WELL TIME PROPOSAL ESTIMATE

OPERATOR PT. PERTAMINA EP CONTRACT AREA INDONESIACONTRACT AREA NO ASSET 4

NO AFE 14 -XXXXDATE 21 April 2023

PROJECT TYPE Development / Exploitation

WELL NAME SEMANGGI INFILL

LOCATION SEMANGGI INFILL

FIELD STRUCTURE Semanggi

WELL TYPE Vertical

KOP at 0 m

OVERLAP LINER 7" 70 m

OVERLAP LINER 4.1/2" 0 m

INCLINATE & AZIMUTH -

BASIN Cekungan

ELEVASI 0 m

SURFACE COORDINATE E = xxxx.xxx M N = xxxx.xxx M

TARGET COORDINATE E = xxxx.xxx M N = xxxx.xxx M Main Target : Lap III (Utama)

E = xxxx.xxx M N = xxxx.xxx M

E = xxxx.xxx M N = xxxx.xxx M Main Target : XXX

RIG / OWNER 550 HP

TINGGI RIG FLOOR 5.00 m from Ground Level

WELL TIME ESTIMATEDRILLING JOB DESC

DRILLING TIME (days)

Drilling Non Drilling TOTAL

Rig Move 7 7Rig Up 5 5Rig up Top Drive 2 2Drilling 36" 36 30 0.00 0.00 0.00Drilling 26" 26 20 0.00 0.00 0.00Drilling 17.5" 17 1/2 13 3/8 70.0 200 0.88 2.33 3.20

Drilling 12.25" 12 1/4 9 5/8 350.0 200 2.59 1.68 4.27

Drilling 8.5" 8 1/2 7 533.0 150 280.0 2.19 0.54 2.73

Drilling 6" 6 4 1/2 0.0 0.00 0.00 0.00

Cement Production Casing 1.32 1.32

Completion Session 3.13 3.13

Production Test 3.00 3.00

Rig Down 3 3

TOTAL DRILLING DAYS 17.66

TOTAL RIG DAYS 34.66

POOH & RIH RateFor BHA and Tubing 5 min/stdsFor Running Casing 7 min/jtsFor Stand-Up 10 min/jts

CASING PROPERTIES MUD PROPERTIES

OH SIZE TYPE POUNDER THREAD RANGE DEPTH LINK REFERENCE TYPE SG36 30" at 0 mMD Spud Mud 1.04 - 1.0726 K-55 94 BTC R-3 20", K-55, 94 ppf, BTC, R-3 at 0 mM KCL Polimer 1.04 - 1.0717 1/2 K-55 54.5 BTC R-3 70.0 13 3/8", K-55, 54.5 ppf, BTC, R-3 a Spud Mud 1.07 - 1.0712 1/4 K-55 40 BTC R-3 350.0 9 5/8", K-55, 40 ppf, BTC, R-3 at 3 KCL Polimer 1.06 - 1.078 1/2 N-80 26 BTC R-3 533.0 7", N-80, 26 ppf, BTC, R-3 at 533 KCL Polimer 1.10 - 1.156 4 1/2", , ppf, , at 0 mMD

xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxTOL 7" at 280 mMD

xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxTOL 4 1/2" at 0 mMD

xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxKOP at 0 mMD

xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxTOTAL DEPTH at 533 mMD

Key Point Do you plan to use some equipment below ??

Specified Well Top Drive yesMWD + MotorLWD + Motor

yes GVROther DirectionalWhipstockWell Logged yes

OH SIZE(inch)

CSG SIZE(inch)

DEPTH (meter)

Drilling RATE (m/days)

Top of Liner(mMD)

Page 2: SMG-INFILL 533m.xlsx

document.xlsx

RENCANA WELL PROFILE

LOCATION : SEMANGGI INFILL

WELL : SEMANGGI INFILL

RKB relative to GL : 5.00 m

2 2 1 1 2 2 2 2 1 1 2 2

Gel Water 1,07 Sg2 2 1 1 2 2 2 2 1 1 2 2

13 3/8", K-55, 54.5 ppf,2 2 1 1 2 2 2 2 1 1 2 2

BTC, R-32 2 1 1 2 2 2 2 1 1 2 2

2 2 1 1 2 2 2 2 1 1 2 2

2 2 1 1 2 2 2 2 1 1 2 2

2 2 1 1 2 2 2 2 1 1 2 2

2 2 1 1 2 2 2 2 1 1 2 2

Spud Mud, Sg 1.072 2 0 1 2 2 2 2 1 0 2 2

13 3/8", K-55, 54.5 ppf, BTC, R-3 at 70 mMD2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 2 2 2 2 1 2 2 2

2 2 2 1 0 2 2 0 1 2 2 2

TOL 7" at 280 m

2 2 2 1 1 2 2 1 1 2 2 2

2 2 2 1 1 2 2 1 1 2 2 2

2 2 2 1 1 2 2 1 1 2 2 2

2 2 2 1 1 2 2 1 1 2 2 2

2 2 2 1 1 2 2 1 1 2 2 2

2 2 2 1 1 2 2 1 1 2 2 2

2 2 2 1 1 2 2 1 1 2 2 2

2 2 2 1 1 2 2 1 1 2 2 2

KCL Polimer, Sg 1.062 2 2 0 1 2 2 1 0 2 2 2

9 5/8", K-55, 40 ppf, BTC, R-3 at 350 mMD2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

2 2 2 2 1 2 2 1 2 2 2 2

KCL Polimer, Sg 1.102 2 2 2 0 2 2 0 2 2 2 2

7", N-80, 26 ppf, BTC, R-3 at 533 mMD

2 Total Depth 533 mMD 2

Page 3: SMG-INFILL 533m.xlsx

DRILLING TIME ESTIMATION

NO JOB DESCRIPTION CODEPLAN CLASSIFIED DRILLING TIME

RemarksHOURS DAYS CUMM DAYS RIG DAYS DEPTH SESSION DAYS

0.00 0.001 Rig Up, including Stand-up 5" DP and 8" DC. 1a 120 5.00 XXXXXX 5.00 0.00 Rig-Up Rig Equipment 5.002 Rig Up Top Drive M/U BHA dan Bit 26". 1a 48 2.00 XXXXXX 7.00 0.00 Rig-Up Top Drive 2.00

PRE SPUD SESSION 168.0 7.00 0.00 7.00 0.0036" DRILLING SESSION 0.0 0.00 0.00 7.00 0.00

3 0 0.0 0.00 0.00 7.00 0.00 0.00

4 0 0.0 0.00 0.00 7.00 0.00 0.005 0 0.0 0.00 0.00 7.00 0.00 0.006 0 0.0 0.00 0.00 7.00 0.00 0.007 0 0.0 0.00 0.00 7.00 0.00 0.008 0 -0.5 -0.02 -0.02 6.98 0.00 0.009 0 0.0 0.00 -0.02 7.00 0.00 0.00

10 0 0.0 0.00 -0.02 7.00 0.00 0.0011 0 0.0 0.00 -0.02 7.00 0.00 0.0012 0 0.0 0.00 -0.02 7.00 0.00 0.0013 0 0.0 0.00 -0.02 7.00 0.00 0.0014 0 0.0 0.00 -0.02 7.00 0.00 0.0015 0 0.0 0.00 -0.02 7.00 0.00 0.0016 0 0.0 0.00 -0.02 7.00 0.00 0.00

►►►►

26" DRILLING SESSION -0.5 -0.02 0.00 7.00 0.0017 0 0.0 0.00 0.00 7.00 0.00 0.00

18 Prepare Non Directional BHA + 17 1/2" Bit 6a 2.0 0.08 0.08 7.08 0.00 0.0019 0 0.0 0.00 0.08 7.08 0.00 0.0020 0 0.0 0.00 0.08 7.08 0.00 0.0021 0 0.0 0.00 0.08 7.08 0.00 0.0022 Drilling Formation 17 1/2" to Csg Point at 70 m, ROP 200 m/days 2a 13.4 0.56 0.64 7.64 70.00 0.0023 Circulate hole clean at bottom 5a 2.0 0.08 0.73 7.73 70.00 0.0024 Short Trip condition hole for 17.5" Drilling 6a 1.4 0.06 0.78 7.78 70.00 0.0025 Circulate hole clean and drop Survey. 5a 2.0 0.08 0.87 7.87 70.00 0.0026 POOH 17 1/2" Bit from Csg Point & L/D BHA 6a 0.2 0.01 0.88 7.88 70.00 Drilling 17.5" 0.8827 Prepare casing handling tools to run 13 3/8" Casing 12a 1.0 0.04 0.92 7.92 70.00 0.0028 RIH Casing 13 3/8", rate 7 mnt/std 12b 0.9 0.04 0.95 7.95 70.00 0.0029 M/U Cementing Head. Circulate Condition Mud using Rig Pump 5b 2.0 0.08 1.04 8.04 70.00 0.0030 M/U Cementing Line. Continue mixing cement additives 13a 2.0 0.08 1.12 8.12 70.00 0.0031 Cement 13.3/8" Casing 13b 4.0 0.17 1.29 8.29 70.00 0.0032 Wait On Cement 14 8.0 0.33 1.62 8.62 70.00 0.0033 Cut 20" casing and N/D Diverter 20" 15a 6.0 0.25 1.87 8.87 70.00 0.0034 Nipple Up Bottom Flange 13-5/8" (incl: cut excess casing, ) 16a 22.0 0.92 2.79 9.79 70.00 0.0035 Nipple Up BOP 13.5/8" x 5.000 psi 15a 8.0 0.33 3.12 10.12 70.00 0.0036 Pressure Test BOP 13.5/8" x 5.000 psi 15b 2.0 0.08 3.20 10.20 70.00 Non Drilling 17.5" 2.33

►►►►

17.1/2" DRILLING SESSION 76.9 3.20 3.20 10.20 70.0037 Stand up 10 stands DP ( ± 280 m), Prepare for RIH 12.1/4", Rate 10 mnt/std 6d 1.7 0.07 3.27 10.27 70.00 0.0038 Prepare Directional BHA + 12 1/4" Bit 6a 2.0 0.08 3.36 10.36 70.00 0.0039 RIH Bit 12 1/4" to tag TOC, rate 5 mnt/std 6a 0.2 0.01 3.36 10.36 70.00 0.0040 Drill out Plug, collar, cement, shoe and 2 mtrs of new formation. 2a 8.0 0.33 3.70 10.70 70.00 0.0041 Circulate conditioning mud 5b 2.0 0.08 3.78 10.78 70.00 0.0042 Mud Off Test 2c 1.0 0.04 3.82 10.82 70.00 0.0043 Drilling Formation 12.25" to Csg Point at 350 m, ROP 200 m/days 2a 39.6 1.65 5.47 12.47 350.00 0.0044 Circulate hole clean at bottom 5a 2.0 0.08 5.56 12.56 350.00 0.0045 Short Trip condition hole for 12.25" Drilling 6a 2.7 0.11 5.67 12.67 350.00 0.0046 Circulate hole clean at bottom 5a 2.0 0.08 5.75 12.75 350.00 0.0047 POOH 12 1/4" Bit from Csg Point & L/D BHA 6a 1.0 0.04 5.79 12.79 350.00 Drilling 12.25" 2.5948 Prepare casing handling tools to run 9 5/8" Casing 12a 1.0 0.04 5.84 12.84 350.00 0.0049 RIH Casing 9 5/8", rate 7 mnt/std 12b 4.3 0.18 6.02 13.02 350.00 0.0050 M/U Cementing Head. Circulate Condition Mud using Rig Pump 5b 2.0 0.08 6.10 13.10 350.00 0.0051 M/U Cementing Line. Continue mixing cement additives 13a 2.0 0.08 6.18 13.18 350.00 0.0052 Cement 9.5/8" Casing 13b 5.0 0.21 6.39 13.39 350.00 0.0053 Wait On Cement 14 8.0 0.33 6.72 13.72 350.00 0.0054 Nipple Down BOP 13 5/8" x 5.000 psi 15a 4.0 0.17 6.89 13.89 350.00 0.0055 Nipple Up Casing Head Spool 11" 16a 4.0 0.17 7.06 14.06 350.00 0.0056 Nipple Up BOP 13.5/8" x 5.000 psi 15a 8.0 0.33 7.39 14.39 350.00 0.0057 Pressure Test BOP 13.5/8" x 5.000 psi 15b 2.0 0.08 7.47 14.47 350.00 Non Drilling 12.25" 1.68

►►►►

12.1/4" DRILLING SESSION 102.5 4.27 7.47 14.47 350.0058 Stand up 7 stands DP ( ± 183 m), Prepare for RIH 8.1/2", Rate 10 mnt/std 6d 1.1 0.05 7.52 14.52 350.00 0.0059 Prepare Non Directional BHA + 8 1/2" Bit 6a 2.0 0.08 7.60 14.60 350.0060 RIH Bit 8 1/2" to tag TOC, rate 5 mnt/std 6a 1.0 0.04 7.65 14.65 350.00 0.0061 Drill out Plug, collar, cement, shoe and 2 mtrs of new formation. 2a 8.0 0.33 7.98 14.98 350.00 0.0062 Circulate conditioning mud 5b 2.0 0.08 8.06 15.06 350.00 0.0063 Mud Off Test 2c 1.0 0.04 8.10 15.10 350.00 0.0064 Drilling Formation 8.5" to Csg Point at 533 m, ROP 150 m/days 2a 29.3 1.22 9.32 16.32 533.00 0.0065 Circulate hole clean at bottom 5a 2.0 0.08 9.41 16.41 533.00 0.0066 Short Trip condition hole for 8.5" Drilling 6a 2.5 0.10 9.51 16.51 533.0067 Circulate hole clean at bottom 5a 2.0 0.08 9.59 16.59 533.0068 POOH 8 1/2" Bit from Csg Point & L/D BHA 6a 1.6 0.07 9.66 16.66 533.00 Drilling 8.5" 2.1969 Prepare logging tools 11a 1.0 0.04 9.70 16.70 533.00 0.0070 Run Logs : DSI-GR 11b 6.0 0.25 9.95 16.95 533.00 0.0071 Run Logs : LDL-CNL-GR 11b 6.0 0.25 10.20 17.20 533.00 0.0072 Run Logs : HALS-MSFL-BHC-GR-SP 11b 6.0 0.25 10.20 17.20 533.00 Non Drilling 8.5" 0.54

►►►►

8.1/2" DRILLING SESSION 71.5 2.98 10.20 17.20 533.006" DRILLING SESSION 0.0 0.00 10.20 17.20 533.00

73 0 0.0 0.00 10.20 17.20 533.00 0.0074 0 0.0 0.00 10.20 17.20 533.00 0.0075 RIH Bit 8 1/2" to condition hole to Bottom, rate 5 mnt/std 6a 1.6 0.07 10.27 17.27 533.00 0.0076 Circulate hole clean 5a 2.0 0.08 10.35 17.35 533.00 0.0077 POOH 8 1/2" Bit from Csg Point & L/D BHA 6a 1.6 0.07 10.42 17.42 533.00 0.0078 Prepare casing handling tools to run 7" Casing/Liner 12a 2.0 0.08 10.50 17.50 533.00 0.0079 RIH Casing 7", rate 7 mnt/std 12b 6.5 0.27 10.77 17.77 533.00 0.0080 M/U Cementing Head. Circulate Condition Mud using Rig Pump 5b 2.0 0.08 10.86 17.86 533.00 0.0081 M/U Cementing Line. Continue mixing cement additives 13a 2.0 0.08 10.94 17.94 533.00 0.0082 Cement 7" Casing. 13b 6.0 0.25 11.19 18.19 533.00 0.0083 Wait On Cement 14 8.0 0.33 11.52 18.52 533.00 Cement Production Casing 1.3284 Nipple Down BOP 13 5/8" x 5.000 psi 15a 4.0 0.17 11.69 18.69 533.00 0.0085 Nipple Up Tubing Head Spool 11" x 7-1/16" 16a 6.0 0.25 11.94 18.94 533.00 0.0086 Nipple Up BOP 7-1/16" x 5.000 psi 15a 6.0 0.25 12.19 19.19 533.00 0.0087 RIH Bit 6" + DP 3.1/2" to tag Landing Collar 7", rate 5 mnt/std 6a 5.5 0.23 12.42 19.42 533.00 0.0088 Circulate hole clean 5a 2.0 0.08 12.50 19.50 533.00 0.0089 POOH 6" Bit from Landing Collar 7" & L/D BHA 6a 1.5 0.06 12.57 19.57 533.00 0.0090 Rig Down Top Drive 6b 24.0 1.00 13.57 20.57 533.00 0.0091 0 0.0 0.00 13.57 20.57 533.00 0.0092 0 0.0 0.00 13.57 20.57 533.00 0.0093 0 0.0 0.00 13.57 20.57 533.00 0.0094 0 0.0 0.00 13.57 20.57 533.00 0.0095 RIH 7" Scrapper w/ Tubing jts/jts to tag Landing Collar, Rate 10 min/jt 6d 3.1 0.13 13.70 20.70 533.00 0.0096 Circulate and change over to Completion Fluid 5b 4.0 0.17 13.86 20.86 533.00 0.0097 POOH 7" Scrapper from Landing Collar 7" & L/D BHA 6b 1.5 0.06 13.93 20.93 533.00 0.0098 Prepare logging tools 11a 1.0 0.04 13.97 20.97 533.00 0.0099 Run Logs : CBL-VDL-CET-CCL-GR 11b 6.0 0.25 14.22 21.22 533.00 0.00

100 Prepare Perforation Tools 11a 2.0 0.08 14.30 21.30 533.00 0.00101 Perforation 11b 6.0 0.25 14.55 21.55 533.00 0.00102 RIH Prod String 2.7/8" Tubing to 7" Prod Csg, not joint/joint, incl. set packer 17a 2.5 0.11 14.66 21.66 533.00 Completion Session 3.13103 Nipple Down BOP 7-1/16" x 5.000 psi 15a 6.0 0.25 14.91 21.91 533.00 0.00104 Nipple Up X-masstree 16a 6.0 0.25 15.16 22.16 533.00 0.00105 Production Test 17b 60.0 2.50 17.66 24.66 533.00 Production Test 3.00

►►►►

COMPLETION 178.9 7.45 17.66 24.66 533.00106 Rig Release & R/D Rig 0 72.0 3.00 XXXXXX 27.66 533.00 Rig Down 3.00

►►►►

TOTAL DRILLING TIME (DAYS) 17.7TOTAL RIG TIME OPERATION (DAYS) 27.7

A39
masrul: please put cursor to "header" this rows, right click and INSERT COPIED CELLS here !! Note: To maintain formulas working
A61
masrul: please put cursor to "header" this rows, right click and INSERT COPIED CELLS here !! Note: To maintain formulas working
A84
masrul: please put cursor to "header" this rows, right click and INSERT COPIED CELLS here !! Note: To maintain formulas working
A101
masrul: please put cursor to "header" this rows, right click and INSERT COPIED CELLS here !! Note: To maintain formulas working
C150
Irbab: Plus Acidizing 1.5 HK
A151
masrul: please put cursor to "header" this rows, right click and INSERT COPIED CELLS here !! Note: To maintain formulas working
A154
masrul: please put cursor to "header" this rows, right click and INSERT COPIED CELLS here !! Note: To maintain formulas working
Page 4: SMG-INFILL 533m.xlsx
Page 5: SMG-INFILL 533m.xlsx

document.xlsx

DRILLING TIME CHART - WELL SEMANGGI INFILL

4.5 7 9.625 13.375 20 30 CASING DESIGN FORMATION

2 2 1 1 2 2

WO

NO

CO

LO

2 2 1 1 2 2

2 2 1 1 2 2

2 2 1 0 2 2 13 3/8" at 70 m2 2 1 2 2 2

2 2 1 2 2 2

2 2 1 2 2 2

BU

LU

2 2 1 2 2 2

2 2 1 2 2 2

2 2 1 2 2 2

2 2 1 2 2 2

2 2 1 2 2 2

2 2 1 2 2 2

NG

RA

YO

NG

2 2 1 2 2 2

2 0 1 2 2 2 TOL 7" at 280 m2 1 1 2 2 2

2 1 1 2 2 2

2 1 0 2 2 2 9 5/8" at 350 m2 1 2 2 2 2

2 1 2 2 2 2

2 1 2 2 2 2

2 1 2 2 2 2

2 1 2 2 2 2

2 1 2 2 2 2

2 1 2 2 2 2

2 1 2 2 2 2

2 1 2 2 2 2

2 0 2 2 2 2 7" at 533 m2

DATA TEKNISNo. AFE : 14 -XXXXWell Name : SEMANGGI INFILLLocation : SEMANGGI INFILL

KETERANGAN Duration Rig DaysField Structure : SemanggiSurface Coordinate : E = xxxx.xxx M Dry Hole Basis Kum Hari Kum

N = xxxx.xxx M A - B : Rig-up, termasuk R/U Top Drive dan stand-up DP & DC. 0 7.0 - 7

Elevation : 0.000 B - C : Drilling 17.5" OH to 70 m, Circulation, Trip, POOH & L/D BHA #N/A 0.88 0.88 7.88

Well Type : Vertical C - D : RIH & 13.3/8" Casing Cementing job, WOC, N/U WellHead, N/U BOP & Pressure Test #N/A 2.33 3.20 10.20

Project Type : Development / Exploitation D - E : Drilling 12.25" OH to 350 m, Circulation, Trip, POOH & L/D BHA #N/A 2.59 5.79 12.79

Total Depth : 533.0 m E - F : RIH & Cement Casing 12.1/4", TSK, N/U WellHead, N/U & Tes BOP #N/A 1.68 7.47 14.47

Rig / Owner : 550 HP F - G : Drilling 8.5" OH to 533 m, Circulation, Trip, POOH & L/D BHA #N/A 2.19 9.66 16.66

Tinggi Rig Floor : 5.00 m G - H : RIH & Cement Casing 7", TSK, N/U WellHead, N/U & Tes BOP #N/A 0.54 10.20 17.20H - 0 : 0 PLEAZE HIDDEN THIS ROW ONLY BY CLICK ROW HEADER and THEN CLICK HIDE 0.00 10.20 17.200 - 0 : 0 PLEAZE HIDDEN THIS ROW ONLY BY CLICK ROW HEADER and THEN CLICK HIDE 0.00 10.20 17.20Completion

H - I : RIH Scrapper to Liner depth interval, RIH and perform production casing cementing job 1.32 11.52 18.52I - J : RIH Casing Scrapper to perforated zone interval. Cased Hole Logging & Perforation. RIH Production String 3.13 14.66 21.66J - K : N/D BOP Stack. N/U X-masstree. Production Test 3.00 17.66 24.66K - L : Rig Down 3.00 - 27.66

TOTAL OPERASIONAL DAYS 17.66 27.66

Drill'g Days

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30

0

100

200

300

400

500

600

DAYS

DE

PT

H (

mM

D)

A

B

C

D

EF

K LM N

G

H

I J

DRILLING DEPARTMENT

Page 6: SMG-INFILL 533m.xlsx

----------------------------- RIP UP/DOWN --------------------------Rig Up, including Stand-up 5" DP and 8" DC.Rig Up Top Drive M/U BHA dan Bit 26".

--------------- DRILLING FORMATION & CEMENT -------------Drilling Formation 36" to Csg Point at 0 m, ROP 0 m/daysDrilling Formation 26" to Csg Point at 0 m, ROP 0 m/days

No KOP at 17.5"inDrilling Formation 17 1/2" to Csg Point at 70 m, ROP 200 m/days

No KOP at 12.25"Drilling Formation 12.25" to Csg Point at 350 m, ROP 200 m/days

No KOP at 8.5"Drilling Formation 8.5" to Csg Point at 533 m, ROP 150 m/daysDrilling Formation by GVR to Csg Point at m, ROP m/days

Drilling Formation 6" to Csg Point at 0 m, ROP 0 m/daysDrill Out cement to top liner 7" Drill Out cement to top liner 6" Drill out Plug, collar, cement, shoe and 2 mtrs of new formation.

---------------------------- CIRCULATING -----------------------------Circulate conditioning mudCirculate conditioning mud Sg in=outCirculate hole cleanCirculate hole clean at bottomCirculate hole clean and drop Survey.Circulate and change over to Completion Fluid

------------------------ BOP EQUIPMENT ---------------------------Cut 30" casing and N/D Diverter 30"Cut 20" casing and N/D Diverter 20"Nipple Down BOP 13 5/8" x 5.000 psiNipple Down BOP 7-1/16" x 5.000 psiNipple Up Diverter 30"Nipple Up Diverter 20". (incl : Welded & inspection)Nipple Up BOP 13.5/8" x 5.000 psiNipple Up BOP 7-1/16" x 5.000 psiPressure Test Diverter 30"Pressure Test Diverter 20"

DATA(NOTE : Coloured Cell on this column was

formulated to make reading easier)

Page 7: SMG-INFILL 533m.xlsx

Pressure Test BOP 13.5/8" x 5.000 psiPressure Test BOP 7-1/16" x 5.000 psiFunction Test Diverter 30"Function Test Diverter 20"

------------------ WELLHEAD & X-MASSTREE-------------------Nipple Up Bottom Flange 20", (incl : welded & inspection)Nipple Up Bottom Flange 13-5/8" (incl: cut excess casing, )Nipple Up Casing Head Spool 11"Nipple Up Tubing Head Spool 11" x 7-1/16"Nipple Up X-masstree

---------------------------PULL OUT of HOLE -------------------------POOH 36" Bit from Csg Point & L/D BHAPOOH 26" Bit from Csg Point & L/D BHAPOOH 17 1/2" Bit from Csg Point & L/D BHAPOOH 12 1/4" Bit from Csg Point & L/D BHAPOOH 8 1/2" Bit from Csg Point & L/D BHAPOOH 6" Bit from Csg Point & L/D BHAPOOH 9 5/8" Scrapper from TOL 7" & L/D BHAPOOH 7" Scrapper from TOL 4.5" & L/D BHAPOOH 7" Scrapper from Landing Collar 7" & L/D BHAPOOH 4 1/2" Scrapper from Landing Collar 4.5" & L/D BHAPOOH 8 1/2" Bit from TOL 7" & L/D BHAPOOH 6" Bit from TOL 4.5" & L/D BHAPOOH 6" Bit from Landing Collar 7" & L/D BHAPOOH 3.3/4" Bit from Landing Collar 4.5" & L/D BHAPOOH and L/D 7" Liner setting toolPOOH and L/D 4.1/2" Liner setting tool

-------------------------------- PREPARE -----------------------------Prepare casing handling tools to run 30" Stove PipePrepare casing handling tools to run 20" Conductor Casing Prepare casing handling tools to run 13 3/8" Casing Prepare casing handling tools to run 9 5/8" Casing Prepare casing handling tools to run 7" Casing/LinerPrepare Non Directional BHA + 26" BitPrepare Non Directional BHA + 17 1/2" BitPrepare Non Directional BHA + 12 1/4" BitPrepare Non Directional BHA + 8 1/2" BitPrepare Non Directional BHA + 6" BitPrepare Directional BHA + 17 1/2" BitPrepare Directional BHA + 12 1/4" BitPrepare Directional BHA + 8 1/2" BitPrepare Directional BHA + 6" Bit Prepare logging toolsPrepare Perforation Tools

------------------------- RIH BIT & SCRAPPER --------------------RIH Bit 36" to tag TOC at ± 0 m, rate 5 mnt/stdRIH Bit 26" to tag TOC, rate 5 mnt/std

Page 8: SMG-INFILL 533m.xlsx

RIH Bit 17 1/2" to tag TOC, rate 5 mnt/stdRIH Bit 12 1/4" to tag TOC, rate 5 mnt/stdRIH Bit 8 1/2" to tag TOC, rate 5 mnt/stdRIH Bit 6" to tag TOC, rate 5 mnt/stdRIH Bit 8 1/2" to tag Top Liner 7", rate 5 mnt/stdRIH Bit 6" to tag Top Liner 4.1/2", rate 5 mnt/stdRIH Bit 6" + DP 3.1/2" to tag Landing Collar 7", rate 5 mnt/stdRIH Bit 3.3/4" to tag Landing Collar 4.5", rate 5 mnt/stdRIH Bit 8 1/2" to condition hole to Bottom, rate 5 mnt/stdRIH Bit 6" to condition hole to Bottom, rate 5 mnt/std

RIH 9-5/8" Scrapper to tag TOL 7"RIH 7" Scrapper to tag TOL 4.1/2"RIH 7" Scrapper to tag Landing CollarRIH 4-1/2" Scrapper to tag Landing CollarRIH 9-5/8" Scrapper w/ Tubing jts/jts to tag TOL 7", Rate 10 min/jtRIH 7" Scrapper w/ Tubing jts/jts to tag TOL 4.1/2", Rate 10 min/jtRIH 7" Scrapper w/ Tubing jts/jts to tag Landing Collar, Rate 10 min/jtRIH 4.1/2" Scrapper w/ Tubing jts/jts to tag Landing Collar, Rate 10 min/jtRIH 7" & 4.1/2" Scrapper Tandem w/ Tubing jts/jtsRIH Prod String 2.7/8" Tubing to 7" Prod Csg, not joint/joint, incl. set packerRIH Production String Tubing 2.7/8" joint/joint, incl. set packer, rate 10 min/stdRIH Prod String 2.7/8" & 2.3/8" Tubing to 4.1/2" Prod Csg, not joint/joint, incl. seRIH Production String Tubing 2.7/8" & 2.3/8" joint/joint, incl. set packer, rate 10

-------------------------------- RIH CASING ---------------------------RIH Casing 30", rate 7 mnt/stdRIH Casing 20", rate 7 mnt/stdRIH Casing 20", incl. RIH Tubing, rate 7 mnt/stdRIH Casing 13 3/8", rate 7 mnt/stdRIH Casing 9 5/8", rate 7 mnt/stdRIH Casing 7", rate 7 mnt/stdRIH Liner 7" with DP, rate 7 mnt/stdRIH Liner 4 1/2 with DP, rate 7 mnt/std

-------------------------- CEMENTING JOB --------------------------Cement 30" casing / Stove PipeCement 20" casingCement 20" casing (include POOH Tubing 2 7/8")Cement 13.3/8" CasingCement 9.5/8" CasingCement 7" Casing. Cement 7" Liner & Set Liner.

--------------------- RUN LOGGING & SURVEY -------------------Run Logs : HALS-MSFL-BHC-GR-SP Run Logs : DLL-MSFL-BHC-GR-SP Run Logs : BHC-GR-SP Run Logs : CBL-VDL-CCL-GR (Not CET included)Run Logs : CBL-VDL-CET-CCL-GR

B112
mAYoL: Masuk RPP Tubing 2.7/8" secara joint per joint sampai kedalaman maksimum, Landing Collar = Shoe 7" - 20 m
B113
mAYoL: Masuk RPP Tubing 2.7/8" sampai kedalaman maksimum, Landing Collar = Shoe 7" - 20 m
B114
mAYoL: Masuk RPP Tubing 2.7/8" + 2.3/8" (tandem/tappered string) sampai kedalaman Landing Collar = Shoe - 20 m (asumsi maksimum).
B115
mAYoL: Masuk RPP Tubing 2.7/8" + 2.3/8" (tandem/tapered string) sampai kedalaman Landing Collar = Shoe - 20 m (asumsi maksimum).
Page 9: SMG-INFILL 533m.xlsx

Run Logs : LDL-CNL-GR Run Logs : CNL-GR Run Logs : DSI-GR Run Totco Survey

----------------------------------- TRIP ------------------------------------Round Trip and clean the bit Short Trip condition hole for 26" DrillingShort Trip condition hole for 17.5" DrillingShort Trip condition hole for 12.25" DrillingShort Trip condition hole for 8.5" DrillingShort Trip condition hole for 6" DrillingWiper Trip condition hole

------------------------------- STAND UP -------------------------------Stand up -5 stands DP ( ± -50 m), Prepare for RIH 17.1/2", Rate 10 mnt/std

Stand up 10 stands DP ( ± 280 m), Prepare for RIH 12.1/4", Rate 10 mnt/std

Stand up 7 stands DP ( ± 183 m), Prepare for RIH 8.1/2", Rate 10 mnt/std

--------------------------- DAN LAIN-LAIN ----------------------------Wait On CementWait On Cement (incl : L/D over flow dan flow line)M/U Cementing Head. Circulate Condition Mud using Rig PumpM/U Cementing Line. Continue mixing cement additivesMud Off Test Production TestPerforationRig Down Top DriveRig Release & R/D Rig

Coring JobFishing Job

B154
mAYoL: Stand-Up DP sampai kedalaman Casing Point 6" sebelum masuk rangkaian 8.1/2"
Page 10: SMG-INFILL 533m.xlsx

CODE

DATA REFERENCE

DEPTH (MMD)

#N/A #N/ANot Specific 1a #N/A #N/ANot Specific 1a #N/A #N/A

#N/A #N/A

#N/A36" OH 2a 36 30 0 26" OH 2a 26 20 0

#N/A #N/A17.1/2" OH 2a 17 1/2 13 3/8 0 17.1/2" OH 2a 17 1/2 13 3/8 70

#N/A #N/A12.1/4" OH 2a 12 1/4 9 5/8 0 12.1/4" OH 2a 12 1/4 9 5/8 350

#N/A #N/A8.1/2" OH 2a 8 1/2 7 0 8.1/2" OH 2a 8 1/2 7 533

2a

6" OH 2a 6 4 1/2 0 Completion 2a 8 1/2 7 533 Completion 2a 6 4 1/2 0 Not Specific 2a #N/A #N/A

#N/A #N/ANot Specific 5b #N/A #N/ANot Specific 5b #N/A #N/ANot Specific 5a #N/A #N/ANot Specific 5a #N/A #N/ANot Specific 5a #N/A #N/ACompletion 5b #N/A #N/A

#N/A #N/A36" OH 15a #N/A #N/A26" OH 15a #N/A #N/A

Not Specific 15a #N/A #N/ACompletion 15a #N/A #N/A

36" OH 15a #N/A #N/A26" OH 15a #N/A #N/A

Not Specific 15a #N/A #N/ACompletion 15a #N/A #N/A

26" OH 15b #N/A #N/A17.1/2" OH 15b #N/A #N/A

ACTIVITY SESSION OH SIZE

(INCH)CASING SIZE

(INCH)

Page 11: SMG-INFILL 533m.xlsx

Not Specific 15b #N/A #N/ACompletion 15b #N/A #N/A

36" OH 15b #N/A #N/A26" OH 15b #N/A #N/A

#N/A #N/A26" OH 16a #N/A #N/A

17.1/2" OH 16a #N/A #N/A12.1/4" OH 16a #N/A #N/ACompletion 16a #N/A #N/ACompletion 16a #N/A #N/A

#N/A #N/A36" OH 6a 36 30 0 26" OH 6a 26 20 0

17.1/2" OH 6a 17 1/2 13 3/8 70 12.1/4" OH 6a 12 1/4 9 5/8 350 8.1/2" OH 6a 8 1/2 7 533

6" OH 6a 6 4 1/2 0 Completion 6b 12 1/4 9 5/8 350 Completion 6b 8 1/2 7 533 Completion 6b 8 1/2 7 533 Completion 6b 6 4 1/2 0 Completion 6a 8 1/2 7 533 Completion 6a 6 4 1/2 0 Completion 6a 8 1/2 7 533 Completion 6a 6 4 1/2 0 8.1/2" OH 13b 8 1/2 7 533

6" OH 13b 6 4 1/2 0

#N/A #N/A36" OH 12a #N/A #N/A26" OH 12a #N/A #N/A

17.1/2" OH 12a #N/A #N/A12.1/4" OH 12a #N/A #N/A8.1/2" OH 12a #N/A #N/A

26" OH 6a #N/A #N/A17.1/2" OH 6a #N/A #N/A12.1/4" OH 6a #N/A #N/A8.1/2" OH 6a #N/A #N/A

6" OH 6a #N/A #N/A17.1/2" OH 6a #N/A #N/A12.1/4" OH 6a #N/A #N/A8.1/2" OH 6a #N/A #N/A

6" OH 6a #N/A #N/ANot Specific 11a #N/A #N/ACompletion 11a #N/A #N/A

#N/A #N/A36" OH 6a 36 30 0 26" OH 6a 26 20 0

Page 12: SMG-INFILL 533m.xlsx

17.1/2" OH 6a 17 1/2 13 3/8 70 12.1/4" OH 6a 12 1/4 9 5/8 350 8.1/2" OH 6a 8 1/2 7 533

6" OH 6a 6 4 1/2 0 Completion 6a 8 1/2 7 533 Completion 6a 6 4 1/2 0 Completion 6a 8 1/2 7 533 Completion 6a 6 4 1/2 0 Completion 6a 8 1/2 7 533 Completion 6a 6 4 1/2 0

8.1/2" OH 6d 12 1/4 9 5/8 350 6" OH 6d 8 1/2 7 533

Completion 6d 8 1/2 7 533 Completion 6d 6 4 1/2 0 Completion 6d 12 1/4 9 5/8 350 Completion 6d 8 1/2 7 533 Completion 6d 8 1/2 7 533 Completion 6d 6 4 1/2 0 Completion 6d 6 4 1/2 0 Completion 17a 8 1/2 7 533 Completion 17a 8 1/2 7 533 Completion 17a 6 4 1/2 0 Completion 17a 6 4 1/2 0

#N/A #N/A36" OH 12b 36 30 0 26" OH 12b 26 20 0 26" OH 12b 26 20 0

17.1/2" OH 12b 17 1/2 13 3/8 70 12.1/4" OH 12b 12 1/4 9 5/8 350 8.1/2" OH 12b 8 1/2 7 533 8.1/2" OH 12b 8 1/2 7 533

6" OH 12b 6 4 1/2 0

#N/A #N/A36" OH 13b #N/A #N/A26" OH 13b #N/A #N/A26" OH 13b #N/A #N/A

17.1/2" OH 13b #N/A #N/A12.1/4" OH 13b #N/A #N/A8.1/2" OH 13b #N/A #N/A8.1/2" OH 13b #N/A #N/A

#N/A #N/ANot Specific 11b #N/A #N/ANot Specific 11b #N/A #N/ANot Specific 11b #N/A #N/ANot Specific 11b #N/A #N/ANot Specific 11b #N/A #N/A

Page 13: SMG-INFILL 533m.xlsx

Not Specific 11b #N/A #N/ANot Specific 11b #N/A #N/ANot Specific 11b #N/A #N/ANot Specific 2a #N/A #N/A

#N/A #N/A36" OH 6a 36 30 0 26" OH 6a 26 20 0

17.1/2" OH 6a 17 1/2 13 3/8 70 12.1/4" OH 6a 12 1/4 9 5/8 350 8.1/2" OH 6a 8 1/2 7 533

6" OH 6a 6 4 1/2 0 6a #N/A #N/A

#N/A #N/A17.1/2" OH

6d 17 1/2 13 3/8 70 12.1/4" OH

6d 12 1/4 9 5/8 350 8.1/2" OH

6d 8 1/2 7 533

#N/A #N/ANot Specific 14 #N/A #N/ANot Specific 14 #N/A #N/ANot Specific 5b #N/A #N/ANot Specific 13a #N/A #N/ANot Specific 2c #N/A #N/ACompletion 17b #N/A #N/ACompletion 11b #N/A #N/ACompletion 6b #N/A #N/ACompletion

8.1/2" OH8.1/2" OH 20

Page 14: SMG-INFILL 533m.xlsx

DATA REFERENCE DRILLING TIME

STANDARD ADJUSTING TOTAL

#N/A 0.00#N/A 120.00 120.00#N/A 48.00 48.00#N/A

#N/A0 0.00 0.00 0.000 0.00 0.00 0.00#N/A

200 0.00 0.00 0.00200 8.40 5.00 13.40 70.00#N/A

200 0.00 0.00 0.00200 33.60 6.00 39.60 350.00#N/A

150 0.00 0.00 0.00150 29.28 29.28 533.00

10.00 10.00 0.00

0 0.00 0.00 0.00150 1.00 1.00

0 1.00 1.00#N/A 8.00 8.00

#N/A 0.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 4.00 4.00

#N/A 0.00#N/A 6.00 6.00#N/A 6.00 6.00#N/A 4.00 4.00#N/A 6.00 6.00#N/A 6.00 6.00#N/A 5.00 5.00#N/A 8.00 8.00#N/A 6.00 6.00#N/A 1.00 1.00#N/A 1.00 1.00

DEPTH for 'Drilling Time'DRILLING RATE

(M/DAYS)

Page 15: SMG-INFILL 533m.xlsx

#N/A 2.00 2.00#N/A 2.00 2.00#N/A 1.00 1.00#N/A 1.00 1.00

#N/A 0.00#N/A 5.00 5.00#N/A 10.00 12.00 22.00#N/A 4.00 4.00#N/A 6.00 6.00#N/A 6.00 6.00

#N/A 0.000 0.00 0.000 0.00 0.00

200 0.21 0.21200 1.04 1.04150 1.59 1.59

0 0.00 0.00200 0.83 0.83150 1.38 1.38150 1.53 1.53

0 -0.06 -0.06150 0.83 0.83

0 1.38 1.38150 1.53 1.53

0 -0.06 -0.06150 1.38 1.38

0 -0.21 3.50 3.29

#N/A 0.00#N/A 1.50 1.50#N/A 1.50 1.50#N/A 1.00 1.00#N/A 1.00 1.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 1.00 1.00#N/A 2.00 2.00

#N/A 0.000 0.00 0.000 0.00 0.00

I56
mayol: Formula = Casing Point (m) x Rate POOH DP (min/std) 28 (m/std)] 60 min/jam
J56
mAYoL: Time for Lay Down
I57
mayol: Formula = Casing Point (m) x Rate POOH DP (min/std) 28 (m/std)] 60 min/jam
J57
mAYoL: Time for Lay Down
I58
mayol: Formula = Casing Point (m) x Rate POOH DP (min/std) 28 (m/std)] 60 min/jam
J58
mAYoL: Time for Lay Down
I59
mayol: Formula = Casing Point (m) x Rate POOH DP (min/std) 28 (m/std)] 60 min/jam
J59
mAYoL: Time for Lay Down
I60
mayol: Formula = Casing Point (m) x Rate POOH DP (min/std) 28 (m/std)] 60 min/jam
J60
mAYoL: Time for Lay Down
I61
mayol: Formula = Casing Point (m) x Rate POOH DP (min/std) 28 (m/std)] 60 min/jam
J61
mAYoL: Time for Lay Down
I62
mayol: Formula = 7" TOL depth (m) x Rate POOH DP (min/std) 28 (m/std)] x 1 jam (L/D) 60 min/jam Note : * TOL depth (m) = (Shoe 958in - 70 m) * 70 m = overlap casing to liner
J62
mAYoL: Time for Lay Down
I63
mayol: Formula = 4.1/2" TOL depth (m) x Rate POOH DP (min/std) 28 (m/std)] x 1 jam (L/D) 60 min/jam Note : * TOL depth (m) = (Shoe 7in - 70 m) * 70 m = overlap casing to liner
J63
mAYoL: Time for Lay Down
I64
mayol: Formula = Landing Collar (m) x Rate POOH DP (min/std) 28 (m/std)] x 1 jam (L/D) 60 min/jam Note : * Landing Collar (m) = (Shoe 7in - 20 m) * 20 m = shoetrack
J64
mAYoL: Time for Lay Down
I65
mayol: Formula = Landing Collar (m) x Rate POOH DP (min/std) 28 (m/std)] x 1 jam (L/D) 60 min/jam Note : * Landing Collar (m) = (Shoe 4.5in - 20 m) * 20 m = shoetrack
J65
mAYoL: Time for Lay Down
I66
mayol: Formula = 7" TOL depth (m) x Rate POOH DP (min/std) 28 (m/std)] x 1 jam (L/D) 60 min/jam Note : * TOL depth (m) = (Shoe 958in - 70 m) * 70 m = overlap casing to liner
J66
mAYoL: Time for Lay Down
I67
mayol: Formula = 4.1/2" TOL depth (m) x Rate POOH DP (min/std) 28 (m/std)] x 1 jam (L/D) 60 min/jam Note : * TOL depth (m) = (Shoe 7in - 70 m) * 70 m = overlap casing to liner
J67
mAYoL: Time for Lay Down
I68
mayol: Formula = Landing Collar (m) x Rate POOH DP (min/std) 28 (m/std)] x 1 jam (L/D) 60 min/jam Note : * Landing Collar (m) = (Shoe 7in - 20 m) * 20 m = shoetrack
J68
mAYoL: Time for Lay Down
I69
mayol: Formula = Landing Collar (m) x Rate POOH DP (min/std) 28 (m/std)] x 1 jam (L/D) 60 min/jam Note : * Landing Collar (m) = (Shoe 4.5in - 20 m) * 20 m = shoetrack
J69
mAYoL: Time for Lay Down
I70
mayol: Formula = 7" TOL depth (m) x Rate POOH DP (min/std) 28 (m/std)] 60 min/jam Note : * TOL depth (m) = (Shoe 7in - 70 m) * 70 m = overlap casing to liner
J70
mAYoL: Time for Lay Down
I71
mayol: Formula = 4.1/2" TOL depth (m) x Rate POOH DP (min/std) 28 (m/std)] x 1 jam (L/D) 60 min/jam Note : * TOL depth (m) = (Shoe 7in - 70 m) * 70 m = overlap casing to liner
J71
mAYoL: tambahan 3.5 jam karena L/D DP 5" sepanjang liner 7"
I90
mAYoL: RIH bit = TOC depth (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam
I91
mAYoL: RIH bit = TOC depth (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam
Page 16: SMG-INFILL 533m.xlsx

200 0.00 1.00 1.00200 0.21 0.21150 1.04 1.04

0 1.59 1.59150 0.83 0.83

0 1.38 1.38150 5.53 5.53

0 -0.06 -0.06150 1.59 1.59

0 0.00 0.00

200 0.83 0.83150 1.38 1.38150 1.53 1.53

0 -0.06 -0.06200 1.67 1.67150 2.76 2.76150 3.05 3.05

0 -0.12 -0.120 -0.12 -0.12

150 2.53 2.53150 4.05 4.05

0 0.94 0.940 0.88 0.88

#N/A 0.000 0.00 0.000 0.00 0.000 1.50 1.50

200 0.86 0.86200 4.30 4.30150 6.55 6.55150 3.94 3.94

0 -4.31 -4.31

#N/A 0.00#N/A 3.00 3.00#N/A 3.00 3.00#N/A 4.00 4.00#N/A 4.00 4.00#N/A 5.00 5.00#N/A 6.00 6.00#N/A 6.00 6.00

#N/A 0.00#N/A 5.00 5.00#N/A 5.00 5.00#N/A 5.00 5.00#N/A 6.00 6.00#N/A 6.00 6.00

I92
mAYoL: RIH bit = TOC depth (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam
I93
mAYoL: RIH bit = TOC depth (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam
I94
mAYoL: RIH bit = TOC depth (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam
I95
mAYoL: RIH bit = TOC depth (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam
I96
mayol: Formula = 7" TOL depth (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam Note : * TOL depth (m) = (Shoe 958in - 70 m) * 70 m = overlap casing to liner
I97
mayol: Formula = 4.1/2" TOL depth (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam Note : * TOL depth (m) = (Shoe - 70 m) * 70 m = overlap casing to liner
I98
mayol: Formula = Landing Collar (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam Note : * Landing Collar (m) = (Shoe - 20 m) * 20 m = shoetrack
I99
mayol: Formula = Landing Collar (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam Note : * Landing Collar (m) = (Shoe - 20 m) * 20 m = shoetrack
I100
mAYoL: RIH bit = Bottom depth (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam
I101
mAYoL: RIH bit = Bottom depth (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam
I103
mayol: Formula = 7" TOL depth (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam Note : * TOL depth (m) = (Shoe 958in - 70 m) * 70 m = overlap casing to liner
I104
mayol: Formula = 4.1/2" TOL depth (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam Note : * TOL depth (m) = (Shoe 7in - 70 m) * 70 m = overlap casing to liner
I105
mayol: Formula = Landing Collar (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam Note : * Landing Collar (m) = (Shoe 7in - 20 m) * 20 m = shoetrack
I106
mayol: Formula = Landing Collar (m) x Rate RIH DP (min/std) 28 (m/std)] 60 min/jam Note : * Landing Collar (m) = (Shoe 4.5in - 20 m) * 20 m = shoetrack
I107
mayol: Formula = 7" TOL depth (m) x Rate Stand-Up (min/std) 28 (m/std)] 60 min/jam Note : * TOL depth (m) = (Shoe 958in - 70 m) * 70 m = overlap casing to liner
I108
mayol: Formula = 4.1/2" TOL depth (m) x Rate Stand-Up (min/std) 28 (m/std)] 60 min/jam Note : * TOL depth (m) = (Shoe 7in - 70 m) * 70 m = overlap casing to liner
I109
mayol: Formula = Landing Collar (m) x Rate Stand-Up (min/std) 28 (m/std)] 60 min/jam Note : * Landing Collar (m) = (Shoe 7in - 20 m) * 20 m = shoetrack
I110
mayol: Formula = Landing Collar (m) x Rate Stand-Up (min/std) 28 (m/std)] 60 min/jam Note : * Landing Collar (m) = (Shoe 4.5in - 20 m) * 20 m = shoetrack
I111
mayol: Formula = Landing Collar (m) x Rate Stand-Up (min/std) 28 (m/std)] 60 min/jam Note : * Landing Collar (m) = (Shoe 4.5in - 20 m) * 20 m = shoetrack
I112
mayol: Formula = Landing Collar (m) x Rate RIH DP (min/std) 28 (m/std)] + 1 jam (set packer) 60 min/jam Note : * Landing Collar (m) = (Shoe 7in - 20 m) * 20 m = shoetrack
I113
mayol: Formula = Landing Collar (m) x Rate Std-Up (min/std) 28 (m/std)] + 1 jam (set packer) 60 min/jam Note : * Landing Collar (m) = (Shoe 7in - 20 m) * 20 m = shoetrack
I114
mayol: Formula = Landing Collar (m) x Rate RIH DP (min/std) 28 (m/std)] + 1 jam (set packer) 60 min/jam Note : * Landing Collar (m) = (Shoe 4.1/2in - 20 m) * 20 m = shoetrack
I115
mayol: Formula = Landing Collar (m) x Rate Std-Up (min/std) 28 (m/std)] + 1 jam (set packer) 60 min/jam Note : * Landing Collar (m) = (Shoe 4.1/2in - 20 m) * 20 m = shoetrack
I117
mAYoL: RIH Csg = Shoe depth (m) x Rate Csg (min/std) 28 (m/std)] 60 min/jam
I118
mAYoL: RIH Csg = Shoe depth (m) x Rate Csg (min/std) 28 (m/std)] 60 min/jam
I119
mAYoL: RIH Csg = Shoe depth (m) x Rate Csg (min/std) 28 (m/std)] 60 min/jam
I120
mAYoL: RIH Csg = Shoe depth (m) x Rate Csg (min/std) 28 (m/std)] 60 min/jam
I121
mAYoL: RIH Csg = Shoe depth (m) x Rate Csg (min/std) 28 (m/std)] 60 min/jam
I122
mAYoL: RIH Csg = Shoe depth (m) x Rate Csg (min/std) 28 (m/std)] 60 min/jam
I123
mAYoL: RIH Liner = Shoe depth - TOL(m) x Rate Csg (min/std) TOL (m) x Rate RIH DP (min/std) 9.5 (m/jts)] + 28 (m/std)] 60 min/jam 60 min/jam
I124
mAYoL: RIH Liner = Shoe depth - TOL(m) x Rate Csg (min/std) TOL (m) x Rate RIH DP (min/std) 9.5 (m/jts)] + 28 (m/std)] 60 min/jam 60 min/jam
Page 17: SMG-INFILL 533m.xlsx

#N/A 5.00 5.00#N/A 5.00 5.00#N/A 8.00 8.00#N/A 0.50 0.50

#N/A 0.000 2.00 2.000 0.00 0.00

200 0.42 1.00 1.42200 1.67 1.00 2.67150 1.09 1.41 2.50

0 -3.17 -3.17#N/A 2.38 2.38

#N/A 0.00

200 -0.77 -0.77

200 1.67 1.67

150 1.09 1.09

#N/A#N/A 8.00 8.00#N/A 12.00 12.00#N/A 2.00 2.00#N/A 2.00 2.00#N/A 1.00 1.00#N/A 24.00 24.00#N/A 5.00 1.00 6.00#N/A 24.00 24.00

72.00 72.000.000.00

120.00 120.000.000.000.000.00

I144
mAYoL: Short-Trip = Drill Depth - Prev Shoe (m) x Rate RIH DP (min/std) 28 (m/std) x 2 (POOH&RIH) 60 min/jam Note: Add time for clean the bit
I145
mAYoL: Short-Trip = Drill Depth - Prev Shoe (m) x Rate RIH DP (min/std) 28 (m/std) x 2 (POOH&RIH) 60 min/jam
I146
mAYoL: Short-Trip = Drill Depth - Prev Shoe (m) x Rate RIH DP (min/std) 28 (m/std) x 2 (POOH&RIH) 60 min/jam
I147
mAYoL: Short-Trip = Drill Depth - Prev Shoe (m) x Rate RIH DP (min/std) 28 (m/std) x 2 (POOH&RIH) 60 min/jam
I148
mAYoL: Short-Trip = Drill Depth - Prev Shoe (m) x Rate RIH DP (min/std) 28 (m/std) x 2 (POOH&RIH) 60 min/jam
I149
mAYoL: Short-Trip = Drill Depth - Prev Shoe (m) x Rate RIH DP (min/std) 28 (m/std) x 2 (POOH&RIH) 60 min/jam
I150
mAYoL: Wiper-Trip = Recomended Wiper Trip, 400 (m) x Rate RIH DP (min/std) 28 (m/std) x 2 (POOH&RIH) 60 min/jam
I152
mAYoL: Stand-Up time before RIH 17.1/2" Bit = 12.1/4" Depth - BHA length (m) x Rate Std-Up (min/std) 28 (m/std) 60 min/jam
I153
mAYoL: Stand-Up time before RIH 12.1/4" Bit = 8.1/2" Depth - Prev Shoe (m) x Rate Std-Up (min/std) 28 (m/std) 60 min/jam
I154
mAYoL: Stand-Up time before RIH 8.1/2" Bit = 6" Depth - Prev Shoe (m) x Rate Std-Up (min/std) 28 (m/std) 60 min/jam
Page 18: SMG-INFILL 533m.xlsx

FORMULA

V

V

V

V

V

V

V

V Rate 75 m/day karena sudah termasuk perhitungan loss time akibat atasi loss dan kick

V Rate 75 m/day karena sudah termasuk perhitungan loss time akibat atasi loss dan kick

V

Page 19: SMG-INFILL 533m.xlsx

V

V

V

V

V

V

V

V

V

V

V Include L/D some DP 5"

V

V

V

V

V

V

V

Page 20: SMG-INFILL 533m.xlsx

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

Page 21: SMG-INFILL 533m.xlsx

V

V

V

V

V

V

V

V

V

DATA CHARACTER : database3Drilling 36"Non Drilling 36" Non Drilling 36"Drilling 26"Non Drilling 26"Drilling 17.5"Non Drilling 17.5"Drilling 12.25"Non Drilling 12.25"Drilling 8.5"

Page 22: SMG-INFILL 533m.xlsx

Non Drilling 8.5"Drilling 6"Non Drilling 6"Cement Production CasingCompletion SessionProduction Test

DATA CHARACTER : database4PRE SPUD SESSION36" DRILLING SESSION26" DRILLING SESSION17.1/2" DRILLING SESSION12.1/4" DRILLING SESSION8.1/2" DRILLING SESSION6" DRILLING SESSIONCOMPLETION

DATA CHARACTER : 36 26

17 1/212 1/48 1/26

DATA CHARACTER : 36" OH26" OH

17.1/2" OH12.1/4" OH8.1/2" OH

6" OHCompletionNot Specific

Page 23: SMG-INFILL 533m.xlsx

Rate 75 m/day karena sudah termasuk perhitungan loss time akibat atasi loss dan kick

Rate 75 m/day karena sudah termasuk perhitungan loss time akibat atasi loss dan kick

Page 24: SMG-INFILL 533m.xlsx

PERTAMINA DRILLING ACTIVITIES CODE DESCRIPTION

IADC Code Description Sub code Description Status Details

1 Rig Up and Tear Down a Rig Upb Tear Down

2 Drilling Actual a Drill actual Bor formasi, Bor semen, Bor collarb SPRc MOT or LOT start from pressure testing line until job done

3 Reaming NPT at depth bit start taking weight until actial drilling depth4 Coring a Persiapan M/U tools

b Coring Job RIH coring tools, circulate, Coring Job, POOH, Job completed5 Circulation a Circulate Hole Clean condition mud before cementing, increase SG

b Condition Mud circulate before POOH6 Trips a Drilling BHA for RIH and POOH BHA drilling only

b Others BHA for others BHA example : scrapper, Open end, etcc Prepare BHAd Stand Up or L/D

7 Lubricate Rig8 Repair Rig NPT Rig repair (include Pull out BHA to shoe waiting for repair)9 Cut off Drilling Line10 Deviation Survey RIH totco or GYRO and POOH survey by sand line11 Wireline Logs a Persiapan M/U logging tools, wheels, PCE and pressure test

b Logs RIH logging tools, Log Up and POOH 12 Run Casing a Persiapan M/U casing running gears

b Run casing job RIH Casing to bottom13 Cement a Persiapan M/U cementing line, R/U cementing head, mixing additives, pressure test

b Cementing jobs start pumping spacer until bumping and bleed off.14 Wait on Cement No other job done in this phase15 N/U BOP & N/D BOP a N/U BOP & N/D BOP

b BOP TEST16 N/U Well Head a N/U Wellhead Cut off casing, welding, test etc17 DRIL STEM TEST a Persiapan M/U DST tools

b DST Job RIH DST tools, set packer, DST Job, POOH, Job completed18 Cement Plug Back start pumping spacer until before POOH.19 Squeeze Cement start pumping spacer until before POOH.20 Down hole Problem a combating loss NPT start pumping LCM pills, wait on reaction, etc. (if Using OE start from POOH bit and RIH OE)

b Gumbo problems NPT circulate gumbo outc pipe sticking NPT start pumping pipe freeing agent, wait on reaction, until pipe freed Fishing job NPT start running fishing tools until POOH (not incuded in trips because NPT)

Page 25: SMG-INFILL 533m.xlsx

e well control situation NPT start closing BOP, killing process unttil open BOP21 Surface Problem a Mud company NPT wait on material, tools, etc

b Cementing company NPT wait on material, tools, rig up tools too long, pressure test not successc Logging Company NPT wait on material, tools, rig up tools too long, pressure test not successd Directional company NPT wait on material, tools, rig up tools too long, shallow test not successe Top Drive NPT wait on material, tools, rig up tools too long, running test not successf Operator Material/tools NPT wait on Pertamina's material, tools, employee or labourg weather NPT wait due to bad weatherh location repair NPT wait due to bad location

22 Drills Fire drill, H2S drill, safety drill, BOP drill22 Others

NPT starts whenever normal operation cease and there is no drilling progress

REFERENCE : IADC CODE

Page 26: SMG-INFILL 533m.xlsx

Rig Up, including Stand-up 5" DP and 8" DC. 1a 120Rig Up Top Drive M/U BHA dan Bit 26". 1a 4836" DRILLING SESSION 0Drilling Formation 26" to Csg Point at 80 m, ROP 75 m/days 2a 25.6Circulate hole clean 5a 2Round Trip and clean the bit 6a 2Circulate hole clean and drop Survey. 5a 2POOH 26" Bit from Csg Point & L/D BHA 6a 0.2380952381Prepare casing handling tools to run 20" Conductor Casing 12a 1.5RIH Casing 20", incl. RIH Tubing, rate 7 mnt/std 12b 2.4824561404M/U Cementing Head. Circulate Condition Mud using Rig Pump 5b 2M/U Cementing Line. Continue mixing cement additives 13a 2Cement 20" casing (include POOH Tubing 2 7/8") 13b 4Wait On Cement 14 8Nipple Up Bottom Flange 20", (incl : welded & inspection) 16a 5Nipple Up Diverter 20". (incl : Welded & inspection) 15a 5Function Test Diverter 20" 15b 1

26" DRILLING SESSIONDrilling Formation 26" to Csg Point at 80 m, ROP 75 m/days 2a 2.7142857143Prepare Non Directional BHA + 17 1/2" Bit 6a 2RIH Bit 17 1/2" to tag TOC, rate 5 mnt/std 6a 1Circulate conditioning mud 5b 2Pressure Test Diverter 20" 15b 1Drilling Formation 17 1/2" to KOP at 110 m, ROP 200 m/days 2a 3.6Drilling Formation 17 1/2" to Csg Point at 656 m, ROP 200 m/days 2a 65.52Circulate hole clean at bottom 5a 2Short Trip condition hole for 17.5" Drilling 6a 3.4285714286Circulate hole clean and drop Survey. 5a 2POOH 17 1/2" Bit from Csg Point & L/D BHA 6a 1.9523809524Prepare casing handling tools to run 13 3/8" Casing 12a 1RIH Casing 13 3/8", rate 7 mnt/std 12b 8.0561403509M/U Cementing Head. Circulate Condition Mud using Rig Pump 5b 2M/U Cementing Line. Continue mixing cement additives 13a 2Cement 13.3/8" Casing 13b 4Wait On Cement 14 8Cut 20" casing and N/D Diverter 20" 15a 6Nipple Up Bottom Flange 13-5/8" (incl: cut excess casing, ) 16a 10Nipple Up BOP 13.5/8" x 5.000 psi 15a 8Pressure Test BOP 13.5/8" x 5.000 psi 15b 2

17.1/2" DRILLING SESSIONStand up 13 stands DP ( ± 361 m), Prepare for RIH 12.1/4", Rate 10 mnt/std 6d 2.125Prepare Directional BHA + 12 1/4" Bit 6a 2RIH Bit 12 1/4" to tag TOC, rate 5 mnt/std 6a 1.9523809524Drill out Plug, collar, cement, shoe and 2 mtrs of new formation. 2a 8Circulate conditioning mud 5b 2Mud Off Test 2c 1Drilling Formation 12.25" to Csg Point at 1013 m, ROP 200 m/days 2a 48.84Circulate hole clean at bottom 5a 2Short Trip condition hole for 12.25" Drilling 6a 2.125Circulate hole clean at bottom 5a 2POOH 12 1/4" Bit from Csg Point & L/D BHA 6a 3.0148809524

Page 27: SMG-INFILL 533m.xlsx

Prepare casing handling tools to run 9 5/8" Casing 12a 1RIH Casing 9 5/8", rate 7 mnt/std 12b 12.440350877M/U Cementing Head. Circulate Condition Mud using Rig Pump 5b 2M/U Cementing Line. Continue mixing cement additives 13a 2Cement 9.5/8" Casing 13b 5Wait On Cement 14 8Nipple Down BOP 13 5/8" x 5.000 psi 15a 4Nipple Up Casing Head Spool 11" 16a 4Nipple Up BOP 13.5/8" x 5.000 psi 15a 8Pressure Test BOP 13.5/8" x 5.000 psi 15b 2

12.1/4" DRILLING SESSIONStand up 13 stands DP ( ± 361 m), Prepare for RIH 8.1/2", Rate 10 mnt/std 6d 2.1488095238Prepare Non Directional BHA + 8 1/2" Bit 6a 2RIH Bit 8 1/2" to tag TOC, rate 5 mnt/std 6a 3.0148809524Drill out Plug, collar, cement, shoe and 2 mtrs of new formation. 2a 8Circulate conditioning mud 5b 2Mud Off Test 2c 1Drilling Formation 8.5" to Csg Point at 1374 m, ROP 200 m/days 2a 67.32Circulate hole clean at bottom 5a 2Short Trip condition hole for 8.5" Drilling 6a 2.5Circulate hole clean at bottom 5a 2POOH 8 1/2" Bit from Csg Point & L/D BHA 6a 4.0892857143Prepare logging tools 11a 1Run Logs : DSI-GR 11b 8Run Logs : LDL-CNL-GR 11b 5Run Logs : LDL-CNL-GR 11b 5

8.1/2" DRILLING SESSION0 00 00 00 00 00 00 00 00 00 00 00 00 0

6" DRILLING SESSION 0RIH 9-5/8" Scrapper to tag TOL 7" 6d 2.806547619POOH 9 5/8" Scrapper from TOL 7" & L/D BHA 6b 2.806547619RIH Bit 8 1/2" to condition hole to Bottom, rate 5 mnt/std 6a 4.0892857143Circulate hole clean 5a 2POOH 8 1/2" Bit from Csg Point & L/D BHA 6a 4.0892857143Prepare casing handling tools to run 7" Casing/Liner 12a 2RIH Liner 7" with DP, rate 7 mnt/std 12b 8.0995300752M/U Cementing Head. Circulate Condition Mud using Rig Pump 5b 2M/U Cementing Line. Continue mixing cement additives 13a 2Cement 7" Liner & Set Liner. 13b 6POOH and L/D 7" Liner setting tool 13b 3.880952381RIH Bit 8 1/2" to tag Top Liner 7", rate 5 mnt/std 6a 2.806547619Drill Out cement to top liner 7" 2a 1

Page 28: SMG-INFILL 533m.xlsx

Circulate hole clean 5a 2POOH 8 1/2" Bit from TOL 7" & L/D BHA 6a 2.806547619RIH Bit 6" + DP 3.1/2" to tag Landing Collar 7", rate 5 mnt/std 6a 8.0297619048Circulate hole clean 5a 2POOH 6" Bit from Landing Collar 7" & L/D BHA 6a 4.0297619048Rig Down Top Drive 6b 24Nipple Down BOP 13 5/8" x 5.000 psi 15a 4Nipple Up Tubing Head Spool 11" x 7-1/16" 16a 6Nipple Up BOP 7-1/16" x 5.000 psi 15a 6RIH 7" Scrapper w/ Tubing jts/jts to tag Landing Collar, Rate 10 min/jt 6d 8.0595238095Circulate and change over to Completion Fluid 5b 4POOH 7" Scrapper from Landing Collar 7" & L/D BHA 6b 4.0297619048Prepare logging tools 11a 1Run Logs : CBL-VDL-CET-CCL-GR 11b 6Prepare Perforation Tools 11a 2Perforation 11b 5RIH Prod String 2.7/8" Tubing to 7" Prod Csg, not joint/joint, incl. set packer 17a 5.0297619048Nipple Down BOP 7-1/16" x 5.000 psi 15a 6Nipple Up X-masstree 16a 6Production Test 17b 24

COMPLETIONRig Release & R/D Rig 0 72

Page 29: SMG-INFILL 533m.xlsx

31.00 TOTAL CSG CSG ACCSTBG WH

5 5 842,011.00 842,011.00 2 7 842,011.00 - 0 7 842,011.00 -

1.0666666667 8.0666666667 905,544.13 63,533.13 0.0833333333 8.15 909,990.08 4,445.95 0.0833333333 8.2333333333 914,436.02 4,445.95 0.0833333333 8.3166666667 918,881.97 4,445.95 0.0099206349 8.3265873016 919,411.25 529.28

0.0625 8.3890873016 922,745.71 3,334.46 0.1034356725 8.4925229741 989,987.21 67,241.49 58,503 3,220 0.0833333333 8.5758563074 994,433.15 4,445.95 0.0833333333 8.6591896408 998,879.10 4,445.95 0.1666666667 8.8258563074 1,038,844.16 39,965.06 0.3333333333 9.1591896408 1,056,627.95 17,783.79 0.2083333333 9.3675229741 1,067,742.82 11,114.87 0.2083333333 9.5758563074 1,078,857.69 11,114.87 0.0416666667 9.6175229741 1,081,080.66 2,222.97

9.6175229741 1,081,080.66 - 9.6175229741 1,081,080.66 -

0.1130952381 9.7306182122 1,087,114.45 6,033.79 0.0833333333 9.8139515455 1,091,560.40 4,445.95 0.0416666667 9.8556182122 1,110,757.37 19,196.97 0.0833333333 9.9389515455 1,115,203.32 4,445.95 0.0416666667 9.9806182122 1,117,426.29 2,222.97

0.15 10.130618212 1,125,429.00 8,002.71 2.73 12.860618212 1,305,787.64 180,358.64

0.0833333333 12.943951546 1,310,233.59 4,445.95 0.1428571429 13.086808688 1,317,855.21 7,621.62 0.0833333333 13.170142022 1,322,301.16 4,445.95 0.0813492063 13.251491228 1,326,641.25 4,340.09 0.0416666667 13.293157895 1,328,864.22 2,222.97 0.3356725146 13.628830409 1,474,447.11 145,582.89 123,742 3,932 0.0833333333 13.712163743 1,478,893.06 4,445.95 0.0833333333 13.795497076 1,483,339.01 4,445.95 0.1666666667 13.962163743 1,582,043.50 98,704.49 0.3333333333 14.295497076 1,599,827.29 17,783.79

0.25 14.545497076 1,613,165.13 13,337.84 0.4166666667 14.962163743 1,660,218.87 47,053.74 24,824 0.3333333333 15.295497076 1,678,002.66 17,783.79 0.0833333333 15.378830409 1,682,448.60 4,445.95

15.378830409 1,682,448.60 - 15.378830409 1,682,448.60 -

0.0885416667 15.467372076 1,687,172.42 4,723.82 0.0833333333 15.550705409 1,691,618.37 4,445.95 0.0813492063 15.632054616 1,710,573.46 18,955.09 0.3333333333 15.965387949 1,728,357.25 17,783.79 0.0833333333 16.048721282 1,732,803.20 4,445.95 0.0416666667 16.090387949 1,735,026.17 2,222.97

2.035 18.125387949 1,901,891.81 166,865.64 0.0833333333 18.208721282 1,906,337.76 4,445.95 0.0885416667 18.297262949 1,911,061.58 4,723.82 0.0833333333 18.380596282 1,915,507.53 4,445.95 0.1256200397 18.506216322 1,922,209.53 6,702.00

Page 30: SMG-INFILL 533m.xlsx

0.0416666667 18.547882989 1,924,432.50 2,222.97 0.5183479532 19.066230942 2,114,245.54 189,813.04 128,132 34,026 0.0833333333 19.149564275 2,118,691.49 4,445.95 0.0833333333 19.232897609 2,123,137.44 4,445.95 0.2083333333 19.441230942 2,245,073.96 121,936.53 0.3333333333 19.774564275 2,262,857.75 17,783.79 0.1666666667 19.941230942 2,271,749.65 8,891.89 0.1666666667 20.107897609 2,280,641.54 8,891.89 0.3333333333 20.441230942 2,298,425.33 17,783.79 0.0833333333 20.524564275 2,302,871.28 4,445.95

20.524564275 2,302,871.28 - 20.524564275 2,302,871.28 -

0.0895337302 20.614098005 2,307,648.03 4,776.75 0.0833333333 20.697431339 2,312,093.98 4,445.95 0.1256200397 20.823051378 2,329,576.98 17,483.00 0.3333333333 21.156384712 2,347,360.77 17,783.79 0.0833333333 21.239718045 2,351,806.71 4,445.95 0.0416666667 21.281384712 2,354,029.69 2,222.97

2.805 24.086384712 2,549,183.98 195,154.29 0.0833333333 24.169718045 2,553,629.93 4,445.95 0.1041666667 24.273884712 2,559,187.36 5,557.43 0.0833333333 24.357218045 2,563,633.31 4,445.95 0.1703869048 24.52760495 2,572,723.68 9,090.37 0.0416666667 24.569271617 2,574,946.66 2,222.97 0.3333333333 24.90260495 2,592,730.45 17,783.79 0.2083333333 25.110938283 2,603,845.32 11,114.87 0.2083333333 25.319271617 2,684,512.03 80,666.71

25.319271617 2,684,512.03 - 25.319271617 2,684,512.03 -

0 25.319271617 2,684,512.03 - 0 25.319271617 2,684,512.03 - 0 25.319271617 2,684,512.03 - 0 25.319271617 2,684,512.03 - 0 25.319271617 2,684,512.03 - 0 25.319271617 2,684,512.03 - 0 25.319271617 2,684,512.03 - 0 25.319271617 2,684,512.03 - 0 25.319271617 2,684,512.03 - 0 25.319271617 2,684,512.03 - 0 25.319271617 2,684,512.03 - 0 25.319271617 2,684,512.03 - 0 25.319271617 2,684,512.03 -

25.319271617 2,684,512.03 - 0 25.319271617 2,684,512.03 -

0.1169394841 25.436211101 2,690,750.91 6,238.88 0.1169394841 25.553150585 2,696,989.79 6,238.88 0.1703869048 25.72353749 2,706,080.16 9,090.37 0.0833333333 25.806870823 2,710,526.11 4,445.95 0.1703869048 25.977257728 2,719,616.49 9,090.37 0.0833333333 26.060591061 2,724,062.43 4,445.95 0.3374804198 26.398071481 2,836,702.19 112,639.76 68,135 26,500 0.0833333333 26.481404814 2,841,148.14 4,445.95 0.0833333333 26.564738147 2,845,594.08 4,445.95

0.25 26.814738147 2,924,968.17 79,374.09 0.1617063492 26.976444497 2,933,595.43 8,627.26 0.1169394841 27.093383981 2,939,834.31 6,238.88 0.0416666667 27.135050647 2,942,057.29 2,222.97

Page 31: SMG-INFILL 533m.xlsx

0.0833333333 27.218383981 2,946,503.23 4,445.95 0.1169394841 27.335323465 2,952,742.11 6,238.88 0.3345734127 27.669896878 2,973,337.06 20,594.95 0.0833333333 27.753230211 2,977,783.01 4,445.95

0.167906746 27.921136957 2,986,741.07 8,958.05 1 28.921136957 3,040,092.44 53,351.37

0.1666666667 29.087803624 3,048,984.33 8,891.89 0.25 29.337803624 3,062,322.17 13,337.84 0.25 29.587803624 3,075,660.02 13,337.84

0.3358134921 29.923617116 3,093,576.13 17,916.11 0.1666666667 30.090283782 3,102,468.02 8,891.89

0.167906746 30.258190528 3,111,426.08 8,958.05 0.0416666667 30.299857195 3,113,649.05 2,222.97

0.25 30.549857195 3,144,855.32 31,206.27 0.0833333333 30.633190528 3,149,301.27 4,445.95 0.2083333333 30.841523862 3,200,336.14 51,034.87 0.2095734127 31.051097274 3,247,524.41 47,188.27 29,109

0.25 31.301097274 3,260,862.25 13,337.84 0.25 31.551097274 3,293,551.10 32,688.84

1 32.551097274 3,719,526.70 425,975.60 32.551097274 3,719,526.70 - 32.551097274 3,719,526.70 -

3 35.551097274 4,144,558.00 425,031.30 -

4,144,558.00

4,144,558.00 0.00

Page 32: SMG-INFILL 533m.xlsx

5,687 715,105 339,661 X-TREE SS SURVEY LOKASI TELKOM WS MIRU RIG MUD

1,623 494,000 109,496 193,875

195.6757 24605.7634 11687.2715.28716 1922.32527 913.06797215.28716 1922.32527 913.06797215.28716 1922.32527 913.067972

1.8199 228.848246 108.69856811.46537 1441.74395 684.80097918.97486 2386.04408 1133.325615.28716 1922.32527 913.06797215.28716 1922.32527 913.06797230.57432 3844.65054 1826.1359461.14865 7689.30108 3652.2718938.21791 4805.81317 2282.6699338.21791 4805.81317 2282.669937.643581 961.162634 456.533986

0 0 00 0 0

20.74686 2608.87001 1239.1636815.28716 1922.32527 913.0679727.643581 961.162634 456.53398615.28716 1922.32527 913.0679727.643581 961.162634 456.53398627.51689 3460.18548 1643.52235500.8074 62975.3758 29912.106815.28716 1922.32527 913.06797226.20656 3295.41475 1565.2593815.28716 1922.32527 913.06797214.92318 1876.55562 891.3282587.643581 961.162634 456.53398661.57776 7743.26108 3677.9018715.28716 1922.32527 913.06797215.28716 1922.32527 913.06797230.57432 3844.65054 1826.1359461.14865 7689.30108 3652.2718945.86149 5766.97581 2739.2039276.43581 9611.62634 4565.3398661.14865 7689.30108 3652.2718915.28716 1922.32527 913.067972

0 0 00 0 0

16.24261 2042.4706 970.1347215.28716 1922.32527 913.06797214.92318 1876.55562 891.32825861.14865 7689.30108 3652.2718915.28716 1922.32527 913.0679727.643581 961.162634 456.533986373.3125 46943.1831 22297.119915.28716 1922.32527 913.06797216.24261 2042.4706 970.1347215.28716 1922.32527 913.06797223.04449 2897.79092 1376.39562

Page 33: SMG-INFILL 533m.xlsx

7.643581 961.162634 456.53398695.08883 11957.2004 5679.4429715.28716 1922.32527 913.06797215.28716 1922.32527 913.06797238.21791 4805.81317 2282.6699361.14865 7689.30108 3652.2718930.57432 3844.65054 1826.1359430.57432 3844.65054 1826.1359461.14865 7689.30108 3652.2718915.28716 1922.32527 913.067972

0 0 00 0 0

16.4246 2065.35542 981.00457715.28716 1922.32527 913.06797223.04449 2897.79092 1376.3956261.14865 7689.30108 3652.2718915.28716 1922.32527 913.0679727.643581 961.162634 456.533986514.5659 64705.4685 30733.867915.28716 1922.32527 913.06797219.10895 2402.90659 1141.3349615.28716 1922.32527 913.06797231.25679 3930.46863 1866.897917.643581 961.162634 456.53398661.14865 7689.30108 3652.2718938.21791 4805.81317 2282.6699338.21791 4805.81317 2282.66993

0 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 0

21.45207 2697.5487 1281.2843721.45207 2697.5487 1281.2843731.25679 3930.46863 1866.8979115.28716 1922.32527 913.06797231.25679 3930.46863 1866.8979115.28716 1922.32527 913.06797261.90942 7784.96566 3697.7107515.28716 1922.32527 913.06797215.28716 1922.32527 913.06797245.86149 5766.97581 2739.2039229.66437 3730.22641 1771.7866621.45207 2697.5487 1281.284377.643581 961.162634 456.533986

Page 34: SMG-INFILL 533m.xlsx

15.28716 1922.32527 913.06797221.45207 2697.5487 1281.2843761.37614 7717.90711 3665.8592115.28716 1922.32527 913.06797230.80181 3873.25657 1839.72326183.4459 23067.9032 10956.815730.57432 3844.65054 1826.1359445.86149 5766.97581 2739.2039245.86149 5766.97581 2739.2039261.60363 7746.51314 3679.4465330.57432 3844.65054 1826.1359430.80181 3873.25657 1839.723267.643581 961.162634 456.53398645.86149 5766.97581 2739.2039215.28716 1922.32527 913.06797238.21791 4805.81317 2282.66993

6,898 38.44539 4834.4192 2296.2572545.86149 5766.97581 2739.20392

19,351 45.86149 5766.97581 2739.20392183.4459 23067.9032 10956.8157

0

Page 35: SMG-INFILL 533m.xlsx

273,319 22,463 PAHAT eq rent dd ceent mlu oh cmt csh

6,625 9404.52346 772.92 734.728395 60.38 734.728395 60.38 734.728395 60.38 87.4676661 7.19 551.046296 45.29 911.965508 74.95 734.728395 60.38 734.728395 60.38 1469.45679 31,073 120.77 2938.91358 241.54 1836.82099 150.96 1836.82099 150.96 367.364198 30.19

0 - 0 -

997.131393 81.95 734.728395 60.38

16,974 367.364198 30.19 734.728395 60.38 367.364198 30.19 1322.51111 108.69 24069.7022 34,709 1,978.19 734.728395 60.38 1259.53439 103.52 734.728395 60.38 717.234862 58.95 367.364198 30.19 2959.53754 243.23 734.728395 60.38 734.728395 60.38 1469.45679 89,813 120.77 2938.91358 241.54 2204.18519 181.15 3673.64198 301.92 2938.91358 241.54 734.728395 60.38

0 - 0 -

780.64892 64.16 734.728395 60.38

14,615 717.234862 58.95 2938.91358 241.54 734.728395 60.38 367.364198 30.19 17942.0674 58,296 1,474.59 734.728395 60.38

780.64892 64.16 734.728395 60.38 1107.55932 91.03

Page 36: SMG-INFILL 533m.xlsx

367.364198 30.19 4570.13952 375.60 734.728395 60.38 734.728395 60.38 1836.82099 110,822 150.96 2938.91358 241.54 1469.45679 120.77 1469.45679 120.77 2938.91358 241.54 734.728395 60.38

0 - 0 -

789.395686 64.88 734.728395 60.38

10,781 1107.55932 91.03 2938.91358 241.54 734.728395 60.38 367.364198 30.19 24730.9578 45,504 2,032.54 734.728395 60.38 918.410494 75.48 734.728395 60.38 1502.25716 123.46 367.364198 30.19 2938.91358 241.54 1836.82099 150.96 1836.82099 150.96 69,552

0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 -

1031.02511 84.74 1031.02511 84.74 1502.25716 123.46 734.728395 60.38 1502.25716 123.46 734.728395 60.38 2975.47737 244.54 734.728395 60.38 734.728395 60.38 2204.18519 181.15 66,036 1425.72296 117.17 1031.02511 84.74 367.364198 30.19

Page 37: SMG-INFILL 533m.xlsx

734.728395 60.38 1031.02511 84.74

2,745 2949.84704 242.44 734.728395 60.38 1480.39025 121.67 8816.74074 724.61 1469.45679 120.77 2204.18519 181.15 2204.18519 181.15

2960.7805 243.33 1469.45679 120.77 1480.39025 121.67 367.364198 30.19 2204.18519 181.15 17,868 734.728395 60.38 1836.82099 150.96 39,920 1847.75445 151.86 2204.18519 181.15 2204.18519 181.15 8816.74074 724.61 414,784

Page 38: SMG-INFILL 533m.xlsx

30,812 266,845 spv solar

33,889 9,129

1,060.20 9,181.77 82.83 717.33 82.83 717.33 82.83 717.33 9.86 85.40 62.12 537.99 102.81 890.37 82.83 717.33 82.83 717.33 165.66 1,434.65 331.31 2,869.30 207.07 1,793.32 207.07 1,793.32 41.41 358.66 - - - - 112.41 973.51 82.83 717.33 41.41 358.66 82.83 717.33 41.41 358.66 149.09 1,291.19 2,713.45 23,499.60 82.83 717.33 141.99 1,229.70 82.83 717.33 80.86 700.25 41.41 358.66 333.64 2,889.44 82.83 717.33 82.83 717.33 165.66 1,434.65 331.31 2,869.30 248.48 2,151.98 414.14 3,586.63 331.31 2,869.30 82.83 717.33 - - - - 88.00 762.16 82.83 717.33 80.86 700.25 331.31 2,869.30 82.83 717.33 41.41 358.66 2,022.67 17,517.10 82.83 717.33 88.00 762.16 82.83 717.33 124.86 1,081.33

Page 39: SMG-INFILL 533m.xlsx

41.41 358.66 515.21 4,461.89 82.83 717.33 82.83 717.33 207.07 1,793.32 331.31 2,869.30 165.66 1,434.65 165.66 1,434.65 331.31 2,869.30 82.83 717.33 - - - - 88.99 770.70 82.83 717.33 124.86 1,081.33 331.31 2,869.30 82.83 717.33 41.41 358.66 2,788.00 24,145.20 82.83 717.33 103.54 896.66 82.83 717.33 169.35 1,466.68 41.41 358.66 331.31 2,869.30 207.07 1,793.32 207.07 1,793.32 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 116.23 1,006.60 116.23 1,006.60 169.35 1,466.68 82.83 717.33 169.35 1,466.68 82.83 717.33 335.43 2,905.00 82.83 717.33 82.83 717.33 248.48 2,151.98 160.73 1,391.95 116.23 1,006.60 41.41 358.66

Page 40: SMG-INFILL 533m.xlsx

82.83 717.33 116.23 1,006.60 332.55 2,879.98 82.83 717.33 166.89 1,445.33 993.94 8,607.91 165.66 1,434.65 248.48 2,151.98 248.48 2,151.98 333.78 2,890.65 165.66 1,434.65 166.89 1,445.33 41.41 358.66 248.48 2,151.98 82.83 717.33 207.07 1,793.32 208.30 1,803.99 248.48 2,151.98 248.48 2,151.98 993.94 8,607.91

2,678 89,488