Page 1: Slomin Foundation & School of Autism Campus

ARCHITECTURE URBAN DESIGN PLANNING INTERIORS

The Palm Beach County

Sandra C. SlominSchool & Foundation for Autism3005 S Congress Ave. Boynton Beach, Fl.

Master Plan & Facility Design

Page 2: Slomin Foundation & School of Autism Campus

July 2, 2009 2OCAMPO & ASSOCIATES

Autism is a brain development disordercharacterized by impaired social interactionand communication, and by restricted and repetitive behavior.

Page 3: Slomin Foundation & School of Autism Campus

July 2, 2009 3OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME B

Page 4: Slomin Foundation & School of Autism Campus

July 2, 2009 4OCAMPO & ASSOCIATES

Existing Boynton Beach Site

Page 5: Slomin Foundation & School of Autism Campus

July 2, 2009 5OCAMPO & ASSOCIATES

PROGRAM REQUIREMENTS:• SCHOOL FACILITY (MAX 200 STUDENTS) 25,000 SF• SLOMIN FOUNDATION HEADQUARTERS FACILITY 25,000 SF• GYMNASIUM BUILDING 8,500 SF• NATATORIUM BUILDING 6,000 SF• OUTDOOR FIELDS TBD• TOTAL 54,500 SF

FACILITIES PROVIDED:• SCHOOL FACILITY (MAX 200 STUDENTS) 35,198 SF• SLOMIN FOUNDATION HEADQUARTERS FACILITY 26,258 SF• GYMNASIUM BUILDING 8,500 SF• NATATORIUM BUILDING 6,000 SF• OUTDOOR FIELDS TBD• TOTAL 61,456 SF

Page 6: Slomin Foundation & School of Autism Campus

July 2, 2009 6OCAMPO & ASSOCIATES

The CONCEPT AnalysisBefore 159 Parking Spaces Requirement

Page 7: Slomin Foundation & School of Autism Campus

July 2, 2009 7OCAMPO & ASSOCIATES

The CONCEPT AnalysisPlus 159 Parking Spaces +/-

Page 8: Slomin Foundation & School of Autism Campus

July 2, 2009 8OCAMPO & ASSOCIATES

The Master Plan CONCEPTAlternative A

Page 9: Slomin Foundation & School of Autism Campus

July 2, 2009 9OCAMPO & ASSOCIATES

The Master Plan CONCEPTAlternative B

Page 10: Slomin Foundation & School of Autism Campus

July 2, 2009 10OCAMPO & ASSOCIATES

The Master Plan CONCEPT (Alternative C)

Page 11: Slomin Foundation & School of Autism Campus

July 2, 2009 11OCAMPO & ASSOCIATES

The Master Plan CONCEPT B

The Campus Design Concept Must:• Address the Uniqueness of the Autism School Program. • Address the Uniqueness of the Autism Campus Concept (One Stop

Shop) & the Connectivity of its functions.• Address the Need to Introduce Natural Light as a “special” benefit to

the Occupants.• Address the special spatial and orientation needs created by ASD.• Address Constraint of a “tight” site which must accommodate the very

high parking count required due to the unique teacher / student ratio.• Address the desire to develop a Concept that is environmentally

sensitive, sustainable (based on cost / benefit) and be “GREEN”. • Be capable of raising the community awareness (if not “national”

awareness) of ASD.

Page 12: Slomin Foundation & School of Autism Campus

July 2, 2009 12OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME B

PLAY FIELDS

SCHOOL HOUSE

SLOMIN FOUNDATION

GYM

NATATORIUM

FOUNDATIONPLAZA

PARENT DROP OFF

Page 13: Slomin Foundation & School of Autism Campus

July 2, 2009 13OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME C

PLAY FIELDS SCHOOL

HOUSE

SLOMIN FOUNDATION

SLOMIN FOUNDATION

OVERGYM

FOUNDATIONPLAZA

PARENT DROP OFF

Page 14: Slomin Foundation & School of Autism Campus

July 2, 2009 14OCAMPO & ASSOCIATES

PHASE 1 PLANS

Page 15: Slomin Foundation & School of Autism Campus

July 2, 2009 15OCAMPO & ASSOCIATES

FUNCTIONAL DIAGRAM

Page 16: Slomin Foundation & School of Autism Campus

July 2, 2009 16OCAMPO & ASSOCIATES

Page 17: Slomin Foundation & School of Autism Campus

July 2, 2009 17OCAMPO & ASSOCIATES

Page 18: Slomin Foundation & School of Autism Campus

July 2, 2009 18OCAMPO & ASSOCIATES

Page 19: Slomin Foundation & School of Autism Campus

July 2, 2009 19OCAMPO & ASSOCIATES

PHASE 1 ELEVATIONS

Page 20: Slomin Foundation & School of Autism Campus

July 2, 2009 20OCAMPO & ASSOCIATES

Page 21: Slomin Foundation & School of Autism Campus

July 2, 2009 21OCAMPO & ASSOCIATES

Page 22: Slomin Foundation & School of Autism Campus

July 2, 2009 22OCAMPO & ASSOCIATES

Page 23: Slomin Foundation & School of Autism Campus

July 2, 2009 23OCAMPO & ASSOCIATES

Page 24: Slomin Foundation & School of Autism Campus

July 2, 2009 24OCAMPO & ASSOCIATES

PHASE 1 RENDERINGS

Page 25: Slomin Foundation & School of Autism Campus

July 2, 2009 25OCAMPO & ASSOCIATES

School House Building SCHEME B

Page 26: Slomin Foundation & School of Autism Campus

July 2, 2009 26OCAMPO & ASSOCIATES

Cross Section SCHEME B

Page 27: Slomin Foundation & School of Autism Campus

July 2, 2009 27OCAMPO & ASSOCIATES

Transverse Section SCHEME B

Page 28: Slomin Foundation & School of Autism Campus

July 2, 2009 28OCAMPO & ASSOCIATES

Cross Section SCHEME B

Page 29: Slomin Foundation & School of Autism Campus

July 2, 2009 29OCAMPO & ASSOCIATES

Detail at Atrium SpaceSCHEME B

Page 30: Slomin Foundation & School of Autism Campus

July 2, 2009 30OCAMPO & ASSOCIATES

PHASE 2 ELEVATIONS

Page 31: Slomin Foundation & School of Autism Campus

July 2, 2009 31OCAMPO & ASSOCIATES

Page 32: Slomin Foundation & School of Autism Campus

July 2, 2009 32OCAMPO & ASSOCIATES

PHASE 2 MASTER PLAN

Page 33: Slomin Foundation & School of Autism Campus

July 2, 2009 33OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME B

Page 34: Slomin Foundation & School of Autism Campus

July 2, 2009 34OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME B

Page 35: Slomin Foundation & School of Autism Campus

July 2, 2009 35OCAMPO & ASSOCIATES

PHASE 2 RENDERINGS

Page 36: Slomin Foundation & School of Autism Campus

July 2, 2009 36OCAMPO & ASSOCIATES

School House Entrance SCHEME B

Page 37: Slomin Foundation & School of Autism Campus

July 2, 2009 37OCAMPO & ASSOCIATES

Campus Entrance SCHEME B

Page 38: Slomin Foundation & School of Autism Campus

July 2, 2009 38OCAMPO & ASSOCIATES

View of Entry Plaza SCHEME B

Page 39: Slomin Foundation & School of Autism Campus

July 2, 2009 39OCAMPO & ASSOCIATES

Cross Section of Foundation Building SCHEME B

Page 40: Slomin Foundation & School of Autism Campus

July 2, 2009 40OCAMPO & ASSOCIATES

View of Natatorium Building SCHEME B

Page 41: Slomin Foundation & School of Autism Campus

July 2, 2009 41OCAMPO & ASSOCIATES

Cross Section of Natatorium Building SCHEME B

Page 42: Slomin Foundation & School of Autism Campus

July 2, 2009 42OCAMPO & ASSOCIATES

Cross Section of Natatorium & Gym Building SCHEME B

Page 43: Slomin Foundation & School of Autism Campus

July 2, 2009 43OCAMPO & ASSOCIATES

View of Natatorium Building SCHEME B

Page 44: Slomin Foundation & School of Autism Campus

July 2, 2009 44OCAMPO & ASSOCIATES

View of Natatorium Building SCHEME B

Page 45: Slomin Foundation & School of Autism Campus

July 2, 2009 45OCAMPO & ASSOCIATES

Cross Section of Gymnasium Building SCHEME B

Page 46: Slomin Foundation & School of Autism Campus

July 2, 2009 46OCAMPO & ASSOCIATES

Rear View of Foundation Building SCHEME B

Page 47: Slomin Foundation & School of Autism Campus

July 2, 2009 47OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME B

Page 48: Slomin Foundation & School of Autism Campus

July 2, 2009 48OCAMPO & ASSOCIATES

ALTERNATE MASTER PLAN

Page 49: Slomin Foundation & School of Autism Campus

July 2, 2009 49OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME C

PLAY FIELDS SCHOOL

HOUSE

SLOMIN FOUNDATION

SLOMIN FOUNDATION

OVERGYM

FOUNDATIONPLAZA

PARENT DROP OFF

Page 50: Slomin Foundation & School of Autism Campus

July 2, 2009 50OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME C

Page 51: Slomin Foundation & School of Autism Campus

July 2, 2009 51OCAMPO & ASSOCIATES

View of Entry Plaza SCHEME C

Page 52: Slomin Foundation & School of Autism Campus

July 2, 2009 52OCAMPO & ASSOCIATES

View of Natatorium & Gym SCHEME C

Page 53: Slomin Foundation & School of Autism Campus

July 2, 2009 53OCAMPO & ASSOCIATES

Cross Section of Natatorium & Gym SCHEME C

Page 54: Slomin Foundation & School of Autism Campus

July 2, 2009 54OCAMPO & ASSOCIATES

View of Rear of CampusSCHEME C

Page 55: Slomin Foundation & School of Autism Campus

July 2, 2009 55OCAMPO & ASSOCIATES

MASTER PLANRECOMMENDATION

Page 56: Slomin Foundation & School of Autism Campus

July 2, 2009 56OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME B

Page 57: Slomin Foundation & School of Autism Campus

ARCHITECTURE URBAN DESIGN PLANNING INTERIORS

This Presentation and its Content are the property of OCAMPO & ASSOCIATES, INC. and are protected by common copyright

law. No portion of this presentation may be reproduced in part or in its entirety without the written permission of

OCAMPO & ASSOCIATES, INC.