Project Number Project Number and Name YEAR location Work Type Project Description

7842 7842-ANDREWS AFB-AMBULATORY CARE 2015 MD Pile Driving, Shoring, Tiebacks, RakersWorked for Manhattan Construction (used rakers as heel blocks) - installed

piles and lagging and rakers

7852 7852-SWATARA BRIDGE 2014-2015-2016 Middletown, PA Micropiles

Ongoing installation of micropiles (178 approximately remaining to do),

approximately 35 feet deep, challenging drilling through existing concrete

abutments

7873 7873-YORK HOSP EARTH RETN UNDERPIN 2015 York, PA Shoring, TiebacksExpansion for the hospital, shoring to facilitate the building of emergency

department and helipad overhead

7890 7890-JHU 33RD ST PAUL 2015 Baltimore, MD Shoring, Tiebacks, Tiedowns, RakersArmada hoffler was the GC, Mixed use building, we utilized the daily utility

ticket on this project sucessfully

7891 7891 - JHU Pedestrian Bridge 2016 Baltimore, MD Micropiles Installation of 76 micropiles for a pedestrian bridge at JHU

7894 7894-MERRIWEATHER POST PAVILION 2015 Columbia, MD Shoring Cantilever shoring

7897 7897-VILLAGE AT ORCHARD-EARTH RET 2015 Winchester, VA Shoring, Raker Raker and shoring for addition to the charles village retirement community

7898 7898-JHU CHARLES VILLAGE 2015 Baltimore, MD TiedownsPart of Armada hoffler project, 3 tiedowns were installed (100 Kips capacity)

drilled 40 feet into rock (per engineer they would not ease up on this, we tried)

7901 7901-ARLINGTON NATL CEMETARY 2015 Arlington, VA Shoring, TiebacksTiebacks for columbarium - addition to the cemetery. Tiered wall system, 2

walls were built and piling crew drove all piling

7903 7903-SR 180 (129) 2015-2016 Williamsport, PA Soil NailsSoil nails through gabion baskets for hawbaker construction. Challenging

project, nails were 23 feet drilled into fill and clay soils

7904 7904-BRETHREN VILLAGE SHORT TERM 2015 Lancaster, PA UnderpinningUnderpinning design and management for WCI (norm adams and Jeremiah) -

matt beihl project manager. We designed and oversaw the construction

7909 7909 - VA 688 Martins Construction 2016 Markham, VA Shoring, TiebacksPhased shoring for Martins construction. Tiebacks, shoring and attachment to

abutments

PROJECT Project Manager – Ryan Smith

Page 2: RRS Project Photos 10-23-16

7842 – Andrews Airforce Base (2015 Andrews AFB, MD)Project Manager – Ryan Smith

Pile Driving, Rakers, Tiebacks, H-Pile Heel Blocks, Timber Lagging

Page 3: RRS Project Photos 10-23-16

7852 – Swatara Creek Bridge (2014-2016 Middletown, PA) Project Manager – Ryan Smith

Micropiles (#14 Bar) – Mostly battered working for Turnpike

Page 4: RRS Project Photos 10-23-16

7873 – York Hospital (2015 York, PA)Project Manager – Ryan Smith

Cantilever Shoring, Tiebacks, Bracing

Page 5: RRS Project Photos 10-23-16

7890 – JHU 33rd & St. Paul Street (2015 Baltimore, MD) Project Manager – Ryan Smith

Tiebacks, Cantilever Shoring, Rakers, Wales, Heel Blocks

Page 6: RRS Project Photos 10-23-16

7894 – Merriweather Post Pavilion (2015 Columbia, MD)Project Manager – Ryan Smith

Cantilever Shoring, Tiebacks, Bracing – Worked for Whiting Turner

Page 7: RRS Project Photos 10-23-16

7898 – JHU Charles Village (2015 Baltimore, MD)Project Manager – Ryan Smith

(3) Permanent Tiedowns –

Worked for Atlantic Caisson

for the work 40 feet deep

completely in compotent Rock

Page 8: RRS Project Photos 10-23-16

7901 – Arlington National Cemetery (2015-2016 Arlington, VA)Project Manager – Ryan Smith

Pile Driving (Team did great!), Tiebacks in Potomac clay, tiered wall

System in soft soils for new columbarium

Page 9: RRS Project Photos 10-23-16

7903 – SR180 Soil Nails 2015-2016 Williamsport, PAProject Manager – Ryan Smith

Very challenging job – 90% complete

Soil Nailing being installed through existing

Gabion Baskets (Bob Horst – Superintendant)

Page 10: RRS Project Photos 10-23-16

Bob and crew enjoying Sticky Bunns during morning safety

Review onsite

Soil nail headed shear studs

With 10”x10” bearing plates

7903 – SR180 Soil Nails 2015-2016 Williamsport, PAProject Manager – Ryan Smith

Page 11: RRS Project Photos 10-23-16

7909 – VA 688 Martins Construction (2016 Markham VA)Project Manager – Ryan Smith

Phased Shoring of 2 Bridge culvert replacements for

Martins Construction in Markham VA