CITY OF RANCHO SANTA MARGARITA CITY COUNCIL
STAFF REPORT
DATE: February 22, 2017
TO:
FROM:
City Council of the City of Rancho Santa Margarita
Jennifer M. Cervantez, City Manager ·~ E. (Max) Maximous, Public Works Director/City Engineer~ BY:
SUBJECT: Planning and Feasibility for City Hall and Bell Tower Regional Community Center Renovation Projects ·
Recommendation
1) Review proposed City Hall and Bell Tower Regional Community' Center (BTRCC) Landscaping, Youth Lounge and Fountain Renovation concept improvements and provide 'additional direction as necessary; and
2) Authorize staff to complete project bid package, with input received, and advertise for bids for the City Hall and BTRCC Landscaping, Youth Lounge and Fountain Renovation Projects.
Background and Discussion
On June 8, 2016, the City Council approved a Seven-Year Capital Improvement Program (CIP), which included the design and construction of the City Hall and BTRCC Landscaping, Youth Lounge and Fountain Renovation Projects. At the City Council meeting of December 14, 2016, staff presented the need for performing the renovation improvements as well as options for the proposed improvements. Below is a summary of the options presented and feedback received:
• Landscaping Renovation Various landscaping elements around both buildings were presented and it was determined that Option B with the Bougainvillea and traditional plant material was the preferred alternative. It was also expressed that the Birds of Paradise plants (both existi"ng and proposed) be eliminated from the proposed improvement plans·. Finally, the City Copncil recommended a redesign of the landscaping at the City Hall and BTRCC entry monuments.
Attachment A illustrates the concept plan with the input received. The plan shows the traditional plant material option that was· preferred and a redesign of the landscaping at the monuments. It also proposes the replacement of all Birds of Paradise with various planting material, as noted below:
o Along El Paseo adjacent to City Hall, plants ·would be replaced with a five gallon strap leaf plant (Lomandra 'Tropic Belle') that grows approximately three feet high.
02/22/17 Item No. 6.1
Page 1
City Hall and BTRCC Renovation Projects February 22, 2017 Page 2
o Along Richard Reese Way: near the driveway entrance, plants would be replaced with Iceberg Roses low Lomandra ‘Breeze’ adjacent to the walkway and Rhaphiolepis ‘Clara’ adjacent to the parking lot.
o The Birds of Paradise adjacent to the entry signs would be replaced with Iceberg
Roses and Yellow Lantana. It should also be noted that a site walk was conducted with SAMLARC’s main landscaping consultant for feedback. Input was received regarding the type of rocks to be used on the north side of City Hall and removal of various conflicting trees. No other concerns were noted.
Outdoor Youth Lounge Renovation Attachment B illustrates the concept plan for the youth lounge improvements. The updated concept shows the removal of the chess tables, addition of landscaped pots and additional brick pavers near the proposed picnic bench (with no landscaping except for salvaging two existing trees and four new landscaped pots). The concept plan also shows a layout with and without the retractable canvas shading for clarity purposes. String lighting can also be attached to the shading apparatus.
Fountain Renovation On December 14th, the City Council chose pebble stone as a replacement for the existing interior made up of tile and grouted river rock. Three colors are presented for the City Council’s consideration, “White Diamonds,” “Aqua Blue” and “Irish Mist”. In addition, three colors/patterns are presented for the waterline tile. The City Council also accepted the Holiday Tree option to be mounted in the fountain. Staff will include the purchase, assembly, dis-assembly and storage of the tree platform apparatus in the Holiday Decorations line item during the operating budget development process.
The total amount budgeted for these three projects for FY 2016/17 is $285,000 utilizing Community Development Block Grant (CDBG) and Development Impact funds for the Youth Lounge Renovation Project and the General Fund for the other two projects. Preliminary estimates, including soft costs, based on the concepts included in Attachments A through C are summarized below:
Table 1: Preliminary Conceptual Cost Estimate
Project Preliminary Estimate Landscaping Renovation $174,000 Outdoor Youth Lounge Renovation $59,000 Fountain Renovation $51,000
Total $284,000 Also, a 15% contingency is included due to the conceptual nature of the design thus far. More detailed estimates are included in Attachment D.
Page 2
City Hall and BTRCC Renovation Projects February 22, 2017 Page 3 Alternatives The City Council may provide additional alternative options for staff to explore, as appropriate. As the City is utilizing a landscape architect consultant for the landscaping and outdoor lounge renovation projects, changes in conceptual designs will have a fiscal impact related to additional design iterations. Fiscal Impact There is no fiscal impact associated with this report. Upon receiving direction from the City Council, the bid documents for the projects would be completed and advertised for construction bids. Once bids are received, staff will return to the City Council with a recommendation for a construction contract award, including a detailed forecast on the fiscal impact. Attachments
A) Landscape Renovation Concepts B) Outdoor Youth Lounge Renovation Concepts C) City Hall Fountain Renovation Concepts D) Related Preliminary Cost Estimates
Page 3
Page 4
PRELIMINARY PLANCITY HALL LANDSCAPING RENOVATION PROJECTCITY OF RANCHO SANTA MARGARITA
SHEET 1
L_~-~ ROCK- BROWN CRUSHED
( .., ,-1-, -. ) ' - - LIGUSTRUM JAPONICUM 'TEXANUM'
PODOCARPUS HENKELII
ROSA X 'FLOWER CARPET RED'
,-, ,' / / ' \ ; ' ~ RHAPHIOLEPIS INDICA 'CLARA'
DIANELLA TASMANICA VAR.
c~::~l~:~ ,_ /
PENNISETUM SETACEUM 'RUBRUM'
//'~''>-)
\"'--<._.._,_, . ./ ALOE MACU~TA
CD
CJ
0
00
CJ
Ef6 ::;
..
I : I I
I:
I:
I
I: • I I I I
I: II I
II I
I I.
, I I
'"" I I I ' ' '
A
I I I I I I , I I I I I I L __ J
----------------~
EL PASEO
--- ---
EL PASEO
I I I I
. ' I \ , ,
\ '- ·
', -'L
BGB IDESIGN GROUP Planning Urban ~ign
31115 C 1 Airwa,. A .. t!n ue Co> to Mt!>a, CA '!I :t-li l-li 0 t 71" 5-4 5 l!llll'll F: 714 5-4 5 l!ll'!lll bg b-1 n< .<D,.
• I
•
I
• I
• I
I
• I
00
I
Page 5
CITY OF RANCHO SANTA MARGARITA
SHEET 2
PRELIMINARY PLANCITY HALL LANDSCAPING RENOVATION PROJECT
·····························································~~·-,-···· • • • • • ~
• • • •
: ~~~~~~~~~~~~~~~~~v~ .__ • • • • • • • • • • • Blanket' • • • • • •
•••••
................................... .,Aifll••······································ TYPICAL AREA 'E'
• • • • • • •
• • • • • @ • • • •
•••
• ••••••••••••••• TYPICAL AREA 'B'
Rosa x 'Flower Carpet Red'
·······~ • • • • • • •
• • • • @ • • • • • • • ••••••••••••
• • • • •
• ........
Caris!lla • • • • • • • • • •
•••••••••••••••••••••••••••••• • •
i • i
•••••••••••• •••••••••••••••
•
• ••••••
• • • • • • • • • • • • • • • • • ••••••••• TYPICAL AREA 'A' i
• Lantana x 'New Gold' i
i • • i
Senecio vital is Agave angustifolia variegata
I • • • • • • ~
L...,--d-.11--" •
• • • • • • • • • • • • • • • • •
i • i • • i
: ......... . • TYPICAL AREA 'C' : ,-------.---=;~ ::;o=-~ • • • •
.... l ... •• •••••
····································~ • Lomandra hystrix 'Tropic Belle'l~~~r:=?R=~~~~~;:;:~~~~t;:;~;:;:~~·
• • : \ Lomandra kl ~*~ial ·sreeze' :
i.l~. . ...... r.-.-.-.-.~-.-.--7.~.-.-.-.-.-.~.-.-.-.-.-.-.~.-.-.-.-.-.-.~.-.-.-.-.-.~.-.-.-.-.-.-.~.-.-.-.-.-.-.L.-.-.-.-.-.~.-.-.-.-.-.-.~.-.-.-.-; TYPICAL AREA 'D'
•••••••••••••• ••••• ••••• • •••••
@I
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
• • • • ~ . • • • • • • • • • • • • • . .......................................... ..
BGB IDESIGN GROUP Plllnnlng Urban ~sign
3 1 115 C 1 AirwaJ AYII!n ue Costm Mll!sa, CA '!I :lli :l-lii 0: 714 51115 2BifB F: 71111 51115 211'gll bg b-in~ .~Dill
Page 6
CITY OF RANCHO SANTA MARGARITA
SHEET 3
PRELIMINARY PLAN / LANDSCAPE ELEVATIONSCITY HALL LANDSCAPING RENOVATION PROJECT
Front of Ci Hall/Fountain Courtyard
North Garden
EXISTING
- 0 . - - ..
- . "' . :~--~~~:~: -
-- --
. - -. . --- . -- -
--- ' >. ' .
EXISTING
EXISTING
North Trash Enclosure Elevation
EXISTING
Rear Entrance of City Hall
~ -' .. ' •
-- ~ .
---~-~__.,
Option A - Variegated Dianella Option B - Carissa Groundcover
BGB IDESIGN GROUP Landsc:apl! An:hftl!ctuR! Pllllnnlng Urban Dl!!ilgn
31115 C 1 Airway AYII!n ue Costm Mll!sa, CA 9 :llli 2-lii 0 ~ 71 4 5'11 5 2Bifl F: 7 U 5'11 5 211'!111 bg b-in~ .~DIll
Page 7
CITY OF RANCHO SANTA MARGARITA
SHEET 4
PRELIMINARY PLAN / LANDSCAPE ELEVATIONSCITY HALL LANDSCAPING RENOVATION PROJECT
Existing
Entry Sign
Conctractor to trim existing trees behind entry signage
Replanted with Dianella Var., Red/pink Flowering Bougainvillea, White Iceberg Roses, New Pots with Echeveria and Senecio, and Echeveria 'Afterglow' in front of light.
BGB IDESIGN GROUP l8ndsc:ape Archlb!ctu~ Plllnnlng Urban ~sign
3 1 115 C 1 AirwaJ AYII!n ue Costm Mll!sa, CA '!I :lli :l-lii 0: 714 51115 2BifB F: 71111 51115 211'gll bg b-in~ .~Dill
Page 8
Page 9
THIS PAGE INTENTIONALLY LEFT BLANK
Page 10
CITY OF RANCHO SANTA MARGARITA
SHEET 5N
PRELIMINARY PLAN / YOUTH LOUNGE COURTYARD IMPROVEMENTSBELL TOWER REGIONAL COMMUNITY CENTER
1\/ I
y
---
! v
~~ \ )
~ v I
) I
\ I
~
I
'
\I I
'
/ """ I I ;,..
'\lf ~"' /
v
~ \ ../
~
·~ ~
I~ "' \I
"'
I EXISTIN TREES
~
G
EXISTING BENCH P.I.P. TYP.
EXISTING COURTYARD EXISTING SALTILLO BRICK PAVERS
• •
Existing Courtyard Images Proposed 8' Picnic Table w/Resin coating
PODOCARPUS GRACILIOR COLUMNS FOR PRIVACY 8' PICNIC BENCH
\11 r~" r"\~~x.v- ;--,~~: I"' • 1\.r • j\ · 11 • )\ • ·" • ';;
POTS WITH GRASSES
EXISTING JAPANESE MAPLE
PERMEABLE HARDSCAPE -ARIZONA CRUSHED ROCK
y >~ ---'
~; - a /"' / ,•\ ~
~I -~ p - ·- p , • '
./ v - I ~ . . ;. -- -, .. -- ' . .
" ' ', . ' -,, ' ' . ' --
-
/ ? @ '
7 .
I
~ [--!\.
)
\ ~
1\/ ' ' - '
~
OPTION 1 - W/0 SHADE
Plant Material
I
/ '
v ~
/
•'
[\( ' ,'\ '
p i <
' \.; '
~
/ _:.>
SALTILLO BRICK PAVERS TO MATCH EXISTING
PERMEABLE HARDSCAPE -ARIZONA CRUSHED ROCK
City of Laguna Woods· Club House
Canvass Shade Cloth Overhead
\I y
--
ll ! ~ @
1--\'\. "' J
)
I
EXISTING CRAPE MYRTLE TREE
\ -----j---jf----J-- SLIDE ON WIRE SYSTEM WITH tf==~---4~-b---~--b----b------f--trl CANVAS SHADE CLOTH -COLOR
TO BE SELECTED
\( \(-7•-... Hf----'.!y'------ll-- - -'-r------,--_j__---111---\yf---~··. ·-·
W" \/
OPTION 1 A - WITH SHADE
PLANT SCHEDULE COURTYARD 1
SHRUBS BOTANICAL NAME I COMMON NAME SIZE
/'~'7 7.-'v'-'
LOMAN ORA LONGIFOUA 'BREEZE' I DWARF MAT RUSH 5 GAL
-j~~l; PENNISETUM SETACEUM ' RUBRUM ' I PURPLE FOUNTAIN GRASS 5 GAL
0 PODOCARPUS GRACILIOR 'COLUMN' I FERN PINE 15 GAL COLUMN
Courtyard Pot
BGB I DESIGN GROUP Lilnd!illilpl! Arehlb!ctu~ Pllnning Urb.lln lll!:ilgn
31115 C 1 Alrwi>J A11<!n u" Co>to M<!>.&, CA 916:1.6 0' 71"' ~.4 ~ :i!BIJB F' 7 u ~.4 ~ 211911 bg b-i n<.<o,.
Page 11
Page 12
THIS PAGE INTENTIONALLY LEFT BLANK
Page 13
EXISTING CONDITIONS CITY HALL FOUNTAIN RENOVATION PROJECT City of Rancho Santa Margarita
Calcium and Chemical Buildup
Damaged Coping
Non-functioning Lighting
Existing Fountain
Page 14
a.5
PROPOSED RENOVATION ELEMENTS CITY HALL FOUNTAIN RENOVATION PROJECT City of Rancho Santa Margarita
New Coping and Exterior Stone Veneer
New Lighting with Alternating Colors
Tree Platform within Fountain (Public Works Annual Budget) Replace Existing Brown Stone and Tile with Pebble Stone
New Coping New Waterline Tile Color Options
New Pebbletech Stone Color Options
Page 15
Page 16
THIS PAGE INTENTIONALLY LEFT BLANK
Page 17
Item No.
ITEM Unit QuantityUnit
PriceAmount 1
CONSTRUCTION1 Plant removal and stump grinding LS 1 $ 15,000.00 $15,0002 Trellis for Bougainvillea pots (rear) EA 10 $ 750.00 $7,5003 Trellis for Bougainvillea at columns (front) EA 14 $ 1,500.00 $21,0004 24" box EA 13 $ 300.00 $3,9005 15 gal. (shrubs) EA 18 $ 125.00 $2,2506 15 gal. (bougainvilleas) EA 24 $ 210.00 $5,0407 5 gal. (various) EA 1116 $ 25.00 $27,9008 1 gal. (various) EA 1195 $ 10.00 $11,9509 Rock mulch and cobbles LS 1 $ 8,000.00 $8,000
10 Irrigation repair / renovation LS 1 $ 10,000.00 $10,00011 Site preparation LS 1 $ 10,000.00 $10,000
SUBTOTAL $122,540MOBILIZATION / DEMOBILIZATION % --- 5% $6,127
CONSTRUCTION COST ESTIMATE $128,667
SOFT COSTS
DESIGN % --- 10% $12,867
CONSTRUCTION MANAGEMENT AND INSPECTION % --- 3% $3,860
ARBORIST % --- 5% $6,433
ADVERTISEMENT/REPRODUCTION LS 1 $2,000.00 $2,000
PLANNING LEVEL CONTINGENCY % --- 15% $19,300
SUBTOTAL $44,460
TOTAL PROJECT COST ESTIMATE $173,127
City of Rancho Santa Margarita City Hall & BTRCC Landscaping Renovation Project
Preliminary Conceptual Estimate of Probable Construction CostFebruary 2017
Page 18
Item No.
ITEM Unit QuantityUnit
PriceAmount 1
CONSTRUCTION1 Planting demolition and cleanup EA 1 $1,800.00 $1,8002 New paving: Saltillo brick – concrete base SF 271 $32.00 $8,6723 Group table and benches EA 1 $3,500.00 $3,5004 Decorative pots w/ plants and irrigation EA 5 $650.00 $3,2505 Decorative crushed rock SF 44 $18.50 $8146 Irrigation modifications SF 150 $4.00 $6007 Drainage EA 1 $1,500.00 $1,5008 Overhead sliding shade awning EA 1 $12,000.00 $12,0009 Festival overhead lighting EA 1 $5,000.00 $5,000
SUBTOTAL $37,136MOBILIZATION / DEMOBILIZATION % --- 5% $1,857
CONSTRUCTION COST ESTIMATE $38,993
SOFT COSTS
DESIGN % --- 19% $7,409
CONSTRUCTION MANAGEMENT AND INSPECTION % --- 10% $3,899
ADVERTISEMENT/REPRODUCTION LS 1 $2,000.00 $2,000
PLANNING LEVEL CONTINGENCY % --- 15% $5,849
SUBTOTAL $19,157
TOTAL PROJECT COST ESTIMATE $58,150
City of Rancho Santa Margarita Youth Lounge Renovation Project
Preliminary Conceptual Estimate of Probable Construction CostFebruary 2017
Page 19
Item No.
ITEM Unit QuantityUnit Price
Amount 1
CONSTRUCTION1 Demolition (existing coping, tile, river-rock, etc.) LS 1 $ 2,000.00 $2,0002 Furnish and Install New Coping LS 1 $ 5,500.00 $5,5003 Furnish and Install Stone Exterior SF 160 $ 31.00 $4,9604 Furnish and Install Waterline Tile LS 1 $ 3,000.00 $3,0005 Furnish and Install Pebbletech Stone LS 1 $ 12,000.00 $12,0006 Furnish and Install Lighting LS 1 $ 3,000.00 $3,0007 Furnish and Install Hardware LS 1 $ 2,000.00 $2,0008 Electrical Repairs LS 1 $ 3,000.00 $3,0009 Install New Circulation Pump LS 1 $ 1,500.00 $1,500
SUBTOTAL $35,460MOBILIZATION / DEMOBILIZATION % --- 5% $1,773
CONSTRUCTION COST ESTIMATE $37,233
SOFT COSTS
DESIGN % --- 5% $1,862CONSTRUCTION MANAGEMENT AND INSPECTION % --- 8% $2,979ADVERTISEMENT/REPRODUCTION LS 1 $2,000.00 $2,000PLANNING LEVEL CONTINGENCY % --- 15% $6,840SUBTOTAL $13,681
TOTAL PROJECT COST ESTIMATE $50,914
City of Rancho Santa Margarita City Hall Fountain Renovation Project
Preliminary Conceptual Estimate of Probable Construction CostFebruary 2017
Page 20