7/29/2019 ROCKS - Database - WORLD (Version 2.01)
1/7
- Road Costs Knowledge System
ROCKS Database - WORLDVersion 2.01, 09/09/02
The World Bank
Roads and Highways Thematic Group
vides no warranty in terms of correctness, accuracy, currentnesse regarding the database. The user relies on the productshe results solely at his or her own risk. In no event will thene else who has been involved in the creation of this productcation or misapplication in the field. The World Bank reserves thens and changes from time to time without obligation to notify any
ons and changes.
Instructions
rding the database structure and input requirements referase Manual that is a Word document included with this
open this workbook, select the "Enable Macros" option at themessage. This workbook contains macros needed touseful tasks:
ation cell to calculate the equationd List cell to obtain a pick list of valid options.
d List cell to filter data based on the contents of the cell.ell to remove a filter.
Additional Information Contactsallao
E-mail: [email protected]
E-mail: [email protected]
3 E-mail: [email protected]
433
Disclaimer
ice - Instructions
mailto:[email protected]:[email protected]:[email protected]:[email protected]7/29/2019 ROCKS - Database - WORLD (Version 2.01)
2/7
Costs abase
Section 2 Section 3
Valid List Valid List Valid List Valid List Valid List Valid List Valid List Valid List Valid List Valid List Valid List
Record - Country - Region Source of Information Cost Description
User User User Project US$ Economic Contin_ nt Defined Defined Defined or Source Report Report Cost Cost Cost Currency Exchange Cost Contract Procurement Contractor Construction Cost Taxes gencies
e Classification 1 Classification 2 Classification 3 Name Section Type Location Date Type Source Code Rate Financing Type Method Type Method Factor (Y/N) (Y/N)
USERCLASS1 USERCLASS2 USERCLASS3 PROJECT SECTION REPORTTYPE REPORTLOCA DATE COSTTY COSTSO CURREN CURREXC COSTFIN CONTRA PROCMETH CONTRACTOR CONSMETH ECOFAC TAXES C ONTING
Page 2 of 7
7/29/2019 ROCKS - Database - WORLD (Version 2.01)
3/7
Section 5 Section 6 Section 7 Section 8
Valid List Valid List Equation Equation Valid List
Road Work Description Road Works Cost and Duration Road Work Cost per Length Road Work Cost per Area Road Work Characteristics
Cost Total Cost per Total Cost per Resurfacing Depth
Predominant Base Physical Price Total Road Work Total Cost per Total Cost per Carriageway Carriageway Pavement Shoulder Number Layer of Surface Base Subbase StructuralWork Work Cost Contingency Contingency Cost Length Duration Kilometer Kilometer Area Area Width Width of Thickness Milling Thickness Thickness Thickness Number Terrain
on Type Activity (M$) (M$) (M$) (M$) (km) (months) ($/km) (2000 US$/km) ($/m2) (2000 US$/m2) (m) (m) Lanes (mm) (mm) (mm) (mm) (mm) (#) Type
AME WORKTYPE WORKACTIVITY COSTBASE COSTPHYSI COSTPRICE COSTTOTA LENGTH DURATIOCOSTPERKM USDPERKM COSTPERM2 USDPERM2 WIDTH SHOULD LANES THRESLAYER THMIL THSURF THBASE THSUBBS SN TERRAIN
Page 3 of 7
7/29/2019 ROCKS - Database - WORLD (Version 2.01)
4/7
Section 9
Valid List Valid List Valid List Valid List Valid List
Patching or Patching or Spot Regrave. Spot Road Work Cost B
Crack Sealing Crack Sealing or Regravelling Regravelling Demolition and Site Drainage and Culverts and Drainage, Protective Works,Pavement Surface Surface Surface Base Unit Cost Quantity Unit Cost Quantity Mobilization Clearance Earthworks Protective Works Minor Bridges Culverts and Minor BridgesType Class Type Material Material ($/m2) (m2/km-year) ($/m3) (m3/km-year) (%) (%) (%) (%) (%) (%)
PAVEMENT SURFCLASS SURFTYPE SURFMATE BASEMATE PACTCHCOS PACTCHQUA REGRACOST REGRAQUA PMOVI PDEMO PEARTH PDRAINAGE PCULVERTS PDRACUL
Page 4 of 7
7/29/2019 ROCKS - Database - WORLD (Version 2.01)
5/7
Section 10
Valid List
Road Work Cost Details (% of Road Work Cost) Other Additional Road Agency Costs (% of Road Work Cost)
by Typical Bill of Quantities (% of Road Work Cost, total=100%) Resources Breakdown Percent of Total Land
ridges Accesses Pavement Courses Pavement Shoulder Line Marking Envi_ Contin_ (% of Road W ork Cost, total=100%) Foreign Foreign Land Acquisition andctures and Junctions Subbase Base Subbase and Base Surface Courses Works and Signs roment Dayworks Other gen. Taxes Labor Material Equipment Currency Currency Acquisition Resettlement Resettlement Design Supervision
(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) Code (%) (%) (%) (%) (%)
ES PJUNCTION PSBASE PBASE PSBASEBASE PSURF PPAVEME PSHOU PMARKINGS PENVI PDAYWO POTHE PCONT PTAXE PLABOR PMATER PEQUIP PFOREIGN FORECODE PLAND PRR PLANDRR PDESIGN PSUPER
Page 5 of 7
7/29/2019 ROCKS - Database - WORLD (Version 2.01)
6/7
' '
7/29/2019 ROCKS - Database - WORLD (Version 2.01)
7/7