Revised Draft Seaport Air Quality 2020 and Beyond Plan
Task Force Meeting #5January 10, 2019
July 12, 2018 Board Meeting
2020 and Beyond
Draft Seaport Air Quality Plan
Presentation Overview
September 26, 2018 Task Force Meeting Revised Draft Seaport Air Quality PlanJanuary 10, 2019 Task Force Meeting
• Plan Development Process and Outreach• Revised Draft Seaport Air Quality 2020 and Beyond Plan (Revised Draft
Plan) Volume I—Main Text and Appendices Volume II—Response to Comments (RTC)
• Changes from Draft Plan to Revised Draft Plan• Revised Near-Term (Years 2019-2023) Action Plan (NTAP) and Goals• Grants, Incentives, and Funding• Projects Underway• Next Steps
July 12, 2018 Board Meeting
2020 and Beyond
Draft Seaport Air Quality Plan
Task Force Meetings• #1 February 23, 2018: Reconvening• #2: May 9, 2018: Draft Plan Blueprint• #3: June 21, 2018: Draft Plan Policy Issues
Draft Plan• June 29, 2018: Draft Seaport Air Quality
2020 and Beyond Plan (Draft Plan) posted online
• July 12, 2018: Presentation to the Board and Public
• June 29 to August 31, 2018: Public Review and Comment Period
Phases• Near-Term (2019-2023)• Intermediate-Term (2023-2030)• Longer-Term (2030-2050)
Stakeholder EngagementPublic Engagement Plan (Appendix G)
Annual Progress Reports
Plan UpdateYear 2023 (Year 5)
Draft Plan Development Revised Draft to Final ImplementationDec. 2017-June 2018 July 2018-Spring 2019
Task Force Meetings• #4: Sept. 26, 2018: Comments and Responses; Industry
Roundtable• #5: Jan. 10, 2019: Revised Draft Plan Overview;
Workforce Development; AECOM Study; Grant Panel• #6: March 2019 (TBD)
Revised Draft Plan• New Appendices; Response to Comments; Revised
Draft Plan; Revised Near-Term Action Plan, Public Review and Comment Period,
• December 14, 2018: Revised Draft Seaport Air Quality 2020 and Beyond Plan (Revised Draft Plan) and Response to Comments posted online
• Dec. 14, 2018 to January 17, 2019: Public Review and Comment Period
Final PlanApril 2019: Presentation to Board and Public
Plan Development Process
January 10, 2019 Task Force Meeting Revised Draft Seaport Air Quality Plan
July 12, 2018 Board Meeting
2020 and Beyond
Draft Seaport Air Quality Plan
Revised Draft Plan Outreach
September 26, 2018 Task Force Meeting
• Revised Draft Plan posted online: December 14, 2018
• Revised Draft Plan circulated to seven local libraries (Oakland, Alameda and Emeryville)
• Revised Draft Plan Comment Period: December 14, 2018 to January 17, 2019
• Phone and Email Outreach: throughout comment period
• Inventory of current electric equipment at Seaport (Posted in MAQIP section of Port website on January 2, 2019)
• Task Force Meeting: January 10, 2019 at Port of Oakland (530 Water Street)
• Comments due: January 17, 2019Revised Draft Seaport Air Quality PlanJanuary 10, 2019 Task Force Meeting
July 12, 2018 Board Meeting
2020 and Beyond
Draft Seaport Air Quality Plan
Revised Draft Plan Structure and Content
September 26, 2018 Task Force Meeting Revised Draft Seaport Air Quality Plan
• Volume I: Main Text and Appendices
• Part I: Concept
• Part II: Implementation including Near-Term Action Plan
• Appendices
• Volume II: Response to Comments
• Introduction: Overview and Changes from Draft to Revised Plan
• Section 1: Master Comment Responses by Topic
• Section 2: Responses to Individual Comments
• Section 3: Written Comments
January 10, 2019 Task Force Meeting
July 12, 2018 Board Meeting
2020 and Beyond
Draft Seaport Air Quality Plan
Revised Draft Plan Structure and Content
September 26, 2018 Task Force Meeting Revised Draft Seaport Air Quality Plan
• Volume II: Response to Comments, Topic Areas, Comment Matrix• Section 1: Master Comment Responses by Topic
1. Vision: Pathway to Zero Emissions2. Community Health Risk and Assembly Bill (AB) 6173. Document Review4. Emissions Inventories5. Financial Feasibility6. Grants, Incentives and Funding Mechanisms7. Stakeholder Engagement8. Goals9. Zero-Emissions Technology
• Section 2: Responses to Individual Comments (Comments Matrices)• Section 3: Written Comments (Comment Letter Copies)
January 10, 2019 Task Force Meeting
July 12, 2018 Board Meeting
2020 and Beyond
Draft Seaport Air Quality Plan
Revised Draft Plan Structure and Content
September 26, 2018 Task Force Meeting Revised Draft Seaport Air Quality Plan
• Volume I—AppendicesA. Planning Assumptions
B. Background
C. Detailed Description of Implementing Actions (IAs)
D. Screening and Evaluation of IAs
E. Workforce Development Plan (new)
F. Equipment Operations and Costs Assessment to Assist with Electrical Infrastructure Planning (“AECOM Study”)(new)
G. Public Engagement Plan (new)
January 10, 2019 Task Force Meeting
July 12, 2018 Board Meeting
2020 and Beyond
Draft Seaport Air Quality Plan
Changes from Draft Plan to Revised Draft Plan
September 26, 2018 Task Force Meeting Revised Draft Seaport Air Quality Plan
• Revisions to the Near-Term Action Plan (NTAP) (see Table 2 in Vol I)• Addition of Implementing Actions for Strategies #4 - #6 (see Appendix C in Vol I)• Revisions to Appendix D: Proposed Screening Criteria for New Implementing Actions (Vol I)• Textual and structural revisions to reconcile Plan elements and to improve the readability of
the Plan• Appendix E: Workforce Development (Vol I)• Appendix F: Equipment Operations and Cost Assessment (to assist with Electrical
Infrastructure Planning) (Vol I)• Appendix G: Public Engagement Plan (Vol I)• Volume II: Response to Comments
January 10, 2019 Task Force Meeting
July 12, 2018 Board Meeting
2020 and Beyond
Draft Seaport Air Quality Plan
Revised Near Term Action Plan (Volume I, Table 2)
September 26, 2018 Task Force Meeting Revised Draft Seaport Air Quality Plan
• 32 Near-Term Actions for 2019-2023 across five main categories: Equipment, Infrastructure, Operations, Fuels, and Partnerships
More concrete actions* (NEW)
Specific timelines and responsible party for implementing actions (NEW)
The status of the actions (i.e., programmed; potential) (NEW)
Goals: Electric equipment and support infrastructure (NEW)
* Definition: Concrete actions are actions that apply to equipment, infrastructure, fuels, and operations. Concrete actions are contrasted with studies and monitoring, which are also crucial to effective Plan implementation.
January 10, 2019 Task Force Meeting
July 12, 2018 Board Meeting
2020 and Beyond
Draft Seaport Air Quality Plan
• 3 Intermediate-Term (Years 2023-2030) Goals1. Deploy 44 Pieces of Zero-Emissions Cargo-Handling Equipment
by 20252. Deploy 21 Zero-Emissions Short-Haul Drayage Trucks by 20273. Infrastructure to Support Zero-Emissions Equipment (above)
Revised Near Term Action Plan: Goals (NEW)
January 10, 2019 Task Force Meeting
July 12, 2018 Board Meeting
2020 and Beyond
Draft Seaport Air Quality Plan
Resources
January 10, 2019 Task Force Meeting
Implementation anticipates substantial resources:• Technology• Equipment• Fuels• Infrastructure• Plan management• Workforce
Strategy #6: Pursue External Funding• External grants and incentive programs
Response to Comments, Topic #6: Grants, incentives and funding mechanisms
July 12, 2018 Board Meeting
2020 and Beyond
Draft Seaport Air Quality Plan
Projects UnderwayShore Power • Jan.- Nov. 2018: 74% Successful Vessel Plug-In• Criteria pollutants reduced in 2017: -600 tons per year (tpy).• CO2e (carbon dioxide equivalents) reduced in 2017: -21,800
tpy.Moyer Grant (June 2018: Contract executed) • 13 Hybrid RTG Cranes.• Criteria pollutants: -45 tpy.• CO2e: -1,200 tpy.
Port of LA and Long Beach Feasibility Studies• Drayage truck FS (draft dated December 2018)
• 22 demonstration projects• ZE trucks not yet feasible
• Cargo Handling Equipment study due 1Q 2019
(ZANZEFF) Grant (January 24 Board meeting) • 10 zero-emissions Class 8 drayage trucks and 10 chargers.• 5 zero-emissions yard trucks• 1 zero-emissions top handler• Related electrical infrastructure• Criteria pollutants: -8 tpy• CO2e: -940 tpy
South Coast/Bay Area Air Quality Management Districts• Demonstrate 10 ZE Phase II electric BYD Trucks at the
seaport by Spring 2019 (one Phase I exists at GSC).
Port Fleet • Received first zero-emissions electric van (9 passengers) not
operating yet
Seaport Electrical Infrastructure Study (1Q 2019)
September 13, 2018 CEMANC ConferenceSeptember 26, 2018 Task Force Meeting Revised Draft Seaport Air Quality PlanJanuary 10, 2019 Task Force Meeting
July 12, 2018 Board Meeting
2020 and Beyond
Draft Seaport Air Quality Plan
Next StepsActions DateRevised Draft Plan and Response to Comments available. Fri., Dec. 14, 2018
Public Review and Comment Period Fri., Dec. 14, 2018 to Thurs., Jan. 17, 2019
Seaport Air Quality Plan Task Force Meeting #5 Thurs., Jan. 10, 2019
Seaport Air Quality Plan Task Force Meeting #6 March 2019
Present Final Seaport Air Quality 2020 and Beyond Plan to Board and public at Board Meeting.
April 2019
Seaport Air Quality Plan Task Force Meeting #7 TBD
September 26, 2018 Task Force Meeting Revised Draft Seaport Air Quality PlanJanuary 10, 2019 Task Force Meeting