BS/PAS1192 and CDE Competence PrimerRobert Klaschka
About Studio Klaschka
We have been using BIM since the practice start in 2001•
Nearlyeveryprojectfrom£100K-£15MintheofficehasusedBIM•
Our business model is to integrate with contractors and consultants to give •them easy access to information we produce
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
start
BIM
BS1192 implementation
pointclouds
BS/PAS1192 +CDE Primer
About Studio Klaschka
We have advised other practices on their BIM systems and implementation•
We have sat on numerous industry panels, advisory groups•
We have written for various industry journals•
WehaveahighprofileasasmallpracticewhouseBIMthroughspeakingat•numerous conferences in the UK, Europe and the US.
Our systems, conventions and protocols are based on BS1192•
BS/PAS1192 +CDE Primer
Find it here:http://shop.bsigroup.com/ProductDetail/?pid=000000000030163398
Find it here:http://shop.bsigroup.com/Navigate-by/PAS/PAS-1192-22013/
Free!Not Free...
BS/PAS1192 +CDE Primer
The alternative to....
‘ConsultantmustembraceBIMworkflows’
BS/PAS1192 + CDE Primer
BS/PAS1192 +CDE Primer
The EIR (employers information requirements)
Refers to the CIC Scope of Services•Levels of detail•Planning of work•Training•Collaboration process•Intergrity and security for the project•Specificinclusionsandexclusions•Copliance plan•Definitionofprojectcoordinates(spacestatement)•Schedule of software including versions•Exchangeofinformation•Clients strategic objectives•Responsibilitymatrix•Schedule of standards and guidance•Competence assessment process•BIM tender assessment details•
BS/PAS1192 +CDE Primer
Pre-Contract BEP (BIMexecutionplan)
Gateway 1 - Demonstration of ability to deliver
SeetheCPixPre-contractBEPtemplate•Rolesandstaffingincludingabilities•Capability of supply chain•Project milestones•ITAssessment(CPixtemplate)•ResourceAssessment(CPixtemplate)•BIMAssessment(CPixtemplate)•
Find it here:http://www.cpic.org.uk/cpix/cpix-bim-execution-plan/
Free!
BS/PAS1192 +CDE Primer
Post-Contract BEP (BIMexecutionplan)
Your Task Team input into the MIDP
SeetheCPixPost-contractBEPtemplate•Roles and detailed resourcing•Revised project milestones•PIM delivery strategy•Approval process•Survey strategy/legacy information•Responsibilitymatrix•Task team information delivery plan•Detailed project standards•
Find it here:http://www.cpic.org.uk/cpix/cpix-bim-execution-plan/
Free!
BS/PAS1192 +CDE Primer
What is a Task Team?
any participant/collaborator in the project•
project manager•
architect, engineer, surveyor•
specialist sub-consultant•
contractor•
specialist sub-contractor•
BS/PAS1192 + CDE Primer
MIDP (master information delivery plan)
BS/PAS1192 +CDE Primer
Okay now we can start work!
BS/PAS1192 +CDE Primer
The alternative is....
Simple-itsdefined!
BS/PAS1192 + CDE Primer
Find it here:http://shop.bsigroup.com/ProductDetail/?pid=000000000030163398
Find it here:http://shop.bsigroup.com/en/ProductDetail/?pid=000000000030217990
Not Free (but worth it!)Not Free...
BS/PAS1192 +CDE Primer
The structure of the Common Data Environment (CDE)
BS/PAS1192 +CDE Primer
Accuracy is the King
Naming•
Revisioning•
Positioning•
Clean•
No cross sharing between disciplines unchecked WIPs
CHECKED BYTHE AUTHOR
WIP ISINTERNAL
BS/PAS1192 +CDE Primer