Page 1: September 2009 Investor Presentation

September 2009Investor Presentation

Page 2: September 2009 Investor Presentation

Forward-Looking Statement

Certain statements contained in the following presentation constitute forward-

looking statements. Such forward-looking statements involve a number of known

and unknown risks, uncertainties and other factors, which may cause the actual

results, performance or achievements of the company to be materially different

from actual results and achievements expressed or implied by such forward-

looking statements. Readers are cautioned not to place undue reliance on these

forward-looking statements, which speak only as of the date the statements were

made. Readers are also advised to consider such forward-looking statements

while considering the risks inherent in the business of exploration.

2

Page 3: September 2009 Investor Presentation

TSX-V: MEX

Largest Gold Producer

2nd Largest Gold ProducerGHANA

3rd Largest Gold ProducerTANZANIA

• Focused on gold in Ghana and Tanzania• 53.5 million shares O/S• Experienced Board & Management• We know Africa well

Company Strategy• Politically stable countries• History of gold mining• Acceptance of mining by locals• Permitting & tenure laws• Objective: grow our assets into multi-million oz deposits• Over 100 years of combined African experience• Over 90 years of combined geological African experience

3

Page 4: September 2009 Investor Presentation

TSX-V: MEX

Shares outstanding 53.6 million52 week high $0.2352 week low $0.075

4

Midlands vs. S&P/TSX Venture Composite Index – 1 Year

Page 5: September 2009 Investor Presentation

Priority Project: Sian, Ghana

Sian on Ashanti Gold Belt

• Sian contains two previous open pit mines and a 400,000 oz resource at 2.3 g/t

• 30 km NE of Newmont’s Akyem 8.7+ million oz deposit

• Production capital costs minimized by existing mine infrastructure

• Drill results show significant exploration upside potential

Other Ghana Projects:• Kwahu Praso (Ashanti Belt)• Kaniago (Asankrangwa Belt)

5

Page 6: September 2009 Investor Presentation

Gold Projects: Tanzania

Tanzania: Gold & DiamondsLake Victoria Goldfields:

Area with over 50 million oz in gold reserves

• Itilima Project (43-101): gold and diamonds

• Lwenge/Geita Gold Project

• Kishapu

• Lalago

Other properties in Tanzania:• Vukene

• Kilindi

6

Page 7: September 2009 Investor Presentation

Priority Project: Sian

Here is what we have:• Sian – a fully permitted past-producing open pit gold mine on the Ashanti Gold

Belt in Ghana

• A 400,000 oz gold deposit with potential to grow to at least one million oz

• Existing CIL gold processing plant

• A renewable 30 year mining lease

• Completely surrounded by Newmont Mining

• A feasibility study done in 1995– currently being updated by EPC Engineering and Projects Company Limited (SA)

7

Page 8: September 2009 Investor Presentation

Aiming for a Multimillion oz Deposit

GhanaSian & Kwahu Praso are contiguous

licences

• 160 sq km of prime ground for gold

Current NI 43-101 Resource

• 400,000 oz gold deposit @ 2.3 g/t

• 800,000 oz in gold potential from preliminary drilling to be tested

• Analysis of drill sections to be confirmed in next drill program

Only 10% of target areas drilled to date

8

Page 9: September 2009 Investor Presentation

Sian Open Pit

9

Page 10: September 2009 Investor Presentation

Sian Processing Plant

10

Page 11: September 2009 Investor Presentation

Sian Power Is in Place

11

Page 12: September 2009 Investor Presentation

Sian Infrastructure Is in Place

12

Page 13: September 2009 Investor Presentation

Sian Gold Project

Sian:• Potential multimillion oz deposit supported by geology, dixcove granitoids

• 16 km strike length gold anomaly, less than 10% drilled to date

• Sian structures extend into contiguous Praso project (100% Midlands)

• 14,000 metres of drilling since October 2006

• 400,000 oz @ 2.3 g/t based on drilling to 120 m

• Double digit grades below 120 m

Short-Term Plan• Infill drilling in the pit, expand gold deposit to at least 1 million oz• Scoping study followed by update/validation of feasibility study (underway)• VTEM to accelerate drilling

13

Page 14: September 2009 Investor Presentation

Comparable Companies

Name/Symbol Countries Minerals Mkt Cap C $ M 52 wk High/Low C $ Resource oz Au Shares O/S

Midlands Minerals Corporation Ghana Gold 10.2 0.23/0.075 400,000 53.6 milTSX-V: MEX Tanzania Diamonds

PMI Gold Corporation Ghana Gold 14.3 0.19/0.01 (n/a) 118.9 milTSX-V: PMV

Pelangio Exploration Inc. Ghana Gold 29.8 0.435/0.025 (n/a) 78.4 milTSX-V: PX

African Gold Group, Inc. Ghana Gold 9.2 0.64/0.03 (n/a) 59.3 milTSX-V: AGG Mali

Adamus Resources Limited Ghana Gold 24.1 0.325/0.26 + 1,000,000 92.6 milTSX-V: ADU Australia Diamonds

Tasmania

AMI Resources Inc. Ghana Gold 2.5 0.085/0.01 122,000 32.2 milTSX-V: AMU

Canaco Resources Inc. Tanzania Gold 2.5 0.19/0.02 (n/a) 48.4 milTSX-V: CAN Mexico Diamonds

Silver

14

Page 15: September 2009 Investor Presentation

Why We Are Different

• Quality projects and locations

• Near-production past open pit gold producer – Sian – Ghana

• 40% institutional investment support

• Politically stable gold producing countries

• Focused on gold

• No debt

15

Page 16: September 2009 Investor Presentation

Next Steps 2009/2010

Focus on existing known drill targets to expand gold deposit to increase 400,000 oz to at least 1 million oz

• Up to 20,000 metres of drilling planned• Sian Main Zone – up to 12,000 metres

• Drilling of waste dumps – 2,000 metres

• Test down plunge extensions of main lenses below 120 m

• Infill drilling to increase quality of resource to measured & proven

• Test at greater depth

• New zones and extensions – 2,000 metres

• Mpeyo zone and extensions – 2,000 metres

• Kwahu Praso – 2,000 metres

• Airbone VTEM survey to accelerate drilling for a multi-million oz deposit

16

Page 17: September 2009 Investor Presentation

Financing Required & Work Plan

Up to USD $6 million

• Expand gold resource to at least 1 million oz

• Infill drilling within the pit

• Infill drilling on northern and southern extensions

• Drill at depth – below 120 metres

• Extend northern and southern extensions

17

Page 18: September 2009 Investor Presentation

Financing Required & Work Plan

• Focus on known areas

• Shaded areas are scout test drilling areas to expand the resource

• At least 20% of the resource to be upgraded to measured category

18

Page 19: September 2009 Investor Presentation

Results Expected

• Increase the indicated resource on Sian to at least one million oz

• Upgrade at least 20% to measured and proven resource

• Complete scoping study and update Sian feasibility study

• Complete a VTEM airborne survey to accelerate drilling on Sian and Praso

19

Page 20: September 2009 Investor Presentation

Use of FundsPriorities – Sian/Praso

Sian• 2,000 metres drilling on waste dumps (RC)• Up to 12,000 metres on Sian Main Zone

• Test down plunge extensions below 120 m• Infill drilling in the pit (DDH)

• Increase the resource• Upgrade resource to measured/proven

• Test at greater depth (DDH)• 2,000 metres new zones and extensions (RC)• 2,000 metres - Mpeyo zones and extensions (RC)

Praso• 2,000 metres

Sian/Praso• VTEM airborne survey

• Approximately 1,000 line kilometres• Data interpretation

20

Page 21: September 2009 Investor Presentation

Use of Funds (USD)Ghana and Tanzania

GhanaGhana property payments $100,000

Sian drilling (RC & DDH) 3,250,000

VTEM Sian/Praso – 1,000 line km 250,000

Kaniago 250,000

TanzaniaSoil surveys and property maintenance 200,000

CorporateWorking capital 1,000,000

Contingency 450,000

Total: USD $6

million 21

Page 22: September 2009 Investor Presentation

Use of Funds

22

Page 23: September 2009 Investor Presentation

Key Management

Kim F. Harris, MA – President and CEO- Founder of Midlands- Over 20 years of experience in Africa, including 12 in exploration

Pierre Lalande, PGeo – Senior Geologist- Chief Geologist for IAMGold Corp. from 1994 to 2001- Previously with Watts, Griffis and McOuat Ltd.- Over 35 years of international geological experience, with extensive experience in West Africa

Paul E. Singer, CA – CFO- Over 30 years’ experience as a CA in private practice

Isaac T. Adjovu (Geologist) – Regional Exploration Manager, Ghana- Over 20 years of experience in Africa- Experience as a Consulting, Exploration, and Senior Geologist with BRGM, Ashanti, and Newmont Mining- Chief Executive of Geodita Resources Ltd. for over six years

Constantine Moshy (Geologist) – Exploration Manager, Tanzania- Over 30 years of experience in exploration and geology- Has worked with the Ministry of Energy and Minerals and as a Chief Field Exploration Geologist with a private company

Naomi Benedikt – Controller and AVP Administration- Many years of experience in management and accountancy, previously a Controller in large property management firms

EPC Engineering and Projects Company – Project Manager and Operator- Broad African experience in project engineering, plant operations and project management

23

Page 24: September 2009 Investor Presentation

Directors

Edward A. Harris – Chair - VP and Portfolio Manager with McLean Budden Ltd. since 1990, with 34 years of experience in the financial services industry

Kim F. Harris, MA – Vice Chair- Founder of Midlands, with over 20 years of business experience in Africa, including 12 in exploration

Pierre Lalande, PGeo- Chief Geologist for IAMGold Corp. from 1994 to 2001, previously with Watts, Griffis and McOuat Ltd.- Over 35 years of international geological experience, with extensive experience in West Africa

Darryl Levitt, LLB- Of Counsel with McLeod Dixon LLP- Extensive experience with financings, mergers, and acquisitions in the mining sector- Several years’ experience in mining and securities law; licenced to practice in Ontario and South Africa

R. John Carruthers- Director of Industrial Business Development with Casebank Technologies Inc. from 1999 to 2004- Former Manager with Deloitte & Touche until February 1999

Mark B. Keatley, MBA, MPhil, MA- CFO of Ashanti Goldfields Ltd. from 1994 to 2000- Senior management positions in International Finance Corporation, World Bank, Ford Motor Company, UK

Karl Schmed- President, Global Colour Link & Associates

Noel Nedrick- Former commercial banker with TD Bank

24

Page 25: September 2009 Investor Presentation

Contact Information

Head Office1210 Sheppard Avenue East, Suite 302Toronto, OntarioCanada M2K 1E3

Tel: +1 416 492 6992Fax: +1 416 492 6993E-mail: [email protected]

Accra, Ghana

Aviation House, Suite 203PO Box 30679, KIAAccraGhana

Tel: +233 (0) 21 772 [email protected]

Shinyanga, Tanzania

PO Box 1175ShinyangaTanzania

[email protected]

Sian, Ghana; April 2007

25


Recommended