Lantern: Philips Iridium SGS254 - PTLantern Optic: GB OR P2 Tilt: 5 DegreesColumn: 10m Stepped Tubular SteelLamp: 100W Son-T+Control: Telensa

Quantity22

Lantern: Philips Iridium SGS253Lantern Optic: GB OR P2 Tilt: 5 DegreesColumn: 10.0m Stepped Tubular SteelBracket: 1.0mLamp: 100W Son-T+Control: Telensa

Quantity13

10I

Lantern: Philips Iridium SGS253Lantern Optic: GB OR P2 Tilt: 5 DegreesColumn: 10.0m Stepped Tubular SteelBracket: 1.0mLamp: 150W Son-T+Control: Telensa

Quantity72

10J

Lantern: Philips Iridium SGS254 - PTLantern Optic: GB OR P2 Tilt: 5 DegreesColumn: 10m Stepped Tubular SteelLamp: 150W Son-T+Control: Telensa

Quantity30

10J

DTC Column & Lantern to remain(recent installed scheme)

Lantern: Philips Iridium SGS253Lantern Optic: n/a Tilt: 5 DegreesColumn: 10.0m Stepped Tubular SteelBracket: 1.5mLamp: n/aControl: Telensa

Quantity25

DTC Column & Lantern to remain(recent installed scheme)

Lantern: Philips Iridium SGS253 - PTLantern Optic: n/a Tilt: 5 DegreesColumn: 10.0m Stepped Tubular SteelLamp: n/aControl: Telensa

Bollard: Non-Illuminated ReflectiveFace: Plain/OpalQuantity

6

P

DTC solar powered bollard to remainQuantity

14

B

Solar Powered BollardFace: Keep LeftQuantity

15

L

DTC Lantern Swap OnlyIlluminated Centre Island BeaconColumn: 4.0m Stepped Tubular SteelLantern: Moducic White 24VLamp: LED

Quantity1

Lantern: Philips Mini Iridium SGS451 - PTLantern Optic: FG OC IT1 P1 Tilt: 10 DegreesColumn: 6.0m Stepped Tubular SteelLamp: 45W CPO-TWControl: Telensa

Quantity1

6C

~ Sheet 5 of 5

7200-1425-V21

06/11/14DM 1:500 @ A2NB

Hills Road,Milestone 7Sheet 5 of 5

COPYRIGHT RESERVED BALFOUR BEATTY LIVING PLACES IS THE OWNER OFTHE COPYRIGHT SUBSISTING IN THESE DRAWINGS, PLANS, DESIGNS ANDSPECIFICATIONS. THEY MUST NOT BE USED, REPRODUCED OR COPIED, INWHOLE OR IN PART, NOR MAY THE INFORMATION, IDEAS AND CONCEPTSTHEREIN CONTAINED (WHICH ARE CONFIDENTIAL TO BALFOUR BEATTYLIVING PLACES) BE DISCLOSED TO ANY PERSON WITHOUT THE PRIORSPECIFIC WRITTEN CONSENT OF BALFOUR BEATTY LIVING PLACES.

Drawing no.

Designer Date of issue

Checked

Issue Revision

Scheme Name and Ward:

Sheet Size ScaleAuthorised

Streets on drawing:

WARNING - THERE ARE BURIED SERVICES WITHIN THISSCHEME. REFER TO DIG PACK PRIOR TO REMOVAL /INSTALL AND ENSURE DIG PACK CONTAINS ALL THEINFORMATION

Notes

PRELIMINARY ORIG.

PTA2

DIMMING REGIMEx TRAFFIC ROUTE TWO STEP DIMMING- 20:00 TO 24:00 DIM TO ONE LIGHTING CLASS; to 75%- 24:00 TO 06:00 DIM TO TWO LIGHTING CLASSES to 50%

All lighting column positionsmarked on site are indicative only

Cambridge 1425,Cambridge

Lantern: Philips Iridium SGS254 - PTLantern Optic: GB OR P2 Tilt: 5 DegreesColumn: 10m Stepped Tubular SteelLamp: 100W Son-T+Control: Telensa

Quantity8

DTC solar powered bollard to remainQuantity

3

B

D Disconnection of DNO SupplyN New Connection of DNO Supply

T Transfer of DNO Supply

ET Extra Transfer of DNO Supply

Tree

Design Notes

1. ME2/ME3a (Traffic Route) Lighting Design

Spacing CalculationRoad Calculation 1Road Width (13m) MaxOpposites 42.5mSet back (3.0m)

Road Calculation 3Road Width (11m) MaxOpposites 42.0mSet back (1.5m)See Area Calculation: Addenbrooks RAB displaced, Hills Rd JuncLong Rd, Hills Rd Rail Bridge, Hills Road Cherry Junc, Hills RoadEast Cherry Trans, Hills Road Nth from Stn Rd & Hills Road Sthfrom Stn Rd

Spacing CalculationRoad Calculation 2Road Width (13m) MaxOpposites 43.0mSet back (0.8m)

10I

Existing Non DTC Lighting Column To Be Removed ForRecycling

Quantity9

Existing Bollard to Remain and Does Not Form Part ofThis Design

Sheets 1-5 Materials totals

40.0m  6.0mm²  3c  Cu  XLPE/SWA/PVCNew  LA  Cable  tobe Installed in Orange Duct

LA LA

40.0m  6.0mm²  3c  Cu  XLPE/SWA/PVCNew  LA  Cable  tobe Installed in Orange Duct

LA LA

Quantity6

C:\D

ocum

ents

and

Set

tings

\pet

er.te

arse

\My

Doc

umen

ts\M

y P

ictu

res\

Exi

st S

ched

142

5 2.

bmp

C:\D

ocum

ents

and

Set

tings

\pet

er.te

arse

\My

Doc

umen

ts\M

y P

ictu

res\

prop

osed

sch

ed 1

425

3.bm

p

Recommended