Board Meeting

AUGUST 13, 2020

SANTAROSAPLAINGROUNDWATER.ORG 1

Virtual MeetingProtocol1. Please note that the meeting

is being recorded

2. Mute your phone

3. For each agenda item, afterthe staff report the Chair willask for comments from theBoard and then the public

4. If you have a question beforethe staff report is complete,please use the “chat” or“raise your hand”

Page 2: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Roll Call

SANTAROSAPLAINGROUNDWATER.ORG 2

Member Agency Directors AlternatesCity of Cotati Susan Harvey Mark Landman

City of Rohnert Park Pam Stafford Susan Adams

City of Santa Rosa Tom Schwedhelm Vice-Chair Dick Dowd

City of Sebastopol Michael Carnacchi Neysa Hinton

County of Sonoma Shirlee Zane Susan Gorin

Gold Ridge Resource Conservation District Joe Dutton Mel Sanchietti

Independent Water Systems Evan Jacobs Michael Spielman

Sonoma County Water Agency Lynda Hopkins Chair Susan Gorin

Sonoma Resource Conservation District John Nagle Walt Ryan

Town of Windsor Debora Fudge Dominic Foppoli

8/13/2020

Page 3: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Agenda

1. Call to Order and Roll Call

2. Public comment on matters not listed on the agenda but within the subject matter jurisdiction of the board

3. Consent Calendara. Approve Minutes of June 11, 2020 Board Meetingb. Approve Year-to-Date Financial Report

4. Directors/Subcommittee Report

5. Advisory Committee Report

6. Information Itemsa. Groundwater Sustainability Plan and Sustainable

Management Criteria updates b. Groundwater User Registration Program

SANTAROSAPLAINGROUNDWATER.ORG 38/13/2020

Page 4: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Agenda (continued)

7. Action Items

a. Fiscal Year 2020-2021 Budget Adjustments

b. Rural Community Engagement Outreach Contract:

Authorize the Administrator to negotiate a contract

with SCI Consulting to provide outreach services

8. Administrator, Plan Manager and Legal Counsel Report

9. Adjournment

SANTAROSAPLAINGROUNDWATER.ORG 48/13/2020

Page 5: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Public comment on matters not listed on the agenda but within the subject matter jurisdiction of the board

SANTAROSAPLAINGROUNDWATER.ORG 58/13/2020

Page 6: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Consent Calendar

a. Approve Minutes of June 11,2020 Board Meeting

b. Approve Year-to-Date Financial Report

SANTAROSAPLAINGROUNDWATER.ORG 68/13/2020

Page 7: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Directors/Subcommittee Report

SANTAROSAPLAINGROUNDWATER.ORG 78/13/2020

Page 8: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Advisory Committee Report

SANTAROSAPLAINGROUNDWATER.ORG 88/13/2020

Page 9: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Information Items

a. Groundwater Sustainability Plan and Sustainable Management Criteria update

b. Groundwater User Registration Program

9SANTAROSAPLAINGROUNDWATER.ORG8/13/2020

Page 10: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

a. Groundwater Sustainability Plan (GSP) and Sustainable Management Criteria (SMC) update

8/13/2020 SANTAROSAPLAINGROUNDWATER.ORG 108/13/2020

Page 11: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Status of Groundwater Sustainability Plan ActivitiesSanta Rosa Plain Subbasin

Groundwater Flow Model & Water Budgets

Development of Monitoring Networks

Sustainable Management Criteria• Chronic Decline of Groundwater Levels (In progress – pending outcome of 50 year

forecast)• Land Subsidence (In progress)• Water Quality (In progress)• Depletion of Interconnected Surface Water (Initial planning)• Reduction of Groundwater Storage (Initial Planning – additional work pending

completion of water budgets)

8/13/2020

Page 12: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Santa Rosa Plain Hydrologic Model and Water Budgets

8/13/2020 SANTAROSAPLAINGROUNDWATER.ORG 12

Page 13: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Presentation Overview

• General Water Budget Components and SGMA Requirements• Overview of Santa Rosa Plain Hydrologic Model (SRPHM)

o Summary of model revisionso Application of SRPHM for GSP development

• Overview of results of historical and current water budgets• Next steps for projected water budgets

Water Budget and Model updates presented in six AC Meetings and one Board presentation. Model reflects input received at meetings where possible and applicable.

SANTAROSAPLAINGROUNDWATER.ORG 138/13/2020

Page 14: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Water budget requirements and definitions

In accordance with the GSP Regulations §354.18, the water budget provides an accounting and assessment of:

• the total annual volume of surface water and groundwater entering and leaving the basin

• change in the volume of groundwater in storage

Water budget must include:◦ Inventory of all inflows (supply) and outflows (demand)◦ Summary of both surface water and groundwater budgets◦ Evaluation of changes of groundwater in storage◦ Estimation of groundwater overdraft (if applicable)◦ Estimation of sustainable yield

Three water budgets for GSP:1. Historical conditions 2. Current conditions3. Projected conditions over the 50-year planning and

implementation horizon

SANTAROSAPLAINGROUNDWATER.ORG 14

From: Water Budget BMP, California Department of Water Resources, 2016

8/13/2020

Page 15: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Water Budgets – Time Periods

SANTAROSAPLAINGROUNDWATER.ORG 15

Time Period

Proposed Date Range Water Year Types Represented in Time Period

Historical water years 1976 to 2018 Very dry: 1Dry: 7Normal: 20Wet: 13Very wet: 2

Current water years 2012 to 2018 Very dry: 0Dry: 2Normal: 4Wet: 1Very wet: 0

8/13/2020

Page 16: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Groundwater Modeling Overview• Physically-based representation of groundwater and surface-water.• Include important processes such as groundwater pumping,

precipitation and recharge, aquifer properties, and groundwater-surface water interaction.

• Primary tool to understand and quantify the movement of water through the subsurface, and how, for example, groundwater pumping impacts the storage of groundwater in an aquifer.

Santa Rosa Plain Hydrologic Model (SRPHM) Updates •Model developed by USGS: SRPHM V1.0•Model being updated here: SRPHM V1.0+

SANTAROSAPLAINGROUNDWATER.ORG 168/13/2020

Page 17: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

SANTAROSAPLAINGROUNDWATER.ORG 17

Now Finished Up Next Future Work

Update Model1. Incorporate new Ag Package

to estimate agricultural groundwater pumping

2. Refine rural residential demands

3. Update model through 2018A. ClimateB. Land Use Changes C. Pumping

4. Check overall model calibration, recalibrate if needed

Calculate Water Budget from Model Output1. Summarize historical and

current water budgets

Prepare future model 1. Develop climate change

inputs 2. Develop estimates of

projected land-use change, including rural domestic and agricultural growth

3. Develop projected model

Run Future Scenarios to Iteratively Evaluate: 1. Sustainable Management

Criteria 2. Projects and Actions

1. Finalize Future Scenarios for Sustainable Management Criteria and Projects and Actions

2. Start implementing SRPHM 2.0 for GSP 5-yr update (this will likely start following completion of GSP, likely early 2022)

2019/2020 2020/2021 2021/2022

8/13/2020

Page 18: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Model updates

Diffe

rent

use

rs

Update Municipal and Industrial Pumping

*entire model area

Imperviousness

Update Climate inputs

Crop Coverage

Rural domestic parcels with groundwater pumping

Page 19: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

SRPHM Integrated Simulated Processes Provide Detailed Water Budget Estimates

SANTAROSAPLAINGROUNDWATER.ORG 198/13/2020

Page 20: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

SRPHM Simulation BoundaryModel footprint covers the Santa Rosa Plain Subbasin and the surrounding Laguna de Santa Rosa watershed

SANTAROSAPLAINGROUNDWATER.ORG 208/13/2020

Page 21: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

SANTAROSAPLAINGROUNDWATER.ORG 21

SRPHM Calibration Assessment –Simulated Groundwater Hydrographs

8/13/2020

Page 22: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Surface Water BudgetInflows, outflows, and net streambed exchangeDuring the historic period, from Water Year 1976 to 2018, on average the groundwater system discharges 300 acre-feet/year to streams. During the current period, from Water Year 2012 to 2018, streams are losing 1,300 acre-feet/year to the groundwater system.

SANTAROSAPLAINGROUNDWATER.ORG 22

outflow from streambed to groundwater

8/13/2020

Page 23: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Groundwater Budget - Inflows

SANTAROSAPLAINGROUNDWATER.ORG 23

Current (WY 2012 to 2018) Groundwater Inflows Budget Summary (acre-feet/year)

Deep Percolation of Precipitation and Applied Water

Streambed Recharge to Groundwater

Septic Return Flows

Subsurface Inflow from Surrounding Watershed

Subsurface Inflow from Neighboring Basins

Mean 25,200 14,900 1,200 2,000 7,400

8/13/2020

Page 24: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

SANTAROSAPLAINGROUNDWATER.ORG 24

Groundwater Budget - Outflows

Agricultural Pumping

Groundwater ET

Subsurface Outflow to Adjacent Basins

Discharge to Streams

Surface Leakage

M&I + Rural Domestic

Mean 10,400 9,500 4,700 13,700 5,200 9,500

Current (WY 2012 to 2018) Groundwater Outflows Budget Summary (acre-feet/year)

8/13/2020

Page 25: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

SANTAROSAPLAINGROUNDWATER.ORG 25

Groundwater storage has declined an average of 600 acre-feet/year during historical period. Variations in groundwater pumpageand climate are main determinants of storage decline. Current period shows increased rate of decline, driven by the drought conditions in this period.

Historical (WY 1976 to 2018)

Current (WY 2012 to 2018)

Mean -600 -2,100Minimum -22,000 -12,900Maximum 20,000 20,000Median -3,000 -4,500

8/13/2020

Page 26: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

SANTAROSAPLAINGROUNDWATER.ORG 26

In general, total groundwater pumpage has remained relatively constant since 2000, with perhaps some shifting between components of the pumping over the years.

Historical (WY 1976 to 2018) Groundwater Pumpage

M&I Rural Domestic

Agricultural Pumping

Mean 7,900 2,600 9,100Minimum 4,800 2,000 5,700Maximum 11,100 2,900 13,900Median 8,000 2,600 9,000

Current (WY 2012 to 2018) Groundwater Pumpage

8/13/2020

M&I Rural Domestic

Agricultural Pumping

Mean 7,000 2,900 10,400Minimum 4,800 2,900 8,700Maximum 8,800 2,900 11,400Median 7,300 2,900 10,400

Page 27: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Next Steps –Projected Water Budgets Development

SGMA Requirements and Model UseComparison of simulated versus observed groundwater levels and trends, and other hydrologic outputs, indicate that the model reasonably well calibrated. Overall, the model is well-suited for satisfying SGMA requirements and conducting the analyses required in developing a Groundwater Sustainability Plan.

Next Steps for Developing Future ScenariosGroundwater conditions 50-years into the future

Incorporate projections of land use change, climate change, and other changes in groundwater demands (such as population increase). Land Use Change and Projected Water Demands Workgroups

The results of the simulation will be used to assess how the Sustainability Indicators respond to the changing climate and groundwater demands in the future.

If undesirable results are simulated to occur, the GSP will need to plan for projects and management actions that respond to the undesirable results.

SANTAROSAPLAINGROUNDWATER.ORG 278/13/2020

Page 28: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

SANTAROSAPLAINGROUNDWATER.ORG 28

Discussion/Questions?

8/13/2020

Page 29: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

b. Groundwater User Registration Program

8/13/2020 SANTAROSAPLAINGROUNDWATER.ORG 298/13/2020

Page 30: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Groundwater User Registration Program (GRP) – Key Elements of Implementation

◦ Working group • Program development and implementation• Beta test design

◦ Dedicated Registration Program webpage• Interactive map, survey form, program information

◦ Customized GSA groundwater database• Accommodate updates and new data fields

◦ Interactive engagement• Staff, Advisory Committee, Board, and other Sonoma County GSA’s

◦ Enhanced outreach by GSA and members• Clear and informative notification mailer for parcel owners in the SRP• Grant funded focused outreach

SANTAROSAPLAINGROUNDWATER.ORG 308/13/2020

Page 31: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Groundwater User Registration Program (GRP) – Beta Test – Coming Soon!Participants include Advisory Committee members from all 3 GSAs, plus additional groundwater users new to the GSA.

Beta testers will be provided:• Secure link to the beta Groundwater User Registration Program webpage

− Describes program and provides framework and links to program tools and information• Interactive map

− Determine if a user parcel is in/out of the basin

− Review known and/or assumed groundwater use information maintained by GSA for parcels in basin • Auto-populated information exchange form

− Allows review of parcel groundwater use info and opportunity to provide corrected and additional info• Groundwater User Registration Program Glossary • A form to provide organized comments and feedback on each section of the program

SANTAROSAPLAINGROUNDWATER.ORG 318/13/2020

Page 32: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Groundwater User Registration Program (GRP) – 2020 Development Schedule

January 13 – Advisory Committee meeting

◦ Input on registration program elements and plan

February 13 – Board meeting◦ Input on registration program progress and plan

March 9 Advisory Committee meeting◦ Input on registration program beta testing

April 9 – Board meeting◦ Delayed registration program beta testing due to

COVID-19

May 11 – Advisory Committee meeting June 11 – Board meeting

June 22 – Added Advisory Committee meeting

July 13 – Advisory Committee meeting

August 13 – Board meeting

September –Launch of beta test

September 14 – Advisory Committee meeting

October 8 – Board meeting

Oct 19 – Added Advisory Committee meeting

Oct/Nov – Anticipated launch of Groundwater User Registration Program

SANTAROSAPLAINGROUNDWATER.ORG 328/13/2020

Page 33: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Groundwater User Registration Program (GRP)– Next StepsProvide feedback to staff regarding the schedule, beta test, and any aspect of the Groundwater User Registration Program.

SANTAROSAPLAINGROUNDWATER.ORG 338/13/2020

Page 34: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Action Items

a. Fiscal Year 2020-2021 BudgetAdjustments

b. Rural Community Engagement OutreachContract: Authorize the Administrator tonegotiate a contract with SCI Consultingto provide outreach services

SANTAROSAPLAINGROUNDWATER.ORG 348/13/2020

Page 35: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

a. Fiscal Year 2020-2021 Budget AdjustmentsTo properly account for the increased spending and income associated with the Proposition 68 grant, staff proposes the Fiscal Year 2020-21 Budget be adjusted.

8/13/2020 SANTAROSAPLAINGROUNDWATER.ORG 358/13/2020

Page 36: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Background Budget adjusts for the GSA entering into an agreement with the California Department of Water Resources for an additional $1 million in grant funding from Proposition 68. These grant funds must be spent by summer 2022.

In FY 2020-21, Proposition 68 grant funding and expenditures will total $533,000 as follows:

SANTAROSAPLAINGROUNDWATER.ORG 368/13/2020

Page 37: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Staff RecommendationStaff recommends the Board adopt Santa Rosa Plain GSA Resolution No. 2020-002 approving the Fiscal Year 2020-21 budget adjustment and authorize the Administrator to sign the budgetary adjustment form.

The proposed changes would result in no net increase in FY 2019-20 budget.

SANTAROSAPLAINGROUNDWATER.ORG 378/13/2020

Page 38: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

b. Rural Community Engagement Outreach Contract: Authorize theAdministrator to negotiate a contract with SCI Consulting toprovide outreach services

The $1 million Proposition 68 grant includes funding for Rural Community Engagement. Through a competitive process, a consulting team led by SCI, Inc., has recommended by a selection panel to conduct the project. This item would authorize staff to negotiate on behalf of the Agency for community engagement consulting services.

8/13/2020 SANTAROSAPLAINGROUNDWATER.ORG 388/13/2020

Page 39: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

History◦ The GSA received Proposition 68 grant funding for Rural

Community Engagement program◦ Five consulting teams responded to request for proposals◦ Panel unanimously recommended SCI Consulting Group

SANTAROSAPLAINGROUNDWATER.ORG 398/13/2020

Page 40: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Project ProposalProject includes the following elements:◦ Research: Focus groups and a mailed survey to all potential well

owners in basin◦ Funding options analysis◦ Development and execution of an engagement plan

SANTAROSAPLAINGROUNDWATER.ORG 408/13/2020

Page 41: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Consultant Contract◦ The Consultant would be engaged by all three basins◦ Non-direct costs would be shared equally among basins; direct

costs would be basin specific◦ Proposed contract for Santa Rosa Plain is a not-to exceed

amount of $47,000

SANTAROSAPLAINGROUNDWATER.ORG 418/13/2020

Page 42: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Staff RecommendationAuthorize the Administrator to negotiate a contract for community engagement services with SCI Consulting Services for an amount not-to-exceed $47,000. The project is funded through Proposition 68 grant-funded services and is included in the FY 2020-21 budget adjustments.

SANTAROSAPLAINGROUNDWATER.ORG 42

Page 43: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Administrator, Plan Manager and Legal Counsel Report

SANTAROSAPLAINGROUNDWATER.ORG 438/13/2020

Page 44: Santa Rosa Plain Groundwater Sustainability Agency Board ...santarosaplaingroundwater.org/wp-content/uploads/... · 8/13/2020  · June 11 – Board meeting. June 22 –AddedAdvisory

Adjournment

SANTAROSAPLAINGROUNDWATER.ORG 448/13/2020