Rank the picture below the Core on the template slideSlide title
36pt
Slide subtitle18pt
Safespur Presentation Johan Langham, Project Engineer, Studsvik 15/05/07
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
International Supply Chain Case Study
• Shipment and treatment of contaminated lead from Sellafield
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
International Supply Chain Case Study
• Supply Chain
• Why process abroad?
• Why metal melt?
• Lead transport and melting case study
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Supply Chain
• NDA (UK) – Ultimate Customer
• BNG Sellafield Ltd (UK) - Customer
• Studsvik (Sweden with UK subsidiary)– Main contractor
• MHF Logistical Solutions (USA) - Subcontractor– MHFLS chosen for their core competence in packaging and bulk
transport of radioactive material
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Studsvik
• Studsvik is a leading nuclear services organisation with 1300 employees worldwide and sales of £100M+ per annum
• Dedicated decontamination and melting facility in Nyköping, Sweden
• To date processed in excess 15,000 tonnes of metal
• Nuclear site license under Swedish regulators
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Studsvik site
Deep sea harbour
Melting facility Incineration facility
ILW facility
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Why process abroad?
• No current facilities in UK that can process metal via melting
• Currently around five melting facilities abroad
• To conduct melting trials a need to engage foreign companies
• Proven technology
• New Defra LLW policy with new policy on import and export
• NDA strategic BPEO to use overseas treatment facilities
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Why melting?
• Acts as an effective decontamination process for most metals and associated radionuclide contamination
• Achieves complete volume reduction of the material
• Homogenises the metal for robust characterisation
• Provides an opportunity for re-use and recycling of valuable material
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Metal melting by recycling
• The Studsvik Treatment Concept is based on recycling the treated material and minimising the volume of contaminated material that is returned to the customer
• Typically >95% of the incoming material to Studsvik is recycled, for lead up to 97% is recycled
Recycling 1 tonne of steel saves:1.5t iron ore0.5t coal1.3t solid waste
Water use 60% lessEmissions 86% lessEnergy 75% less
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Lead melting trial
• Customer sourced candidate material for melting
• Waste characterisation of the material
• Package assessment and package approval
• Transfrontier shipment documentation preparation
• Letter of acceptance for the treatment of the lead
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Lead melting trial
• Loading of the lead– Delivery of the containers to Sellafield– Loading of the lead in the packages– Securing of the packages– Preparation of transportation
paperwork
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Lead Melting Trial
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Lead Melting Trial
• Transport of the lead packages
• Notification to MHFLS and Studsvik regarding transports
• Transport by Road and Sea
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Lead melting trial
• Arrival of material at site
• Unloading of material
• Sorting of material
• Size reduction
• Melting
• Analysis of melted material
• Analysis of secondary waste
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Lead Melting Trial
Assessment
Segmentation
Regulatory Compliance
Transport
Melting Measurement
Ingots Secondary LLW
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Lead Melting Trial•Release of ingots for re-melting is made in accordance with the European Commission’s Recommendations in RP89
•Network of metal producers in Sweden familiar with the ingots as a feedstock
•Secondary wastes (slag, blasting residues, filter dust) are conditioned, packaged and returned to the country of origin for disposal
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Lead Melting Trial
• Currently First and Second Shipment successfully delivered
• First shipment of lead melted successfully with second shipment melting currently being processed at facility
• BNG/Studsvik/MHFLS preparing for third shipment
• Teamwork built on the core competences of the individual companies
Slide title 36 pt
Text 24 pt
Bullets level 220 pt
Summary
• Proven technology
• Supply chain built on core competences of companies
• Successful trial melt
• Further scope for working together