SHIPLEY’S CHOICE DAM REHABILITATION PROJECT
Shipley’s Choice Elementary School September 13, 2018
Larry Mathena – Project Manager Anne Arundel County Dept. of Public Works
Preconstruction Community Meeting
DPWandYOU.com | Making a difference, together
Agenda
2
1. Project Background
2. Preconstruction Activities
3. Construction Phases & Features
4. Road Closure
5. Planting Plan
6. Construction Schedule
7. Project Updates
8. Questions * Please sign in & grab a handout
DPWandYOU.com | Making a difference, together
Project Background – Shipley’s Dam
3 • Dam built in 1981
• Seepage & Settlement Issues
• MDE deemed dam unsafe & directs County to remove
• County worked w/ JMT to complete design for Dam Removal
• Construction Contract awarded to Paydirt
DPWandYOU.com | Making a difference, together
Preconstruction Activities – Overhead Line Relocation on West Benfield Road
4 • Temp. Relocate OH Line around New Culvert
• Street light relocated (Pole to be removed)
• BGE, Comcast, Verizon to relocate lines
• OH lines replaced after Culvert construction
DPWandYOU.com | Making a difference, together
Construction Phases
5
Phase 1 Culvert Replacement
Phase 2 Shipley’s Dam Removal
• Construction in 2 Phases
• Zoning - R2 - OS
DPWandYOU.com | Making a difference, together
Phase 1 – Stream Diversion + Erosion & Sediment Control
• Place ESC Features
• Install stream diversion
DPWandYOU.com | Making a difference, together
Phase 1 – Public Utility Relocations Gas, Water, Force Main, Sanitary/Storm Sewers
• Utility Bypasses
• No interruption in service
• Existing/New Culverts in Red
DPWandYOU.com | Making a difference, together
Phase 1 – Remove Ex. Culvert + Install New Culvert
New 7’x10’ Concrete Box
Culvert
DPWandYOU.com | Making a difference, together
Phase 1 – New Culvert Profile
DPWandYOU.com | Making a difference, together
Pile Driving & Preconstruction Home Surveys
10 • Home surveys conducted by County’s contractor Seismic Surveys
• Preconstruction survey of homes and other structures – Document existing conditions
• Post-construction survey also conducted
• Need pre/post surveys to help determine if damage occurred during construction
Pile Driving for Culvert • Required due to soft subsoil • 78 Concrete Piles to be used • Daytime work only • Vibration levels will be monitored
DPWandYOU.com | Making a difference, together
Phase 1 – In Stream Work + Grading
DPWandYOU.com | Making a difference, together
12
Road Closed between Pixie Dr & Severnside Dr
Phase 1 Road Closure Detour Plan
• W Benfield Road closed 6+ months
• Sign posted 2 weeks before closing
• Paydirt proposing change to Precast Culvert – Could save time
• County Traffic Engineer will consider signal changes (will monitor traffic during construction)
DPWandYOU.com | Making a difference, together
• Install Filter Logs + Silt Fence
• Install Haul Road down to stream
• Begin removal of dam embankment
Phase 2 Dam Removal
Oak Stump Dr Cul-de-Sac
Shipley’s Choice Dam
DPWandYOU.com | Making a difference, together
Phase 2 Dam Removal
• Earth fill from Dam placed along east hillside
• Drain along slope to intercept runoff
• Bear Branch channel reestablished after outlet pipe removal
DPWandYOU.com | Making a difference, together
Phase 1 & 2 – Planting Plan
• Seed & Plant disturbed areas
• 141 Trees
• 493 Shrubs
• 1676 Live Stakes
DPWandYOU.com | Making a difference, together
Tentative Construction Schedule
16 • Oct 2018 Ph 1 Construction begins w/ Erosion & Sediment Control Utility Relocations/Road Closure
• Winter Ph 1 Culvert Installation
• Spring 2019 Ph 1 Culvert completed/Road Opened
• Summer Ph 2 Dam removal begins
• Late Fall 2019 Ph 2 Construction complete
* Paydirt will provide Construction Schedule by late Sep
DPWandYOU.com | Making a difference, together
Project Updates
17 • Monthly Updates on the Shipley’s Dam Project are emailed to the following HOAs & Organizations:
- Shipley’s Choice HOA & Community Assoc, Greater Severna Park Council, Point Field Landing Community Assoc, Crain West, Ben Oaks/Severn River Assoc
• Monthly Project Update will include: - Updated construction schedule, latest activities, road closure updates
• Project Updates may also be found on the County’s Website - For web address, see Handout
DPWandYOU.com | Making a difference, together
Contact Info (on Handout)
Larry Mathena Project Manager Watershed Protection and Restoration Program Anne Arundel County Department of Public Works 2662 Riva Road, MS 7217 Annapolis, MD 21401 (410) 222-7908 [email protected]
Alternate POC: Greg LeBlanc Same Address (410) 222-0043 [email protected]
DPWandYOU.com | Making a difference, together
Questions or Comments? 19
DPWandYOU.com | Making a difference, together
Bureau of Utility Operations
24-Hour Emergency Water Services: (410) 222-8400 Billing Inquiries: (410) 222-1144
Bureau of Waste Management Services
Bulk Trash Service/Curbside Collections: (410) 222-6100
Bureau of Highways
Northern District: (410) 222-6120 Central District: (410) 222-7940 Southern District: (410) 222-1933 Traffic Lights/Signs: (410) 222-1940
Bureau of Engineering
General Inquiries: (410) 222-7500