7/27/2019 SAIC-D-2020 Rev 2
1/3
7/27/2019 SAIC-D-2020 Rev 2
2/3
T&I W itnessed QC Record Reviewed Work Verified
4- SAES-J-400 -- Temperature, 31 May 20045- PIP-VEFV1100/1102 -- Process Industry Practices (Fabrication/Installation Details), 21 April 19996- PIP-PCFTE000/102 -- Temperature Measurement Fabrication Details, April 2000
1- SAES-D-109 -- Design of Small Tanks, 30 November 2003 & 04 January 2006 (on Dec 2005 Cutoff CD)2- SAES-J-300 -- Level, 30 March 2005
Contractor / Third-Party Saudi AramcoConstruction Representative* PMT Representative
Work is Complete and Ready for Inspection:
ITEMNo.
ACCEPTANCE CRITERIA REFERENCE
3- SAES-J-200 -- Pressure, 31 May 2003
REMARKS:
PASS FAIL N/A RE-INSP DATE
CONTRACTOR / SUBCONTRACTOR
Inspection of Tank Trim Installation SAIC-D-2020 1-Dec-06 MECH-
REFERENCE DOCUMENTS:
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 ( Standards Cutoff - December 20 05)
SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER
PROJECT TITLE WBS / BI / JO NUMBER
16
Gauge Glasses conform with the following:a) The pressure and temperature ratings of the gauge glasses
are equal to or higher than the vessel design pressure andtemperature.
b) Minimum rating for the reflex type are 14,000 kPa (2,000psig) at 40C, and for the transparent type 7,000 kPa(1,000 psig) at 40C.
c) Gauge glass gaskets are graphoil or graphite-impregnatedtype material.
SAES-J-300,Par. 5.1.2/5.1.3
15Standpipes are not be used on packed towers, across filter pads,demister pads, in viscous service and in applications where materialsbeing handled contain high concentrations of solids.
17
Pressure gage branch connection up to and including the first block
(root) valve is meeting the applicable Saudi Aramco piping codecorresponding to the vessel pressure rating.
SAES-J-200,Par. 6.1
SAES-J-300,Par. 4.5.4
18 All pressure instrument installations are equipped with vent/drain valves.SAES-J-200,
Par. 6.4
20Thermowells are tapered.and conforms with 5.2.5 Threaded thermowellsare constructed and installed in accordance with Standard Drawing AB-036019
SAES-J-400,Par. 5.2.3
19
Flanged thermowells or reducer flange for thermowell installation arefurnished with ASME B16.5 flanges. (Refer to PIP-PCFTE000/102)a) Flange size is 1- inch minimum.b) Flange matches the piping class rating of the vessel with a
minimum of Class 300# rating.
21Threaded thermowells are constructed and installed in accordance withStandard Drawing AB-036019
SAES-J-400,Par. 5.2.5
SAES-J-400,Par. 5.2.6
22Thermowells are 316 stainless steel machined from barstock materialunless alternative metallurgy is specified or dictated by processconditions.
SAES-J-400,Par. 5.2.4
23
Natural frequency and wake frequency calculations are performed oneach thermowell application, per ASME PTC 19.3. If the calculatedwake frequency is equal to or greater than 80% of the thermowell'snatural frequency, the next shorter standard size well is specified and thewake frequency calculation is repeated until the wake frequency fallsbelow 80% of the natural frequency.
SAES-J-400,Par. 5.3.1
Page 2 of 3
7/27/2019 SAIC-D-2020 Rev 2
3/3
ITEM
No. ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
CONTRACTOR / SUBCONTRACTOR
Inspection of Tank Trim Installation SAIC-D-2020 1-Dec-06 MECH-
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005)
SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER
PROJECT TITLE WBS / BI / JO NUMBER
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED
Name, Organization,Initials and Date:
T&I Witnessed QC Record Reviewed Work VerifiedName, Sign and Date:
Quality Record Approved:
PID Representative
Name, Initials and Date:Performed Inspection Work / Rework May Proceed
Name, Initials and Date:T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date:
QC Inspector
Proponent and Others
Name, Initials and Date:
QC Supervisor
Page 3 of 3