Post Launch Support
Allocation and Provisional Statement(Release 2)
PlanningAllocation and Final Statement
(Release 3)
Adjustment session/Intraday Allocation
(Release 4)
Agenda
16
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interim
• Interactions with users & B2B communications
• Next Steps
• Contacts
Functionality: Access
• Explorer 11 certified application
• Guarantee compatibily with the main Browser (Firefox , Chrome)
• Access mode as is: one point access with unique authentication by Single Sign On (SSO) of Snam
17
Illustrative
Functionality (2/4)
19
• Filters: every upper part of the screens has filters that can be used by the dedicated function
Functionality (3/4)
20
• The user can select the language (Italian or English).
• After the selection every screen will be translated
Illus
trat
ive
Functionality (4/4)
21
• Every internal User can refer to on line Manual in Italian or English
• Also the Users of the Transportation Service (Users of the Balancing, Storage Companies…) can refer to dedicated On Line Manual (in Italian or English)
Agenda
22
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interactions with users & B2B communications
• Next Steps
• Contacts
Functions for the single Release
• With reference to the strategy for subsequent Releases according to a "by process" organization,
following are the particulars of the functions/features anticipated for each release
23
Release 1 Release 2 Release 3 Release 4
• Allocation & Provisional Statement
• Allocation & Final Statement
• Short, medium and long term planning
• Adjustment Session• Edig@s• kWh• Intraday Allocation• Matching
• Daily Planning• Intraday Planning
Release 1: Nominations
24
Principal Features in Release 1
• User Profiling (access to features and rights to
relevant data)
• Identification Base
• Management Nomination Cycles
• Supporting reports
Release 1 Release 2 Release 3 Release 4
Principal innovations introduced compared to AS IS
Master data harmonization
Intraday Renomination
Detail Nominations Shipper Pair
o Required EIC code Communications relative to the Nomination through
Protocol X12/GISB:o Nomination on RN for the Intraday Cycle pertaining to the
Balancing Session G+1 (by 5:00 p.m. on the Gas G day)o Intraday renomination on all the points of the RNo Capacity check on the import/export points at the same
time as the receipt of the NominationEnter Nominations through file upload More information to support the Nomination processes
Release 1 : Nominations – Receiving nomination
25
• The function ‘Receive Nominations' makes it possible for every authorized outside user to enter and change the nomination data relative to the meters on National Network RN and on Regional Network (NOR, NOC, etc.) for their own area of responsibility, in compliance with the deadlines set in the system for the receipt of the nominations.
Illustrative
Illustrative
27
• Every authorized outside user, through this feature, can display the nominations for which they are responsible in the Collection Areas and on the National Network, including the nominations at the import points, national production, interconnections with regasification and storage plants and at the export points.
Illustrative
Illustrative
Release 1 : Nominations - Displaying nomination
• The function 'Display Nomination', supporting the nomination process, displays with daily details and schedule the nominations, entered in the NLG system by the users of the transportation service.
Release 1: Nominations – Details: nominations status
28
Nominations Status
Description
ACQ Acquired Nomination (from GUI and/or File, x12) ACT Acquired and cut nomination for initial control in relation to the available capacity (related
to cycle 1 and 2 of the day G-1)TCU Cut nomination for reduction of the exploitable capacity (in relation to intraday
nomination)TIN Incomplete nomination (from x12)TIT Incomplete and cut nomination (da x12)TCF Cut nomination for counterflowTVC Cut nomination after the cut for capacity change (related to cycle 1 and 2 of the day G-1)TGL Cut nomination, under capacity control MAT Matched nominationCNF Confirmed nominationANN Delated nomination
Day: 01/10/2012 Nomination Cycle C1 Unit of measure GJ
RN 296.185,0 296.185,0 0,0NOC 1.121.862,0 1.001.865,0 119997,0NOR 205.028,5 205.028,5 0,0SOC 202.594,9 202.594,9 0,0SOC 268.511,5 268.509,5 2,0MER 110.060,6 110.060,6 0,0
NOMINATION AT THE INTERCONNECTION POINT RN-RR
Area of CollectionNomination at
Entry pointNomination at exit
pointUser Name Difference
Release 1: Nominations – Report
29
• Aggregation and comparison reports:
IllustrativeUSER NOMINATION
31/10/2012 Cycle C1
User NameUnit of measure GJ
RN 34640200 465,0NOC 30000301 65,8NOR 30333001 221,4SOC 34657100 864,5SOC 34845701 9,4MER 50059001 42,4CEN 33122501 115,7
Area of Collection Meter Nominated
Illustrative
Release 2: Provisional Allocation & Statement
30
Release 1 Release 2 Release 3 Release 4
Principal Features in Release 2
• Provisional Allocation
• Provisional Statement
• Supporting reports
Principal innovations introduced compared to AS IS
Adjustment of the Reporting of the SCADA files of
Provisional Allocation
Adjustment of the SNP Reporting (Nomination
Statistics Collected)
Use of easier formats for reporting and integration of
the information supplied
Denominazione Utente Giorno Gas Versione
Area Log
Crea ed Esporta File Scada
Release 2: Provisional Allocation & Statement - File SCADA
31
• Below is the Provisional SCADA Report File template to display the data of the Provisional Allocation for
every Meter for the Gas Day, User of the Transportation, Publication Version of the Provisional Statement:
Release 2: Provisional Allocation & Statement - SNP Report File Template (1/3)
32
• Below is the SNP Report template to display Provisional Nominations and Allocations by User of the
Balancing and by single Area of Collection:
- The Nomination - Collection values are expressed in GJ
Component Total Single Pool Total MP Single Pool Total MNP Not Shared Shared Not Measured Daily Measured DailyCollected 47194,5 31406,3 13606,9 45013,2 0,0 2181,3 2181,3 20000 27194,5 2000 45194,5Nominated 42528,2 15056,0 24155,2 39211,2 0,0 3317,0 3317,0 30000 12528,2 3000 39528,2Meters 737 468 221 689 0 48 48 323 414 102 635
Component Total Single Pool Total MP Single Pool Total MNP Not Shared Shared Not Measured Daily Measured Daily
Collected 47194,5 31406,3 13606,9 45013,2 0,0 2181,3 2181,3 20000 27194,5 2000 45194,5Nominated 42528,2 15056,0 24155,2 39211,2 0,0 3317,0 3317,0 30000 12528,2 3000 39528,2Meters 737 468 221 689 0 48 48 323 414 102 635
Log Area
Nomination Statistics Collected for the user "Company Name of the User of the Balancing" information relative to the day 22/ 09/ 2013 - Version 1
Export Meters report (.xls)Export data displayed
Measurement Received Measurement Not Received
Export Meters report (.txt)
BackExport Meters report with Details (.xls) Export Meters report with Details (.txt)
Area of National CollectionMeasurement Received Measurement Not Received
CEN Area of Collection
Illustrative
Release 2: Provisional Allocation & Statement - SNP Report File (2/3)
33
• Below is the SNP Report template to display Provisional Nominations and Allocations by User of the
Balancing with details of the Meters for Area of Collection selected:
- The Nomination - Collection values are expressed in GJ- The Limit value is expressed n GJ
which contains 3000 Search Clean
Type Limit Rank Level
NOC 34606600 39211,2 204,6 Yes 2 MG Received Rank 35,5 1
NOC 30009401 39211,2 232 No MG Not Received
NOC 34203000 39211,2 232 Yes 33 NMG Not Received
Log Area
Export Report (.txt)
Export Report (.xls) Export Meters report with Details (.xls)
Back
Shared
Export Meters report with Details (.txt)
Nomination Statistics Collected for the user "Company Name of the User of the Balancing"information relative to the day 22/ 09/ 2013 - Version 1
Search the meter
Adjust AllocationMeasurement Type
Measurement Status
Area of Collection
Meter Nominated Collected No. Users
Illustrative
Release 2: Provisional Allocation & Statement - SNP Report File (3/3)
34
• Below is the SNP Report template to display the Nomination, Collection and Measurement/Estimate by
Physical Meter and Pool of the Collection Area selected:
- The value of Energy is expressed in GJ; Volume in Sm3; PCS in MJ/Sm3- The Nomination - Collection values are expressed in GJ- The Limit value is expressed n GJ
Energy Volume PCS Type Limit Rank LevelNOC 30347901 30347901 39211,2 45013,2 204,6 5276 38,779 No MG Not ReceivedNOC 30347902 30347902 39211,2 45013,2 204,6 5276 38,779 Yes 2 MG Not Received Percent 35,55
Log Area
Detail Meter for the user "Company Name of the User of the Balancing"information relative to the day 22/ 09/ 2013 - Version 1
Area of Collection
Export data displayed Close
Shared No. UsersAdjust Allocation
Aggregate Meter Nominated CollectedMeasurement/Estimate Measurement
StatusMeasurement
Type
- The value of Energy is expressed in GJ; Volume in Sm3; PCS in MJ/Sm3- The Nomination - Collection values are expressed in GJ- The Limit value is expressed n GJ
Energy Volume PCS Type Limit Rank LevelNOC 34606600 34606600 39211,2 45013,2 204,6 5276 38,779 Yes 2 MG Not Received Prorata ConsistentNOC 34606600 34606601 175,1 4530 38,649 MG Not ReceivedNOC 34606600 34606602 29,5 746 39,513 MG Received
Log Area
Export data displayed Close
Aggregate Nominated CollectedMeter
information relative to the day 22/ 09/ 2013 - Version 1Detail Meter for the user "Company Name of the User of the Balancing"
Adjust AllocationNo. UsersShared
Measurement/EstimateArea of Collection
Measurement Status
Measurement Type
Illustrative
Illustrative
Release 2: Provisional Allocation & Statement – Appropriate capacity Report
35
• The "Appropriate Capacity" report provides evidence of the capacity used in the provisional allocation
(appropriate capacity - adequate capacity - booked capacity) for the meter selected and for the period of
interest
Illustrative
Release 2: Provisional Allocation & Balancing - Allocation by Collection Area (1/2)
36
• Below is the template of the Collection Area Allocation report to display the provisional allocation of the
meter selected and of the relative period of interest:
Unit of measure: Nomination GJ; Allocation GJ; Volume Sm3; PCS MJ/Sm3
Day Collection
AreaMeter Quantity Nominated Quantity Allocated Difference PCS Volume Version
Last Modification
01/07/2012 RN 34640200 14,1 111,7 97,6 37,716 2.964 1 02/07/201202/07/2012 RN 34640200 14,1 111,7 97,6 37,676 2.967 1 03/07/201203/07/2012 RN 34640200 14,1 111,7 97,6 37,679 2.967 1 04/07/201204/07/2012 RN 34640200 14,1 111,7 97,6 37,688 2.966 1 05/07/201205/07/2012 RN 34640200 14,1 111,7 97,6 37,690 2.966 2 08/07/201206/07/2012 RN 34640200 14,1 111,7 97,6 37,689 2.966 1 07/07/201207/07/2012 RN 34640200 14,1 111,7 97,6 37,690 2.966 1 08/07/201208/07/2012 RN 34640200 14,1 111,7 97,6 37,691 2.966 3 11/07/201209/07/2012 RN 34640200 14,1 111,7 97,6 37,721 2.963 1 10/07/201210/07/2012 RN 34640200 14,1 111,7 97,6 37,705 2.965 1 11/07/201211/07/2012 RN 34640200 14,1 111,7 97,6 37,681 2.966 1 12/07/201212/07/2012 RN 34640200 14,1 111,7 97,6 37,683 2.966 1 13/07/201213/07/2012 RN 34640200 14,1 111,7 97,6 37,771 2.959 1 14/07/201214/07/2012 RN 34640200 14,1 111,7 97,6 38,032 2.939 1 15/07/201215/07/2012 RN 34640200 14,1 111,7 97,6 37,698 2.965 1 16/07/201216/07/2012 RN 34640200 14,1 111,7 97,6 37,716 2.964 2 18/07/201217/07/2012 RN 34640200 14,1 111,7 97,6 37,708 2.964 1 18/07/201218/07/2012 RN 34640200 14,1 111,7 97,6 37,685 2.966 1 19/07/201219/07/2012 RN 34640200 14,1 111,7 97,6 37,681 2.966 1 20/07/201220/07/2012 RN 34640200 14,1 111,7 97,6 37,671 2.967 1 21/07/201221/07/2012 RN 34640200 14,1 111,7 97,6 37,702 2.965 1 22/07/2012
Company name of the User of the BalancingAllocation by Area of Collection
July 2012
Release 2: Provisional Allocation & Balancing - Template Allocation by Collection Area (1/2)
37
• Below is the template of the Collection Area Allocation report to display the provisional allocation for all
the points of all the collection areas of the relative period of interest:
Unità di misura: Nomina GJ; Allocazione GJ; Volume Sm3; PCS MJ/Sm3
Giorno Area Prelievo
Misuratore Quantità Nominata Quantità Allocata Differenza PCS Volume Versione Ultima Modifica
01/07/2012 RN 34640200 14,1 111,8 97,7 37,717 2964 1 02/08/201302/07/2012 RN 34640200 14,1 111,8 97,7 37,677 2967 1 03/08/201303/07/2012 RN 34640200 14,1 111,8 97,7 37,679 2967 1 04/08/201304/07/2012 RN 34640200 14,1 111,8 97,7 37,688 2966 1 05/08/201305/07/2012 RN 34640200 14,1 111,8 97,7 37,690 2966 2 06/08/201306/07/2012 RN 34640200 14,1 111,8 97,7 37,690 2966 1 07/08/201301/07/2012 RN 35718200 212612,4 217626,8 5014,4 38,296 5682807 1 02/08/201302/07/2012 RN 35718200 172972,8 171349,5 -1623,3 38,351 4467927 1 03/08/201303/07/2012 RN 35718200 172972,8 168540,9 -4431,9 38,269 4404139 1 04/08/201304/07/2012 RN 35718200 172972,8 174162,9 1190,1 38,364 4539717 1 05/08/201305/07/2012 RN 35718200 172972,8 172330,6 -642,2 38,293 4500349 2 06/08/201306/07/2012 RN 35718200 172972,8 165397,6 -7575,2 38,050 4346844 1 07/08/201301/07/2012 RN 35718301 374572,1 381560,0 6987,9 38,403 9935792 1 02/08/201302/07/2012 RN 35718301 755478,6 768793,4 13314,8 38,397 20022287 1 03/08/201303/07/2012 RN 35718301 749650,9 745709,5 -3941,4 38,400 19419523 1 04/08/201304/07/2012 RN 35718301 699668,3 683314,7 -16353,6 38,406 17791803 1 05/08/201305/07/2012 RN 35718301 950464,7 988751,7 38287,0 38,440 25721616 2 06/08/201306/07/2012 RN 35718301 1112236,1 1105580,8 -6655,3 38,446 28757047 1 07/08/201301/08/2013 NOC 30009401 41,4 939,0 897,6 38,311 24510 1 02/08/201302/08/2013 NOC 30009401 41,5 695,2 653,7 38,291 18156 1 03/08/201303/08/2013 NOC 30009401 43,6 303,7 260,1 38,248 7940 1 04/08/201304/08/2013 NOC 30009401 49,3 80,9 31,6 38,276 2114 1 05/08/201305/08/2013 NOC 30009401 16,6 300,2 283,6 38,233 7852 2 06/08/201306/08/2013 NOC 30009401 11,4 817,2 805,8 38,286 21345 1 07/08/2013
Ragione sociale dell'utente del bilanciamento
Mese di Luglio 2012
Allocazione per Area di Prelievo
related to cycle 1 and 2 of the day G-1related to cycle 1 and 2 of the day G-1
Illustrative
Release 2: Provisional Allocation & Statement– Template Report Provisional Statement
38
• Below is the template of the Provisional Statement report to display the provisional statement for the
relative period of interest:
Illustrative
Release 3: Final Allocation & Balancing, Transportation Planning
39
Release 1 Release 2 Release 3 Release 4
Principal innovations introduced compared to AS IS
One input template for planning data
Management in "rolling" mode of the missing Nomination information with the Planning data and relative supporting report preparation
Use of easier formats for reporting and integration of the information supplied
Principal Features in Release 3
• Final Allocation
• Final Statement
• Short, medium and long term planning
• Supporting reports
Release 3: Final Allocation & Balancing, Template Final Statement Report
40
Ritaglio schermo acquisito: 07/07/2014 09:32
• Below is the template of the Final Statement report to display the Final Statement for the relative
period of interest:
Ritaglio schermo acquisito: 07/07/2014 11:07
Illustrative
Release 3 -Planning– Overview Planning Template
41
Ritaglio schermo acquisito: 07/07/2014 09:32
Ritaglio schermo acquisito: 07/07/2014 09:32
• The template for the input of planning data has the following structure:
o Head Informations (dislpayed in authomatic by LG)
Name of the users: Company name of the User
Period of interest: time interval for the planning
Unit of Measure: Unit of Measure used for planning data
o Planning informations
Meter: code meter displayed
Month/Day: quantity of gas to be transported displayed
% Market Shares: displayed as % of the quantity of gas
Total: displayed as total quantity of gas to be transported through a Meter for a Day/Month
Ritaglio schermo acquisito: 07/07/2014 11:07
User Name:
STATEMENT THERMAL YEAR 2014/2015
Unit of Measure GJ
User Name:
STATEMENT THERMAL YEAR 2014/2015
Unit of Measure GJ
… SEPTEMBERCivil
Taking (%)
Indusrtial Taking
(%)
Thermoelectric Taking
(%)
TOTAL
SEPTEMBERCivil
Taking (%)
Indusrtial Taking
(%)
Thermoelectric Taking
(%)
TOTAL
METER APRILCivil Taking
(%)Indusrtial
Taking (%)Thermoelectric
Taking (%)
METER OCTOBERCivil Taking
(%)Indusrtial
Taking (%)Thermoelectric
Taking (%)…
Release 3: Planning– Template Annual and Half-Yearly Planning
42
Ritaglio schermo acquisito: 07/07/2014 09:32
Ritaglio schermo acquisito: 07/07/2014 09:32
• Below is the template for the input of Annual and half-Yearly Planning
Ritaglio schermo acquisito: 07/07/2014 11:07
Head Informations
Head Informations
Planning Informations
Planning Informations
User Name:
STATEMENT June
Unit of Measure GJ 2014
08/06/2014Civil
Taking (%)
Indusrtial Taking
(%)
Thermoelectric Taking
(%)
… … 30/06/2014Civil Taking
(%)
Indusrtial Taking
(%)
Thermoelectric Taking
(%)
TOTALMETER 01/06/2014Civil Taking
(%)Indusrtial
Taking (%)Thermoelectric
Taking (%)
User Name:
STATEMENT June 2014
Unit of Measure GJ
30/06/2014Civil
Taking (%)
Indusrtial Taking
(%)
Thermoelectric Taking
(%)
TOTALMETER 01/06/2014Civil Taking
(%)Indusrtial
Taking (%)Thermoelectric
Taking (%)…
Release 3: Planning – Template Monthly and Weekly Planning
43
Ritaglio schermo acquisito: 07/07/2014 09:32
Ritaglio schermo acquisito: 07/07/2014 09:32
Ritaglio schermo acquisito: 07/07/2014 11:07
Head Informations
Planning Informations
Planning Informations
Head Informations
• Below is the template for the input of Monthly and Weekly Planning
Release 3: Planning– Template 30-days planning
44
Ritaglio schermo acquisito: 07/07/2014 09:32
Ritaglio schermo acquisito: 07/07/2014 09:32
• Below is the template for the input of 30-days planning
Ritaglio schermo acquisito: 07/07/2014 11:07
User Name:
STATEMENT Beginning date 24/05/2014
Unit of Measure GJ
23/06/2014Civil
Taking (%)
Indusrtial Taking
(%)
Thermoelectric Taking
(%)
TOTALMETER 24/05/2014Civil Taking
(%)Indusrtial
Taking (%)Thermoelectric
Taking (%)…
Head Informations
Planning Informations
Release 4: Sess. of Adjustment, Intraday Allocation, ...
45
Release 1 Release 2 Release 3 Release 4
Principal innovations introduced compared to AS IS
kWh Introduction protocol Edig@s to manage the
Nomination and Allocation messages
Principal Features in Release 4
• Adjustment session
• Intraday Allocation
• Display Matching data
• Additional supporting reports
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Interim
• Access method
• B2B Communications
• Next Steps
• Contacts46
Interim: Release 1
• For the planning of the activities for subsequent releases in accordance with an organization by process, below is an outline of the operations in relation to the application systems (old and new) given their coexistence during the transitional phase relative to the Nomination Management activities
47
• It will be used for the following activities:
Display of supporting identification information
Input, change, display Nomination information, both in web mode, for the authorized shippers, and X12
Display Reports Display nomination information with 5 year
history
• It will continue to manage:
Display and availability data of Provisional and Final Statement
Adjustment Session Input, change, display of Planning
information
Caminus SystemNLG System
48
• In addition to the functions already highlighted for Release 1, the NLG system will be used for the following additional activities:
Display and availability data of Provisional Statement
Display Allocation and Provisional Statement information with 5 year history
• It will continue to manage:
Display and availability data of Final Statement
Adjustment Session Input, change, display of Planning
information
Caminus SystemNLG System
Interim: Release 2
• For the planning of the activities for subsequent releases in accordance with an organization by process, below is an outline of the operations in relation to the application systems (old and new) given their coexistence during the transitional phase relative to the Allocation and Statement activities
49
• In addition to the functions already highlighted for Release 1 & 2, the NLG system will be used for the following additional activities:
Display and availability data of Final Statement
Input, change, display of Planning information
Display Allocation and Final Statement information with 5 year history
Caminus System
• It will continue to manage:
Adjustment Session
NLG System
• For the planning of the activities for subsequent releases in accordance with an organization by process, below is an outline of the operations in relation to the application systems (old and new) given their coexistence during the transitional phase relative to the Allocation and Final Statement activities
Interim: Release 3
50
NLG System
• In addition to the functions already highlighted for Release 1, 2 & 3, the NLG system will be used for the following additional activities:
Adjustment Session kWh Management of the Nomination and
Allocation messages through protocol Edig@s
Intraday Allocation
Display Matching data
Caminus System
• n.a. due to complete decommissioning
Interim: Release 4
• With regard to Release 4, focused on functional and regulatory enhancement, operations will be conducted entirely on the new system
Interim: Attention Points
• In the new platform will exist more data details, for example there will be 7 decimal numbers for the
data expressed in Energy (GJ), until the transition is completed we point out the coexistence of a
different method of managing the number of decimal numbers between the nomination and
allocation data.
• Simultaneous use of both systems (Caminus and NLG), maintaining the operations as is
• Where possible, setting up the data base with depth of five years according to the logic of NLG
51
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Interim
• B2B Communications
• Next Steps
• Contacts
52
Interaction Method with the Users
• Communication with the Users can take place in various ways
o Web interface Planning (GUI, File Upload) Allocations (GUI, File Download) Statements (GUI, File Download)
o B2B Integration - Protocol X12 Nominations
o B2B Integration - Protocol Edig@s Nominations Allocations
53
• Starting in March special information communications have been published of the Snam Rete Gas site for the Users relative to the development of the new system, containing information and instructions on the approach to adopt regarding the innovations introduced by the new platform.
• News of the solution: Increased Security Level
o the Snam Rete Gas Logistics System will use exclusively the HTTPS (HyperText Transfer Protocol over Secure Socket Layer) protocol in both directions, with authentication of the system (Basic Authentication).
o The coding of the message is not anticipated in the communications, only the transmission channel through Secure HTTP (HTTPS).
• Connectivity Test on HTTPS protocol completed in June (further details to follow)
54
Interaction Method with the Users: B2B Communications
Connectivity Test X12 - Results
• Number of Shippers who attended the connectivity test: 56
• Results at 30th June 2014 (end of the test)
Positive: 46 (82%)
Negative: 2 (3,5%)
Not attended: 8 (14,5%)
55
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Interim
• Access method & interaction with users
• B2B Communications
• Next Steps
• Contacts56
Next Steps
• Integration Test Release R1: July 2014 / August 2014 (ongoing)
• R1 System Tests: 2 weeks before the go live system, there will be a week for system test
57
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Interim
• Access method & interaction with users
• B2B Communications
• Next Steps
• Contacts58
Contacts
• Should you need clarifications, please contact the following:
Thank you for your attention
Contacts
59