Guidelines for Implementation of the
Scheme Setting up of New Mini ToolRooms (MTRs) under Public Private
Partnership (PPP) Mode(NMCP Component)
Development Commissioner (MSME)
Government of IndiaMinistry of Micro, Small and Medium
Enterprises
7/31/2019 Setting Up of New Mini Tool Rooms 31
2/49
1. Overview
(a) Manufacturing has been recognized as the main engine for
growth of the economy. In order to achieve a GDP growth of
9%, the manufacturing sector has to grow at 12%. The
Micro, Small and Medium Enterprises (MSME) sector,
comprising of 114 lakh units has been a significant
contributor to the manufacturing by accounting for nearly
40% of total industrial production.
(b) To achieve a sustained rate of growth, the manufacturing
sector needs to build and maintain competitiveness needed to
face the challenges posed by globalisation.
(c) Tooling has been recognized as the backbone of the
manufacturing sector and enhancement of tooling facilities
will give a fillip to the sector especially the MSME sector which
lacks the capacity to set up these facilities in-house.
(d) With this view, Government of India has established 10 state
of the art Tool Room & Training Centres. The Government
also assisted State Governments to set up Mini Tool Rooms
on a cost-sharing basis. These Tool Rooms are highly
proficient in tool & die making technologies and promote
precision as well as quality in the development and
manufacture of sophisticated tools, moulds and the like.
(e) However the facilities are not enough to cope up with the
ever increasing demand for tooling as well as skilled
manpower; hence National Manufacturing Competitiveness
Programme, initiated by National Manufacturing
Competitiveness Commission aims to extend support to the
private sector to set up Mini Tool Rooms and training centres,
7/31/2019 Setting Up of New Mini Tool Rooms 31
3/49
which is expected to result in improved competitiveness of
the sector.
(f) It is in this context that this Scheme is being launched.
2. The Scheme
(a) The Scheme termed as Setting up of New Mini Tool Rooms
(MTRs) under Public Private Partnership (PPP) Mode is a
Central Sector Scheme and would be implemented during 11th
Five year plan.
(b) The Scheme will be implemented on a Public Private
Partnership mode and Government would provide funds to
meet a part of the Project cost, the extent of which would bedetermined through a competitive bidding process. Towards
this purpose, the Government will invite proposals for specific
Projects, based on needs and identified through a survey in
that regard.
3. Objectives
(a) To improve the competitiveness of the MSMEs engaged in
manufacturing activity by creating capacities in the private
sector for designing and manufacturing quality tools.
(b) To bridge the gap between the demand and the supply of
trained manpower in the industry.
(c) To encourage research and development, and optimization of
cost and quality of delivery, leading to enhanced
competitiveness of the manufacturing sector.
4. Implementation
7/31/2019 Setting Up of New Mini Tool Rooms 31
4/49
The scheme will be implemented in the following three models
in order of preference.
(i) Model-I (Centre PPP Model):
Projects to be set up and operated by Private Partner
(individual, company, association, NGO/society). The financial
assistance will be given to meet the viability gap on a case-
to-case basis and it will be restricted to 40% of the project
cost (not exceeding Rs. 9 crore). The remaining resources will
be required to be arranged by the Project Sponsor through
equity, borrowings from Banks / Financial Institutions and
other sources.
(ii)Model-II (State PPP Model):
Projects to be set up by State Governments in cooperation
with NGOs (SPVs) who will run the projects on mutually
agreed terms. The financial assistance will be equal to 90%
of the cost of machinery, restricted to Rs. 9 crore. However,
in order to retain a say in the management, atleast 26% of
the share should be with State Government. The remaining
cost of machinery, land & building, recurring cost, any other
cost etc will be borne by the SPV. This Model would be
resorted to only when it is not viable to establish a Mini
Tool Room under Model-I.
(iii) Model-III (Centre State Model):
Projects to be set up and managed by State Government/
State Government Agencies. The financial assistance will be
equal to 90% of the cost of machinery, restricted to Rs. 9
crore for setting up new Mini Tool Rooms. The financial
assistance equal to 75% of the cost of the machinery,
restricted to Rs. 7.50 crore, can also be sanctioned for
7/31/2019 Setting Up of New Mini Tool Rooms 31
5/49
upgradation of an existing State Tool Room. The remaining
cost of machinery, land & building, recurring cost, any other
cost etc will be borne by the State Government/ State
Government Agency. This model would be resorted to
only where both the Model-I and Model-II fail.
In view of decision of Government of India to prefer Model I vis--vis Model II & III, the present guidelines have been framed
for Model I. For Model II & III the procedure/ guidelines followed for earlier Mini Tool Room scheme will be followed.
5. Coverage and Eligibility
(a) The Scheme is intended to maximise the availability of tooling
services and training facilities to enhance competitiveness of
MSMEs. Accordingly the Government will encourage a group
of MSMEs to come together to set up MTR. Individual service
providers can also qualify for assistance.
(b) Setting up of Mini Tool Room or training centre for captive
consumption will not be eligible for funding assistance.
(c) Assistance under the Scheme will be available to a Special
Purpose Vehicle termed as Project Company for the purpose of
the Scheme, established for the purpose of setting up a Mini
Tool Room and constituted as a distinct legal entity by private
sector sponsors. The Project Company may be a distinct legal
entity formed by any of the following:
i. Individual enterprises
ii. Consortium of enterprises
iii. Industry Association
iv. Enterprise(s)/ Industry Association jointly with the State
Government.
(d) At the time of bidding, the applicant may be a person/ group of
persons as described under this clause. However, upon
7/31/2019 Setting Up of New Mini Tool Rooms 31
6/49
selection as a successful bidder, the applicant must form a
Project Company as described under (e) below.
(e) The Project Company will ordinarily be a privately sponsored
and controlled Company registered under Companies act 1956,
with at least 51% of the subscribed and paid up equity brought
in by entities from the private sector. Any other structure will
be subject to the approval by the Project Monitoring Committee
(PMC).
(f) The Project Sponsors constituting the Project Company should
preferably be from the manufacturing value chain and should
be able to demonstrate experience in the tool room and related
industry.
(g) The assistance under the Scheme will be available for a
Project, to be established for development of MSMEs in
general, covering the following two sets of interventions:
i. Tool Room facilitiesii. Tool room related training facilities
(h) Subject to the approval of PMC, the tool room may meet any
of the other felt needs of the cluster enterprises it wishes to
cater to, that will enable the cluster enterprises in improving
their competitiveness such as designing, research &
development, consultancy services etc.
(i) The Projects proposed to be taken up under the Scheme will
benefit a significant number of enterprises, primarily MSMEs in
the cluster.
7/31/2019 Setting Up of New Mini Tool Rooms 31
7/49
6. Financial Assistance
(a) Each of the Projects to be considered for assistance under the Scheme will be
eligible for grant funding upto a maximum of 40% of the Project cost not exceeding
Rs.9.00 crore.
(b) The actual extent of assistance within the overall limits will be
determined based on lowest grant support i.e. minimum
percentage of project cost requested by the private entity/s
sponsoring the Project, in response to Request for Proposal to be
floated by the Government in this regard.
(c) Project cost for the purpose of the Scheme will mean the cost of
land; civil works; plant & machinery; and preliminary and pre-
operative expenses. However the aggregate cost of land and civil
works shall not exceed 25% of the Project cost.
(d) In determining the Project cost, the following guidelines will be
applied:
(i) If the land is provided by the State Government or its
agencies, corporate or otherwise, the value of land to be
considered for arriving at the cost of the Project for
determining grant assistance will be the circle rate as per
Government records.
(ii) If the land is brought in by the Project Company (whether
acquired in the past, or currently), the actual transaction
value or Government circle rate, whichever is less, will beconsidered in the Project cost.
(iii) If the building is provided by the Government free of cost
or at subsidised value, in arriving at the Project cost, the
7/31/2019 Setting Up of New Mini Tool Rooms 31
8/49
actual cost paid by the promoter to the Government will be
considered.
(iv) If the Project avails of any capital grant/ subsidy of the
Government under any other Scheme, the same will be
added to the amount of grant, in evaluation of bids.
(e) The Project Company shall meet escalations, if any in the Project cost from its
own sources. No additional grant from Government of India would be made
available.
7. Sources of Funds
(a) Project Sponsors contribution should be at least 15% of the
overall Project cost.
(b) The Project Company may raise financial resources for the
Project from various commercial sources. These may be equity,
subordinated debt, preference capital, term loans etc.
8. Implementation & Approval Process
(a) Tool room industry is expected to cater to diverse needs of arange of user groups. Hence the capital investment needs could
vary significantly from a level as low as Rs. 1 Crore to about Rs.
50-100 Crore for large scale high technology facility.
Therefore, an intensive market scan will be undertaken by DC
(MSME) by utilizing the expertise available in the existing MSME
Tool Rooms to identify the potential locations for setting up the
Mini Tool Rooms. Detailed Project Report defining detailed
contours of the identified Mini Tool Rooms will also be prepared
by the concerned MSME Tool Rooms.
7/31/2019 Setting Up of New Mini Tool Rooms 31
9/49
(b) The Government will follow a transparent and competitive
bidding process to select the Project Sponsor/ Project Company
who will set up the identified Mini Tool Room.
(c) A Request for Proposal (RFP) will be floated based on the
predefined contours of Detailed Project Report for the
project/identified Mini Tool Room, inviting technical and financial
proposals, pursuant to which interested entities from the private
sector will submit their proposals for setting up of Mini Tool
Room. The proposals will be evaluated on technical and
financial parameters. The criteria for technical evaluation will be
determined by the Government with assistance from the
Transaction Adviser (TA), MSME Tool Room concerned and the
same shall be clearly spelt out in the RFP.
(d) Financial proposals of only those bidders who qualify technically
will be evaluated for selection of successful Project Company.
(e) The technically qualified bidder, who asks for lowest grant
assistance i.e. minimum percentage of project cost will be
selected for assistance under the Scheme.
(f) After evaluating the financial offers of technically qualified
bidders, TA will submit its recommendations to the PMC.
(g) The Project Monitoring Committee (PMC) constituted by the
Government will have the authority to decide on the proposals
7/31/2019 Setting Up of New Mini Tool Rooms 31
10/49
received, which are not in conformity with the framework of the
Scheme or the RFP document.
(h) PMC will, after evaluation, present its recommendations before
the EFC/ SFC. Approval for a Project will be accorded by the
EFC/SFC based on the recommendations of PMC and due
diligence by TA. Such approval will be valid for a period of 6
months from the date of approval, and it is expected that the
Project will be ready for release of first tranche of grant within
6 months, failing which, the approval will automatically lapse,
unless it is specifically extended by the PMC.
(i) A Letter of Acceptance (LoA) will be issued to the successful
bidder stating his selection and invitation to sign an
Memorandum of Agreement (MoA) (placed at Annexure I) with
GoI, clearly specifying the responsibilities of each of the parties,
to implement the Project subject to demonstration of technical
and financial capability as stated in the response to RFP.
9. Time Frame
The timeframe for implementation of the Project is 2 years from
the date of approval.
10. Release of Funds
I. The following schedule will be adopted for release of Government
of India share to the Project Company:
(i) 20% as Ist Instalment
20% of the Grant will be released on possession of
Project Site by the Project Company, achievement of
7/31/2019 Setting Up of New Mini Tool Rooms 31
11/49
Financial Close and infusion of at least matching
contribution of the Project Companys share. The
expenditure incurred by the Project Company for
acquisition of Project Site will be considered as part of
the matching contribution,
(ii) 35% as IInd Instalment
35% of the Grant will be released after the utilisation of
at least 60% of the 1st instalment of Grant and the
matching contribution brought in by the Project Company
under Clause (i) as above and infusion of at least
matching contribution of the Project Companys share,
(iii) 35% as IIIrd Instalment
35% of the Grant will be released after the utilisation of
the 1st instalment of Grant and the matching contribution
brought in by the Project Company under Clause (i) and
60% of the 2nd instalment of Grant and matching
contribution brought in by the Project Company under
Clause (ii) as above and infusion of at least matching
contribution of the Project Companys share,
(iv) 10% as IVth Instalment
Balance 10% of the Grant, being the final instalment of
Grant will be paid a) upon utilisation of 2nd and 3rd
instalments of Grant and the matching contribution under
Clause (ii) and (iii) above, b) infusion and utilisation of
the balance 10% of the share of Project Company and c)
on commissioning of the Project and commencement of
operations and furnishing of Completion Certificate.
7/31/2019 Setting Up of New Mini Tool Rooms 31
12/49
II. The Project Company will submit the Utilisation Certificate (UC)
for the amounts utilized as per the format in accordance to GFR
19A (Annexure III); A separate no-lien account will be
maintained by Project Company for the funds released by GOI
and Accounts pertaining to the Project will be subject to audit by
the Comptroller & Auditor General of India.
11. O&M of Assets
(a) The Project Company will be responsible for O&M of assetscreated under the Scheme.
(b) There will be one nominee of the DevelopmentCommissioner (MSME) on the Board of Directors of the
Project Company till 5 years after the completion of the
Project.
(c) In case of dissolution of Project Company within 7 yearsfrom the date of sanction of assistance by the Government
under the Schemeor 5 years from the date of completionof the project, whichever is later, the asset created within
the Project Company will be vested with the Government.
(d) The Project Company will not abandon the operations ofthe Project, nor transfer any or all of the Project assets
including assets acquired for the Project out of resources
other than GoI grant.
(e) In case the Project Sponsor desires to withdraw from theProject through transfer/ sale of the Project assets, an
application to the effect will be made to PMC. PMC will
consider the merits of such a request and take necessary
steps for transfer of Project assets through transparent
bidding process, or take over the assets, or undertake
such other steps to meet the objectives of the Scheme.
7/31/2019 Setting Up of New Mini Tool Rooms 31
13/49
(f) In situation as described under (e) above, theconsideration, if any, payable to Project Company / Project
Sponsors will be determined following fair and transparent
procedures.
12. Implementation framework
(a) Project Monitoring Committee (PMC)
i The Office of Development Commissioner (MSME), GoI will be
the coordinating Department providing overall policy,
coordination and management support to the Scheme. A Project
Monitoring Committee (PMC) will be constituted under the
Chairmanship of Additional Secretary and DevelopmentCommissioner (MSME). The constitution of the committee is
detailed in Annexure II.
ii The PMC may induct representatives of industry associations,
Research & Development/ Technical institutions and other
private/public sector expert organisations as members or special
invitees.
iii In carrying out its roles and responsibilities, the PMC, will takeaccount of synergies of this Scheme with other Schemes of the
Department in general.
iv Upon recommendations of PMC based on the evaluation of bids,
the EFC/ SFC will accord approvals to the Projects.
v PMC will ensure smooth implementation of the Scheme by undertaking
monitoring and periodic reviews of the approved Projects including compliance with
the conditions mentioned under the MoA.
(b) Transaction Advisor (TA)
7/31/2019 Setting Up of New Mini Tool Rooms 31
14/49
i Recognising the need to undertake extensive pre Project
activities, GoI will engage the services of a professional agency
that has experience in execution of projects based on
competitive bidding; implementation of similar PPP based
Schemes. TA will assist the Government in speedy
implementation of the Projects in a transparent manner.
ii The TA will report directly to PMC and will assist the Office of DC
(MSME) in the discharge of the following responsibilities:
1. Formulation of a suitable strategy for implementation of
the Scheme.
2. Sensitisation of the potential stakeholders about the
Scheme at pre identified major industry concentrations/
locations.
3. Preparation of RFP (Request for Proposal documents) for
bidding out projects based on broad contours of the
Detailed Project Reports of the Projects (prepared by
MSME Tool Rooms) and customized MOA (prepared by TA)
to be signed between the GoI and Project Sponsor.
4. Formulating criteria for selection of bidders.
5. Releasing advertisements for RFP for inviting proposals/
bids from private parties.
6. Responding to requests for clarification and providing
required information to bidders.
7. Evaluation of Project proposals and bids and its submission
with recommendations to PMC for further action.
8. Device various formats for monitoring of projects during
implementation and also during operation.
7/31/2019 Setting Up of New Mini Tool Rooms 31
15/49
9. Periodical monitoring of the progress of the Projects, and
disbursement of funds to the Project Company and their
utilization.
iii. TA will be paid a fee by the Government; commensurate with
the envisaged responsibilities and such fee will be separate from
the grant-in-aid being given to the Project Company.
(c) Project Company
i The Scheme will be implemented on a PPP format through
Project Company, specially established for the purpose.
ii The private sector member enterprise/s having the majority
stake in the Project Company will all be legally independent
entities without any related party relationship with each other,
as described under Accounting Standard (AS) 18 the Companies
(Accounting Standard) Rules, 2006.
iii The Project Company will undertake the following
responsibilities:
1. Prepare the Detailed Project Report (DPR) covering the technical,
financial, institutional and O&M aspects of the projects based on
the Project contours provided in the RFP.
2. Tie up all financial resources to meet the Project cost (balance of
Government of India assistance) through debt/ equity, other
forms of non-Government funds.
7/31/2019 Setting Up of New Mini Tool Rooms 31
16/49
3. Enter into a Memorandum of Agreement with GoI as provided in
the Scheme.
4. Obtain any statutory approvals/ clearances required for the
Project including release of funds.
5. Recruit suitable functional professionals including technical staff
in order to ensure that the Project is executed smoothly and
operated efficiently to provide state- of-art tooling and training
services based on global benchmarks.
6. Implement various interventions as outlined and in the DPR
submitted to the Government.
7. O&M of assets created under the Project.
8. Furnish periodic progress reports regularly to Development
Commissioner (MSME) in the prescribed formats.
9. Perform all the obligations undertaken pursuant to the MoA with
the GoI (placed at Annexure I).
10. Submit the Utilisation Certificate (UC) for the amounts utilized as
per the format in accordance to GFR 19A (Annexure III).
11. Maintain a separate no-lien account for the funds released by
GOI and accounts pertaining to the Project will be subject to
audit by the Comptroller & Auditor General of India.
12. Meet escalations, if any in the Project cost from its own sources.
7/31/2019 Setting Up of New Mini Tool Rooms 31
17/49
13. Ensure at its own cost and expense, that the Grant is utilized
only for the purposes approved in the DPR
14. Obtain completion certificate from an independent engineering
consultant approved by the PMC confirming that the setting up
of the Project is completed in accordance with Project
Requirements (Completion Certificate) and furnish a copy of
the same to GOI.
(d) Promotional role of State Governments
Pro-active involvement of the State Governments in the Project implementation isenvisaged, which would give an impetus to the Project, however the same is not
mandatory. The State Government may extend support to the Project in thefollowing areas:
1. Providing requisite land to the project, wherever needed; in appropriatemode, to the Project; however this is not a pre-requisite under the Scheme.
2. Providing necessary external infrastructure to the Project such as power,water supply, roads etc, wherever needed.
3. Providing necessary Project related clearances expeditiously.
4. Dovetailing assistance available under related State Government schemes
for overall effectiveness and viability of the Projects.
5. Extending incentives available under related industrial promotional
policies.
ANNEXURE-I
AGREEMENT
BETWEEN
PRESIDENT OF UNION OF INDIA ACTING THROUGH DEVELOPMENTCOMMISSIONER, MICRO, SMALL AND MEDIUM ENTERPRISES,
GOVERNMENT OF INDIA(GOI)
AND
__________________________(Project Company)
FOR
7/31/2019 Setting Up of New Mini Tool Rooms 31
18/49
MINI TOOL ROOM AND TRAINING CENTRE PROJECT
Dated ___________________
AGREEMENT
This Agreement is made on this ____________ day of ___________, 200__
at __________ between (Agreement):
1. President of Union of India acting through Ministry of Micro, Small and
Medium Enterprises, Government of India represented by
__________________ (hereinafter referred to as GOI, which expression
shall unless repugnant to the context thereof, include its successors, assigns)
and having its Office at ____________, New Delhi, of the FIRST PART;
And
2. ____________________________ , a company registered under theCompanies Act 1956, having its Registered Office at
______________________________________________________________(hereinafter referred to as the "Project Company " which expression shallinclude its successors and assigns) of the OTHER PART;
(GOI and Project Company are individually referred to as the Party and
collectively referred to as the Parties)
WHEREAS:
A. Government of India, Ministry of Micro, Small and Medium Enterprises
(MSME) with a view to improve the competencies of the Micro, Small
and Medium Enterprises by making available, increased and enhanced
tool rooms and related training services in public private sector
partnership mode and thus to bridge the gap between demand and
supply of tool room facilities and trained man power in related areas
for the industry, framed a scheme vide Govt. Notification No.
________ dated __________ termed as Scheme for Setting up Mini
Tool Rooms and Training Centres) for designing and manufacturing
quality tools and tool room training facilities, which would be co-terminus with the 11th Five year plan (Herein after to as the
Scheme);
B. After intensive market studies through Transaction Advisor (TA) on
behalf of GOI, GOI identified potential locations where Mini Tool Rooms
and training centres in terms of the Scheme could be set up;
7/31/2019 Setting Up of New Mini Tool Rooms 31
19/49
C. GOI vide Request for Proposal No. _________ dated __________
(RFP) invited competitive proposals from eligible entities for
implementing the Project (as defined herein after) under the Scheme,
through competitive bidding route and in response thereto, GOI
received proposals from various eligible entities for implementing the
Project;
D. GOI, after evaluating the aforesaid RFPs by Transaction Advisor
appointed by GOI, accepted the proposal submitted by the Project
Company and issued Letter of Acceptance dated __________ (Letter
of Acceptance) to the Project Company / Consortium, a copy whereof
is hereto annexed as Schedule A;1
E. In accordance with the Scheme, RFP and Letter of Acceptance, the
Parties have agreed to enter into this Agreement setting out their
respective rights and obligations;
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS:
ARTICLE 1
DEFINITIONS AND INTERPRETATION
1.1 Definitions
In this Agreement, the following words and expressions shall, unless repugnant to thecontext or meaning thereof, have the meaning hereinafter respectively ascribed to them:
Accounting Year means the financial year commencing from 1stApril of any calendar year and ending on 31st March of the nextcalendar year.
Agreement means this agreement including schedules hereto, as of
the date hereof and includes any amendment hereto made inaccordance with the provisions hereof.
Applicable Laws means all laws in force and effect as of the datehereof and which may be promulgated or brought into force and effecthereinafter in India, including judgements, decrees, injunctions, writs
1In case Acceptance Letter is issued to a consortium and the developer is a SPV constiuted by
consortium, please modify the recital suitably.
7/31/2019 Setting Up of New Mini Tool Rooms 31
20/49
or orders of any court of record, as may be in force and effect duringthe subsistence of this Agreement.
Applicable Permits means all clearances, permits, authorisations,consents and approvals under or pursuant to any of the ApplicableLaws, required to be obtained and maintained by the ProjectCompany, in order to implement the Project and to provide ProjectFacilities in accordance with this Agreement.
Arbitration Act means the Arbitration and Conciliation Act, 1996and shall include any amendment to or any re-enactment thereof as inforce from time to time.
COD means the commercial operations date of the Project whichshall be the date on which Transaction Advisor has issued theCompletion Certificate of the Project.
Commencement Date means the date of this Agreement
Completion Certificate means the certificate to be issued by theTransaction Advisor certifying completion of construction of the Projectby the Project Company in accordance with the Project Requirements.
Contractor means any Person with whom the Project Company may enter
into any of the Project Agreements.
"DPR" means the Detailed Project Report in respect of the Project
EPC Contract means the contract, if any, entered into by theProject Company inter alia for the purpose of design, engineering,procurement of equipments, machinery and materials and constructionof the Project Facilities in accordance with the provisions of thisAgreement.
Event of Default shall have the meaning ascribed thereto in Article13.1.
Financial Close means the date on which the Financing Documentshave become effective and the Project Company has access to thefunds/financial assistance committed thereunder.
Financing Documents means collectively the documentsevidencing Lenders' commitment to finance the debt component ofcost of the Project.
Force Majeure Event means a force major event which:
7/31/2019 Setting Up of New Mini Tool Rooms 31
21/49
(a)is beyond the control of the Party claiming to be affected
thereby (the "Affected Party");
(b)prevents the Affected Party from performing or discharging itsobligations under this Agreement; and
(c) the Affected Party has been unable to overcome or prevent
despite exercise of due care and diligence.
Force Majeure Period means, the period commencing from thedate of occurrence of a Force Majeure Event and ending on (i) the dateon which the Affected Party, acting in accordance with the GoodIndustry Practice, resumes or should have resumed such of itsobligations.
Good Industry Practice means the exercise of that degree of skill,diligence, prudence and foresight in compliance with the undertakingsand obligations under this Agreement which would reasonably and
ordinarily be expected from a skilled and experienced Person engaged
in the implementation, operation and maintenance or supervision ormonitoring thereof or any of them of a project of the type similar tothat of the Project.
GOI means the Government of India.
Government Agency means GoI, or any state government orGovernmental department, commission, board, body, bureau, agency,authority, instrumentality, court or other judicial or administrativebody, central, state, or local, having jurisdiction over the ProjectCompany, the Project Site/ Project Facilities or any portion thereof, or
the performance of all or any of the services or obligations of theProject Company under or pursuant to this Agreement.
Grant means Rs.______ , being the lowest funding assistancequoted in response to RFP.
Implementation Period means the period beginning from the Commencement
Date and ending on the COD.
Insurance Proceeds means the proceeds of the insurance policiestaken by the Project Company.
Lenders means financial institutions, banks, funds or trusts who
provide or refinance the debt component of the cost of the Project(including guarantees, risk participation facility, take-out facility andother forms of credit enhancement) and includes subscribers to/
7/31/2019 Setting Up of New Mini Tool Rooms 31
22/49
trustee for the holders of debentures/bonds or other securities issuedby the Project Company to meet the cost of the Project.
Material Adverse Effect means material adverse effect on (a) theability of the Project Company to exercise any of its rights orperform/discharge any of its duties/obligations under and inaccordance with the provisions of this Agreement and/or (b) thelegality, validity, binding nature or enforceability of this Agreement.
Material Breach means a breach by either Party of any of itsobligations under this Agreement or covenants of Scheme, which hasor is likely to have a Material Adverse Effect on the Project and whichsuch Party shall have failed to cure.
Mini Tool Room shall have the meaning ascribed thereto in ProjectRequirements
Parties means the parties to this Agreement collectively and
Party" means either of the Parties to this Agreement individually.
Person means (unless otherwise specified or required by thecontext), any individual, company, corporation, partnership, jointventure, trust, unincorporated organisation, Government orGovernment Agency or any other legal entity.
Project means design, financing, procurement, construction,operations and maintenance of the the Project Facilities in accordancewith the provisions of this Agreement.
Project Agreements means collectively this Agreement, EPCContract, Procurement contracts, Operations & Maintenance contract,lease agreement and any other material contract (other than theEquity Documents and Financing Documents) entered into or mayhereafter be entered into by the Project Company in connection withthe Project.
Project Cost means the estimated Project cost of Rs._______Crores.
Project Facilities means Mini Tool Room facility and TrainingCentre facility set out in Schedule B to be designed, constructed,operated, maintained or provided by the Project Company on theProject Site, in accordance with the Project Requirements.
Project Monitoring Committee or PMC shall mean thecommittee constituted as such under the Chairmanship of AdditionalSecretary & Development Commissioner (MSME) in terms of theScheme.
7/31/2019 Setting Up of New Mini Tool Rooms 31
23/49
Project Requirements means the design, construction andoperation requirements as to Project Facilities comprising Mini ToolRoom and Training Centre set forth in Schedule C.
Project Site means the land on which the Project is to be set upand the Project Facilities are to be provided by the Project Company inaccordance with the Project Requirements
Project Company means [__________]2
, to whom Letter ofAcceptance is issued by GOI.
RFP shall have the meaning ascribed thereto in Recital C
Rs. or Rupees refers to the lawful currency of the Republic ofIndia.
Scheduled Project Completion Date, means ___________.3
Tax means and includes all taxes, fees, cesses, levies that may be
payable by the Project Company under any Applicable Law.
Termination means early termination of this Agreement pursuantto Termination Notice or otherwise in accordance with the provisions ofthis Agreement.
Termination Date means the date specified in the TerminationNotice as the date on which Termination occurs.
Termination Notice means the notice of Termination by GOI inaccordance with the applicable provisions of this Agreement.
Training Centre shall have the meaning assigned thereto in ProjectRequirements.
Transaction Advisor means a Person appointed as such by GOI interms of the Scheme and shall have the meaning ascribed thereto inthe Scheme
1.2 Interpretation
In this Agreement, unless the context otherwise requires,
2Please specify the names of entities / persons to whom LOA has been issued.
330 months from the date of Agreement i.e. 6 months for Financial Closure and 24 months for
construction period.
7/31/2019 Setting Up of New Mini Tool Rooms 31
24/49
(a) any reference to a statutory provision shall include such provisionas is from time to time modified or re-enacted or consolidated sofar as such modification or re-enactment or consolidation appliesor is capable of applying to any transactions entered intohereunder;
(b) references to Applicable Law shall include the laws, acts,ordinances, rules, regulations, notifications, guidelines or byelaws
which have the force of law in any State or Union Territoryforming part of the Union of India;
(c) the words importing singular shall include plural and vice versa,and words denoting natural persons shall include partnerships,firms, companies, corporations, joint ventures, trusts,associations, organisations or other entities (whether or nothaving a separate legal entity);
(d) the headings are for convenience of reference only and shall notbe used in, and shall not affect, the construction or interpretation
of this Agreement;
(e) the words "include" and "including" are to be construed withoutlimitation;
(f) references to "construction" include investigation, design,engineering, procurement, delivery, transportation, installation,processing, fabrication, testing, commissioning and otheractivities incidental to the construction;
(g) any reference to any period of time shall mean a reference to thataccording to Indian Standard Time;
(h) any reference to day shall mean a reference to a calendar day;
(i) any reference to month shall mean a reference to a calendarmonth;
(j) the Schedules to this Agreement form an integral part of thisAgreement and will be in full force and effect as though they wereexpressly set out in the body of this Agreement;
(k) any reference at any time to any agreement, deed, instrument,license or document of any description shall be construed asreference to that agreement, deed, instrument, license or otherdocument as amended, varied, supplemented, modified orsuspended at the time of such reference;
(l) references to recitals, Articles, sub-articles, clauses, or Schedules inthis Agreement shall, except where the context otherwiserequires, be deemed to be references to recitals, Articles, sub-articles, clauses and Schedules of or to this Agreement;
7/31/2019 Setting Up of New Mini Tool Rooms 31
25/49
(m) any agreement, consent, approval, authorisation, notice,
communication, information or report required under or pursuantto this Agreement from or by any Party or the Transaction Advisorshall be valid and effectual only if it is in writing under the handsof duly authorised representative of such Party or the TransactionAdvisor, as the case may be, in this behalf and not otherwise;
(n) unless otherwise stated, any reference to any period commencing"from" a specified day or date and "till" or "until" a specified dayor date shall include both such days or dates.
1.3 Measurements and Arithmetic Conventions
All measurements and calculations shall be in metric system and calculations
done to 2 decimal places, with the third digit of 5 or above being rounded up and below 5
being rounded down.
1.4 Ambiguities and Discrepancies
In case of ambiguities or discrepancies within this Agreement, thefollowing shall apply:
(a)between two Articles of this Agreement, the provisions of specificArticles relevant to the issue under consideration shall prevail overthose in other Articles;
(b) between the written description on the Drawings and the
Specifications and Standards, the latter shall prevail;
(c) between the dimension scaled from the Drawing and its specificwritten dimension, the latter shall prevail;
(d) between any value written in numerals and that in words, thelatter shall prevail;
ARTICLE 2
OWNERSHIP OF PROJECT AND GRANT2.1 OwnershipThe Project Company hereby agrees and undertakes to construct,operate and maintain the Project/Project Facilities over Project Site,procure necessary machinery, equipment and trained man power inaccordance with the Project Requirements and implement the Projectin accordance with this Agreement and the Scheme. The ownership ofthe Project shall vest in Project Company subject to the terms and
7/31/2019 Setting Up of New Mini Tool Rooms 31
26/49
conditions of this Agreement. The Project Company shall be entitled toraise loans for the Project and secure the loans by way of charge,assignment, mortgage or otherwise over Project assets subject toClause 11.1 of this Agreement
2.2 GrantIn consideration of the Project Company agreeing to develop the
Project in accordance with Project Requirements, the Scheme and thisAgreement, GOI agrees to sanction and make payment of Grantthrough Ministry of MSME for the Project as under:
i. 20% of the Grant will be released on a) possession of Project Siteby the Project Company and b) upon, achievement of FinancialClose and c) infusion of at least matching contribution of theProject Companys share. The expenditure incurred by theProject Company for acquisition of Project Site shall beconsidered as part of the matching contribution;
ii. 35% of the Grant will be released after the utilisation of at least60% of the 1st instalment of Grant and the matchingcontribution brought in by the Project Company under Clause (i)as above and infusion of at least matching contribution of theProject Companys share;
iii. 35% of the Grant will be released after the utilisation of the 1stinstalment of Grant and the matching contribution brought in bythe Project Company under Clause (i) and 60% of the 2nd
instalment of Grant and matching contribution brought in by theProject Company under Clause (ii) as above and infusion of at
least matching contribution of the Project Companys share;
iv. Balance 10% of the Grant, being the final instalment of Grant willbe paid a) upon utilisation of 2nd and 3rd instalments of Grant andthe matching contribution under Clause (ii) and (iii) above, b)infusion and utilisation of the balance 10% of the share of ProjectCompany and c) on achievement of COD and commissioning ofthe Project and furnishing of Completion Certificate;
v. The Project Company shall submit the Utilisation Certificate (UC)for the amounts utilized as per the format in accordance to GFR19A (Annexure III);
vi. Project related accounts of the Project Company shall be subjectto audit by the Comptroller & Auditor General of India;
vii. On the happening of Project Companys Event of Default, GOIshall be entitled to suspend the release of Grant.
7/31/2019 Setting Up of New Mini Tool Rooms 31
27/49
ARTICLE 3
PROJECT SITE
3.1 Project Site
It shall be the responsibility of the Project Company to acquire theProject Site by way of purchase or long lease. The Project Site shall be
free hold or lease hold immovable property. In case of lease, the leaseshall be at least for a period of 10 years. The Project Company shall bein physical possession of the Project Site, in its own right, free fromEncumbrance together with the necessary rights for the purpose ofimplementing the Project.
ARTICLE 4
COMPLETION CERTIFICATE
4.1 Completion Certificate
During Implementation Period the Transaction Advisor shall superviseand monitor the progress of the Project. Upon completion of theProject in accordance with the Agreement, the Project Company shallobtain completion certificate from an independent engineeringconsultant approved by the PMC confirming that the setting up of theProject is completed in accordance with Project Requirements(Completion Certificate) and furnish a copy of the same to GOI andthe Transaction Advisor.
ARTICLE 5
PROJECT COMPANYS OBLIGATIONS
In addition to and not in derogation or substitution of any of its otherobligations under this Agreement, the Project Company shall have thefollowing obligations:
5.1 Financing Arrangement
(a)The Project Company shall at its cost, expenses and risk make suchfinancing arrangement as would be necessary to finance the cost ofthe Project and to meet Project Requirements and other obligationsunder this Agreement, in a timely manner.
(b)The Project Company shall achieve Financial Close within 6 monthsfrom Commencement Date or within such time as may be agreed toin writing by GOI.
7/31/2019 Setting Up of New Mini Tool Rooms 31
28/49
(c)The Project Company shall meet escalations, if any in the Project
cost from its own sources without seeking additional grant from GoI
5.2 Project Implementation
The Project Company shall adhere to the Project Requirements andachieve COD on or before the Scheduled Project Completion Date.
5.3 Operation and Maintenance
(a) Operation and Maintenance Requirements
The Project Company shall operate and maintain the Project/ProjectFacilities in accordance with the Project Requirements and GoodIndustry Practice by itself, or through a Contractor possessing therequisite technical, financial and managerial expertise/capability,but in either case, the Project Company shall remain solelyresponsible to meet the Project Requirements.
(b) Failure to meet Project Requirements
In the event the Project Company has failed to operate andmaintain the Project Facilities in accordance with the ProjectRequirements, and such failure has not been remedied despite anotice to that effect issued by GOI (Notice to Remedy), GOI may,without prejudice to any of its other rights/remedies under thisAgreement, be entitled to cause the repair and maintenance of theProject Facilities at the risk and cost of the Project Company. TheProject Company shall reimburse all costs incurred by GOI onaccount of such repair and maintenance with interest @State Bank
of India Prime Lender Rate per annum within 7 days of receipt ofGOIs claim therefore.
(c)Material Breach of Project RequirementsThe Project Company shall be deemed to be in Material Breach ofProject Requirements if the Transaction Advisor acting reasonablyand in accordance with the provisions of this Agreement, hasdetermined that due to breach of its obligations by the ProjectCompany:
(i) there has been failure/undue delay in carrying out ProjectRequirements;
(ii) the assured standards or any part thereof has deteriorated toa level which is below the acceptance level prescribed by theProject Requirements;
7/31/2019 Setting Up of New Mini Tool Rooms 31
29/49
(a) GOIs Rights
Upon occurrence of a Material Breach of Project Requirements, GOIshall, without prejudice to and notwithstanding any otherconsequences provided therefore under this Agreement, be entitledto suspend the release of Grant and terminate this Agreement.
5.4 Insurance
The Project Company shall at its cost and expense, purchase andmaintain during the Implementation Period and thereafter suchinsurance as are necessary in accordance with Good IndustryPractice.
5.5 Shareholding
(a)The Project Company shall ensure that the Project Sponsor/s shallin aggregate hold not less than 51% of the paid up equity capital of
the Project Company till COD and 5 years thereafter.
(b)The Project Company shall, through consortium members orpromoters or otherwise, contribute to at least 15% of the overallProject Cost.
5.6 General Obligations
The Project Company shall at its own cost and expense:
(a)Prepare the Detailed Project Report (DPR) covering the technical,financial, institutional and O&M aspects of the Project based on the
Project contours provided in the RFP.
(b)obtain all Applicable Permits in conformity with the Applicable Lawsand be in compliance thereof at all times;
(c)construct, operate and maintain the Project/Project Facilities,procure necessary machinery, equipment and trained man powerin accordance with the Project Requirements.;
(d)Recruit suitable functional professionals including technical staff inorder to ensure that the Project is executed smoothly and operatedefficiently to provide state- of-art tooling and training servicesbased on global benchmarks
(e)Implement various interventions as outlined and approved in DPR
(f)Ensure that the Grant is utilized only for the purposes approved inthe DPR
7/31/2019 Setting Up of New Mini Tool Rooms 31
30/49
(g)Furnish periodic progress reports on quarterly basis regularly to GoI/ PMC, in the prescribed formats
(h)maintain harmony and good industrial relations among thepersonnel employed in connection with the performance of itsobligations under this Agreement;
(i) make its own arrangements for construction materials and observe
and fulfil the environmental and other requirements under theApplicable Laws and Applicable Permits;
(j)be responsible for quality, soundness, durability, safety and theoverall Project Requirements;
(k)afford access to the Project Facilities to the authorisedrepresentatives of GOI, Transaction Advisor, and any GovernmentAgency having jurisdiction over the Project, including thoseconcerned with safety, security or environmental protection toinspect the Project and to investigate any matter within their
authority and upon reasonable notice, the Project Company shall
provide to such persons assistance reasonably required to carry outtheir respective duties and functions.
(l) There shall be one nominee of the GoI on the Board of Directors ofthe Project Company till completion of the Project;
(m) The Project Company shall not abandon the operations of theProject, nor transfer any or all of the Project assets including assetsacquired for the Project out of Grant without prior written consentof GOI;
(n)In case the Project Company desires to withdraw from the Projectthrough transfer/ sale of the Project assets, an application to theeffect shall be made to Development Commissioner (MSME).DC(MSME) shall consider the merits of such a request and takenecessary steps for transfer of Project assets through transparentbidding process, or take over the assets, or undertake such othersteps to meet the objectives of the Scheme;
(o)Make available the tooling facility to MSMEs in accordance with theestimated projections made in response to RFP
(p)Provide training facility related to the tooling in accordance with theestimated projections made in response to RFP
(q)Hire technical consultants as may required for the purposes ofimplementation of the Project
(r)Perform all the obligations undertaken pursuant to this Agreementwith the GOI
7/31/2019 Setting Up of New Mini Tool Rooms 31
31/49
5.7 No Breach of Obligations
The Project Company shall not be considered to be in breach of itsobligations under this Agreement nor shall it incur or suffer any liabilityif and to the extent performance of any of its obligations under thisAgreement is affected by or on account of Force Majeure Event
ARTICLE 6
GOIS OBLIGATIONS
In addition to and not in derogation or substitution of any of its otherobligations under this Agreement, GOI shall have the followingobligations:
7/31/2019 Setting Up of New Mini Tool Rooms 31
32/49
6.1 Specific obligations
GOI shall release Grant in accordance with Clause 2.1 provided thatthe Project Company is not in Material Breach of this Agreement andno Project Companys Event of Default has occured.
6.2 General obligations(a)GOI shall either by itself or through State Government shall on best
effort basis provide the following (but shall not be obligated to) ifso required by the Project Company:
i. Provide necessary external infrastructure to the Projectsuch as power, water supply, roads etc, whereverneeded;
ii. Provide necessary Project related clearances, Applicable
Permits on expeditious basis
iii. Dovetail assistance available under related StateGovernment schemes for overall effectiveness andviability of the projects
iv. Extend incentives available under related industrialpromotional policies
b. observe and comply with all its obligations setforth in this Agreement.
7/31/2019 Setting Up of New Mini Tool Rooms 31
33/49
ARTICLE 7
EVENTS OF DEFAULT AND TERMINATION
7.1 Events of Default
Event of Default means either Project Company Event of Default orGOI Event of Default or both as the context may admit or require.
(a) Project Company Event of Default
Any of the following events shall constitute an event of defaultby the Project Company ("Project Company Event of Default")unless such event has occurred as a result of one or morereasons set out in Article 5.7;
(i) The Project Company has failed to achieve Financial Closewithin 6 months from the date hereof.
(ii) The Project Company has failed to adhere to the ProjectRequirements and in the reasonable estimation of theTransaction Advisor, such failure is likely to delayachievement of COD beyond 120 days of the ScheduleProject Completion Date.
(iii) The Project Company has failed to achieve COD within 120days from the Scheduled Project Completion Date.
(iv) The Project Company has committed Material Breach ofthis Agreement or the Scheme.
(v) Any representation made or warranties given by the ProjectCompany under this Agreement is found to be false ormisleading.
(vi) The Project Company has failed to ensure minimumshareholding requirements specified in Article 5.5.
(vii)A resolution has been passed by the shareholders of theProject Company for the voluntary winding up of theProject Company.
(viii)A default has occurred under any of the FinancingDocuments and any of the Lender(s) has recalled itsfinancial assistance and demanded payment of theamounts outstanding under the Financing Documents orany of them as applicable.
(ix) The Project Company has abandoned the Project Facilities.
7/31/2019 Setting Up of New Mini Tool Rooms 31
34/49
(xii)The Project Company has repudiated this Agreement or hasotherwise expressed an intention not to be bound by thisAgreement.
(xiii)The Project Company uses the Project Facilities for captiveconsumption in violation of the Scheme.
(xiv)The Project Company fails to cater to the minimum number
of MSMEs or fails to train minimum number of persons asstated in RFP.
(b) GOI Event of Default
Any of the following events shall constitute an event of defaultby GOI ("GOI Event of Default), unless caused by a ProjectCompany Event of Default or a Force Majeure Event:
(i) GOI is in breach of any of its obligations under this
Agreement except those for which specific remedy has
been provided elsewhere, and has failed to cure suchbreach within 30 (thirty) days of receipt of notice thereofissued by the Project Company.
(ii) GOI has repudiated this Agreement or otherwise expressedits intention not to be bound by this Agreement orwithdraws the Scheme.
(iii) GOI has delayed payment of Grant that has fallen due interms of this Agreement and the same has MaterialAdverse Effect.
(iv) Any representation made or warranties given by the GOIunder this Agreement has been found to be false ormisleading.
7.2 Termination due to Events of Default(a) Termination for Project Company Event of Default
(i) Without prejudice to any other right or remedy which GOI mayhave in respect thereof under this Agreement, upon theoccurrence of a Project Company Event of Default, GOI shall beentitled to terminate this Agreement by issuing 30 daysTermination Notice.
(b) Termination for GOI Event of Default
(i) Without prejudice to any other right or remedy which theProject Company may have in respect thereof under this
7/31/2019 Setting Up of New Mini Tool Rooms 31
35/49
Agreement, upon the occurrence of GOI Event of Default, theProject Company shall be entitled to terminate this Agreementby issuing 30 days Termination Notice.
(c) Termination NoticeIf a Party having become entitled to do so decides to terminate
this Agreement pursuant to the preceding sub article (a) or (b),it shall issue Termination Notice setting out:
(i) in sufficient detail the underlying Event of Default;
(ii) the Termination Date which shall be a date occurring notearlier than 30 days from the date of Termination Notice;and
(iii) any other relevant information.
(d) Withdrawal of Termination NoticeNotwithstanding anything inconsistent contained in thisAgreement, if the Party who has been served with theTermination Notice cures the underlying Event of Default to thesatisfaction of the other Party at any time before theTermination occurs, the Termination Notice shall be withdrawnby the Party which had issued the same.
7.3 Consequences of Termination
(a) Upon Termination of this Agreement for Project CompanysEvent of Default, GOI shall be entitled to suspend the release offuture installments of Grant.;
(b) If the Agreement is terminated due to Project Company Eventof Default within 7 years from the date of sanction of Grantassistance by the Government under the Scheme, the Projectassets created shall at the sole discretion of GOI be vested withthe GOI. Entire Grant assistance extended by GOI shall berefunded by the Project Company within 3 months from the date
of termination of this Agreement. In the event of take over ofProject and the Project assets, the consideration, if any, payableto the Project Company shall be determined following fair andtransparent procedures after determining the fair value thereofby an independent consultant to be appointed by GOI. Theconsideration payable to the Project Company, after adjustingthe moneys payable to GOI, will be credited to the no lienaccount / trust and retention account of the Project Companyand shall be first applied towards repayment of the Lenders
7/31/2019 Setting Up of New Mini Tool Rooms 31
36/49
dues,if any, and thereafter the balance shall be paid to theProject Company.
(c) Upon termination of this Agreement for GOI Event of Defaultresulting in Materia Adverse Effect, GOI shall be liable to paycompensation as determined by independent consultant
.7.4 Rights of Parties
Notwithstanding anything to the contrary contained in this Agreement,
Termination pursuant to any of the provisions of this Agreement shallbe without prejudice to accrued rights of either Party.
ARTICLE 8
MODE OF PAYMENT BY GOI
8.1 Mode of Payment
The Project Company hereby expressly authorises GOI to pay Grant amounts, which
becomes due and payable by GOI to the Project Company under this Agreement directlyto the credit of no lien account with a Bank, as may be intimated by the Project Company/ Lenders to the Project.
ARTICLE 9
DISPUTE RESOLUTION9.1 Arbitration
(a) Procedure
Any dispute, which is not resolved amicably, shall be finallysettled by binding arbitration under the Arbitration andconciliation Act, 1996. The arbitration shall be by a solearbitrator acceptable to both the Parties, failing which by apanel of three arbitrators, one to be appointed by each Partyand the third to be appointed by the two arbitrators appointedby the Parties. The Party requiring arbitration shall appoint anarbitrator in writing, inform the other Party about such
7/31/2019 Setting Up of New Mini Tool Rooms 31
37/49
appointment and call upon the other Party to appoint itsarbitrator. If within 15 days of receipt of such intimation theother Party fails to appoint its arbitrator, the Party seekingappointment of arbitrator may take further steps in accordancewith Arbitration and Conciliation Act, 1996.
(b) Place of Arbitration
The place of arbitration shall ordinarily be New Delhi but byagreement of the Parties, the arbitration hearings, if required,may be held elsewhere.
(c) English Language
The request for arbitration, the answer to the request, the termsof reference, any written submissions, any orders and awardsshall be in English and, if oral hearings take place, English shallbe the language to be used in the hearings.
(d) Enforcement of Award
The Parties agree that the decision or award resulting fromarbitration shall be final and binding upon the Parties and shallbe enforceable in accordance with the Provision of theArbitration Act.
(e) Performance during Arbitration
Pending the submission of and/or decision on a dispute and untilthe arbitral award is published, the Parties shall continue toperform their respective obligations under this Agreement
without prejudice to a final adjustment in accordance with suchaward.
ARTICLE 10
REPRESENTATIONS AND WARRANTIES, DISCLAIMER
10.1 Representations and Warranties of the Project Company
The Project Company represents and warrants to GOI that:
(a)it is duly organised, validly existing and in good standing under thelaws of India;
(b)it is a special purpose company set up solely for the purpose ofimplementing and operating the Project/Project Facilities inaccordance with the terms of this Agreement;
7/31/2019 Setting Up of New Mini Tool Rooms 31
38/49
(c)it has full power and authority to execute, deliver and perform itsobligations under this Agreement and to carry out the transactionscontemplated hereby;
(d)it has taken all necessary corporate and other action underApplicable Laws and its constitutional documents to authorise theexecution, delivery and performance of this Agreement;
(e)it has the financial standing and capacity to undertake the Project;
(f)this Agreement constitutes its legal, valid and binding obligationenforceable against it in accordance with the terms hereof;
(g)it is subject to civil and commercial laws of India with respect tothis Agreement and it hereby expressly and irrevocably waives anyimmunity in any jurisdiction in respect thereof;
(h)the execution, delivery and performance of this Agreement will notconflict with, result in the breach of, constitute a default under or
accelerate performance required by any of the terms of the Project
Company's Memorandum and Articles of Association or of anymember of the Consortium or any Applicable Laws or any covenant,agreement, understanding, decree or order to which it is a party orby which it or any of its properties or assets are bound or affected;
(i) there are no actions, suits, proceedings or investigations pending orto the Project Company's knowledge threatened against it at law orin equity before any court or before any other judicial, quasi judicialor other authority, the outcome of which may constitute ProjectCompany Event of Default or which individually or in the aggregatemay result in Material Adverse Effect;
(j) it has no knowledge of any violation or default with respect to anyorder, writ, injunction or any decree of any court or any legallybinding order of any Government Agency which may result inMaterial Adverse Effect;
(k)it has complied with all Applicable Laws and has not been subject toany fines, penalties, injunctive relief or any other civil or criminalliabilities which in the aggregate have or may have MaterialAdverse Effect;
(l) subject to receipt by the Project Company from GOI of theTermination Payment and any other amount due under any of theprovisions of this Agreement, in the manner and to the extentprovided for under the applicable provisions of this Agreement allrights and interests of the Project Company in and to the Project /Project Facilities shall pass to and vest in GOI on the TerminationDate free and clear of all Encumbrances without any further act ordeed on the part of the Project Company or GOI;
7/31/2019 Setting Up of New Mini Tool Rooms 31
39/49
(m) no representation or warranty by the Project Companycontained herein or in any other document furnished by it to GOI orto any Government Agency in relation to Applicable Permitscontains or will contain any untrue statement of material fact oromits or will omit to state a material fact necessary to make suchrepresentation or warranty not misleading; and
(n)no bribe or illegal gratification has been paid or will be paid in cash
or kind by or on behalf of the Project Company to any Person toprocure the Grant.
(o)Without prejudice to any express provision contained in thisAgreement, the Project Company acknowledges that prior to theexecution of this Agreement, the Project Company has after acomplete and careful examination made an independent evaluationof the Project Requirements and the information provided by GOI,and has determined to its satisfaction the nature and extent ofrisks and hazards as are likely to arise or may be faced by theProject Company in the course of performance of its obligations
hereunder.
The Project Company also acknowledges and hereby accepts therisk of inadequacy, mistake or error in or relating to any of thematters set forth above and hereby confirms that GOI shall not beliable for the same in any manner whatsoever to the ProjectCompany.
10.2 Representations and Warranties of GOI
GOI represents and warrants to the Project Company that:
(a)GOI has full power and authority to execute, deliver and performthe Agreement;
(b)This Agreement constitutes GOI's legal, valid and binding obligationenforceable against it in accordance with the terms hereof.
10.3 Obligation to notify change
In the event that any of the representations or warranties made/givenby a Party ceases to be true or stands changed, the Party who hadmade such representation or given such warranty shall promptly notifythe other of the same.
ARTICLE 11MISCELLANEOUS
11.1 Assignment and Charges
7/31/2019 Setting Up of New Mini Tool Rooms 31
40/49
(a) Subject to sub-articles (b) and (c) herein below, neither Party
shall assign this Agreement or the rights, benefits andobligations hereunder save and except with prior consent of theother Party.
(b) Except as provided in sub-article (c) herein below, the ProjectCompany shall not create nor permit to subsist any
Encumbrance over or otherwise transfer or dispose of all or anyof its rights and benefits under this Agreement except with priorconsent in writing of GOI, which consent GOI shall be entitled todecline without assigning any reason whatsoever.
(c) Restraint set forth in sub-articles (a) and (b) above shall notapply to:
(i) liens/encumbrances arising by operation of law (or by anagreement evidencing the same) in the ordinary course ofbusiness of the Project Company ;
(ii) mortgages/pledges/hypothecation of goods/ Project assets(including Grant), as security for indebtedness, in favour ofthe Lenders and working capital providers for the Project;
(iii) assignment of Project Companys rights and benefits underthis Agreement or Project Agreements in favour of theLenders / security trustee appointed by the Lenders assecurity for financial assistance provided by them.
11.2 Liability and Indemnity
(a) General Indemnity
(i) The Project Company shall indemnify, defend and hold GOIharmless against any and all proceedings, actions and thirdparty claims arising out of a breach by Project Company ofany of its obligations under this Agreement except to theextent that any such claim has arisen due to breachby GOIof any of its obligations under this Agreement or a ForceMajeure Event.
(ii) GOI will, indemnify, defend and hold harmless the ProjectCompany against any and all proceedings, actions, thirdparty claims for loss, damage and expense of whateverkind and nature arising out of breach by GOI, its officers,servants and agents of any obligations of GOI under thisAgreement except to the extent that any such claim hasarisen due to breach by the Project Company of any of itsobligations under this Agreement or a Force Majeure Event.
7/31/2019 Setting Up of New Mini Tool Rooms 31
41/49
11.3 Governing Law and Jurisdiction
This Agreement shall be governed by the laws of India. The Courts atNew Delhi, India shall have jurisdiction over all matters arising out ofor relating to this Agreement.
11.4 Waiver
(a) Waiver by either Party of any default by the other Party in theobservance and performance of any provision of or obligationsunder this Agreement:
(i) shall not operate or be construed as a waiver of any otheror subsequent default hereof or of other provisions orobligations under this Agreement;
(ii) shall not be effective unless it is in writing and executedby a duly authorised representative of such Party; and
(iii) shall not affect the validity or enforceability of this
Agreement in any manner.
(b)Neither the failure by either Party to insist on any occasion uponthe performance of the terms, conditions and provisions of thisAgreement or any obligation hereunder nor time or otherindulgence granted by a Party to the other Party shall be treated ordeemed as waiver/breach of any terms, conditions or provisions ofthis Agreement.
11.5 Survival
Termination of this Agreement (a) shall not relieve the ProjectCompany or GOI of any obligations already incurred hereunder whichexpressly or by implication survives Termination hereof, and (b)except as otherwise provided in any provision of this Agreementexpressly limiting the liability of either Party, shall not relieve eitherParty of any obligations or liabilities for loss or damage to the otherParty arising out of or caused by acts or omissions of such Party priorto the effectiveness of such Termination or arising out of suchTermination.
11.6 Amendments
This Agreement and the Schedules together constitute a complete andexclusive understanding of the terms of the Agreement between theParties on the subject hereof and no amendment or modificationhereto shall be valid and effective unless agreed to by all the Partieshereto and evidenced in writing.
11.7 Notices
7/31/2019 Setting Up of New Mini Tool Rooms 31
42/49
Unless otherwise stated, notices to be given under this Agreementincluding but not limited to a notice of waiver of any term, breach ofany term of this Agreement and termination of this Agreement, shallbe in writing and shall be given by hand delivery, recognisedinternational courier, mail, telex or facsimile transmission anddelivered or transmitted to the Parties at their respective addressesset forth below :
If to GOI:____________________________________
Fax No.____________
If to the Project Company
Managing Director,___________ Limited,___________________,
___________________
___________________
Fax No. _____________
Or such address, telex number, or facsimile number as may be dulynotified by the respective Parties from time to time, and shall bedeemed to have been made or delivered (i) in the case of anycommunication made by letter, when delivered by hand, by recognisedinternational courier or by mail (registered, return receipt requested)at that address and (ii) in the case of any communication made bytelex or facsimile, when transmitted properly addressed to such telex
number or facsimile number.
11.8 Severability
If for any reason whatsoever any provision of this Agreement is orbecomes invalid, illegal or unenforceable or is declared by any court ofcompetent jurisdiction or any other instrumentality to be invalid, illegalor unenforceable, the validity, legality or enforceability of theremaining provisions shall not be affected in any manner, and theParties shall negotiate in good faith with a view to agreeing upon oneor more provisions which may be substituted for such invalid,unenforceable or illegal provisions, as nearly as is practicable. Providedfailure to agree upon any such provisions shall not be subject todispute resolution under this Agreement or otherwise.
11.9 No PartnershipNothing contained in this Agreement shall be construed or interpretedas constituting a partnership between the Parties. Neither Party shallhave any authority to bind the other in any manner whatsoever.
7/31/2019 Setting Up of New Mini Tool Rooms 31
43/49
11.10 Language
All notices required to be given under this Agreement and allcommunications, documentation and proceedings which are in any wayrelevant to this Agreement shall be in writing and in English language.
11.11 Exclusion of Implied Warranties etc.
This Agreement expressly excludes any warranty, condition or otherundertaking implied at law or by custom or otherwise arising out ofany other agreement between the Parties or any representation by anyParty not contained in a binding legal agreement executed by theParties.
11.12 Counterparts
This Agreement may be executed in two counterparts, each of whichwhen executed and delivered shall constitute an original of thisAgreement but shall together constitute one and only the Agreement.
IN WITNESS WHEREOF THE, PARTIES HAVE EXECUTED ANDDELIVERED THIS AGREEMENT AS OF THE DATE FIRST ABOVEWRITTEN.
SIGNED SEALED AND DELIVERED
For and on behalf of GOI by
(Signature) ............................................................(Name)...................................................................(Designation).........................................................
SIGNED, SEALED AND DELIVERED
For and on behalf of Project Company by:
(Signature) ............................................................(Name)...................................................................(Designation).........................................................
In the presence of:1)....................................................................2)....................................................................
7/31/2019 Setting Up of New Mini Tool Rooms 31
44/49
SCHEDULE A
LETTER OF ACCEPTANCE
Enclosed
7/31/2019 Setting Up of New Mini Tool Rooms 31
45/49
SCHEDULE B
PROJECT FACILITIES
A. MINI TOOL ROOM FACILITY
(Pl give full description, Location etc)
B. Training Centre Facility
(Pl give full description, Location etc)
7/31/2019 Setting Up of New Mini Tool Rooms 31
46/49
SCHEDULE C
PROJECT REQUIREMENTS
A. MINI TOOL ROOM FACILITY1. Design Requirements: Pl specify2. Machinery requirements: Pl Specify3. Construction Requirements: Pl specify4. Performance Standards: Pl specify5. Operation and Maintenance Requirements: Pl specify
B. TRAINING CENTRE FACILITY
1. Design Requirements: Pl specify2. Construction Requirements: Pl specify3. Performance Standards: Pl specify4. Operation and Maintenance Requirements: Pl specify
ANNEXURE-II
7/31/2019 Setting Up of New Mini Tool Rooms 31
47/49
Constitution of Project Monitoring Committee (PMC)
1. AS & DC (MSME) Chairperson
2. Addl. Secretary & F.A. Member
3. Divisional Head, Tool Rooms,
Office of DC MSME
Member
4. Transaction Advisor Member
5. CEO of MSME Tool Room
Involved in DPR
Member
6. Secretary (Industry) of the State By Invitation
Note: Chairperson may co-opt any other member or invitee as may
be felt necessary.
ANNEXURE-III
FORM GFR 19-A
[See Rule 212(1)]
7/31/2019 Setting Up of New Mini Tool Rooms 31
48/49
Form of Utilization Certificate
Sl. No. Letter
No. and
date
Amount Certified that out of Rs of
grants-in-aid sanctioned during
the year.in favour of.
under DC(MSME) Letter No. given
in the margin and Rs.on
account of unspent balance of the
previous year, a sum of Rs.has
been utilised for the purpose
of.for which it was
sanctioned and that the balance of
Rs remaining unutilised at
the end of the year has been
surrendered to Government (vide
No., dated..)/will be
adjusted towards the grants-in-
aid/equity payable during the next
year
Total
2. Certified that I have satisfied myself that the conditions on whichthe grants-in-aid/equity was sanctioned have been duly fulfilled/are
being fulfilled and that I have exercised the following checks to see
that the money was actually utilised for the purpose for which it was
sanctioned.
7/31/2019 Setting Up of New Mini Tool Rooms 31
49/49
Kinds of checks exercised
1.
2.
3.
Signature
Designation
Date.