REPORT ACCOMPANYING Estimate for Laying of 300mm dia MS pipeline by taking off take from Krishna water Pipe line 1000mm dia Phase I near Engine Bowli X Road and as Inlet to Vattepally Reservoir to improve water supplies and Convert to alternate water supply for Improvement in areas Bibi k chashma,achi reddy nagar,madina colony part,farooq nagar,fathimanagar ,pardha gate,bangladesh galli Under MRG SECTION SD-1,O&M Div no-1. Sub.Dn.I, O & M Dn.I.
Amount of Estimate: Rs. Lakhs
In existing old water supply system of MRG Section Source of water to Command areas of Bibi ka chashma,acchireddy nagar ,farooq nagar low level,farooq nagar high level ,vattepally ,fathimanagar ,Mustafa nagar ,Guntal Baba dargah Was throuhh RCI line 400mm dia Pumping from Miralam. Now the population has increased enormously and density of population has increased drastically ,New colonies have come up in hilly areas since 2003 increased day by day.The storage Reservoir located at Vattepally which is centrally located to these areas has been fed through branch from feeder main Connecting RCI 400MM dia CI Water supply line from Miralam .Due to hilly terrain in the area in MRG Section and increase in command area and density of Population and lack of dedicated feeder main to Vattepally Reservoir OHSR .Problem has arised that we can give supply once in five days .The One MG Reservoir from Which Pumping is done from RCI Pump room .The reservoir has been heavily loaded as it is catering to water supply requirement of MRG Section,Bahadurpura section ,chandulal bardari section The supply and demand are not met resulting in Levels being fall down quickly and Pumping hours reduced . resulting Erratic water supply timings on 11th august 2015 Honable MLA BahadurPura and Charminar Constituency along with part workers have staged dharna at water works office Bahadurpura Miralam regarding water being supplied once in five days in area back of falaknam palace areas as mentioned abaove .The same has been taken to the notice of Chief General Manager (E) Who inturn instructed General Manager(E) to come with proposal for improving water supply areas as mentioned above and converting in to alternate day supply.The above situation in detail observed during the inspection of GM(E), O & M Dn-Ialong with DGM(E) / SD-Iand Manager(Engg)/MRG Section. After detail observations in above areas, it has decided to lay 400mm dia DI water supply Dedicated Inlet main tapping water from Krishna Phase -1 at Engine Bowli X road to Vattepally OHSR and inter connect existing distribution system.Accordingly an estimate is prepared duly adopting approved rates all the specials for connecting proposed 400mm DI pipeline by taking off take from Krishna water Pipe line 1000mm dia Phase I near Engine Bowli X Road and laying 400mm dia Main as Inlet to Vattepally Reservoir to improve water supplies and Convert to alternate water supply for Improvement in areas Bibi k chashma,achi reddy nagar,madina colony part,farooq nagar,fathimanagar ,pardha gate,bangladesh galli Under MRG SECTION SD-1,O&M Div no-1., and the expenditure may be chargeable to Board Funds
Dy. General Manager(Engg)
General Manager(Engg)
`Manager(Engg)MRG Section Sub. Dn. I, O & M Dn. I. O&M Dn. I, Goshamahal.
Amount of Estimate: Rs.2,70,000.00
There is no water supply line in this stretch of Ghousia Bagh, existing domestic water
connections from main road, due to lengthy . Previously the supply system is from Asifnagar
pumping main, now it is from Bhoja gutta reservoir, and there is no feeder main only 100mm dia
distribution line is there. Previously there are only individual houses, now those are almost
converted as two storied and three storied buildings and may portions recently four individual
houses have been converted into MSB’s and those consumers applied for higher dia connections.
Hence separate of 100mm dia DI water supply line is essential for improvement of water supply
to Nandi Nagar and Saptagiri colony. The matter was informed to General Manager(Engg), O &
M Division – III during his routine inspection to the section and has instructed to submit
proposals for laying of 200 mm dia D.I. water supply line for improvement of water supply to the
above area and also to cater supplies to MSB’s.
Accordingly an estimate is prepared with a proposal to laying of 100 mm dia water
supply line to extent of 100Rmt which will be connected to the existing 250 mm dia water supply
main at opp. Sofine Hotel . Provision has been made in the estimate towards road restoration.
The total cost of the estimate is Rs.2,00,000.00. the estimate is prepared based on current SSR
and departmental approved rates. The expenditure may be chargeable to E/WS under IInd
Phase 100 days Programme.
The estimate is here with submitted for favour of early approval.
Manager(Engg) Dy. General Manager(Engg) General Manager(Engg) Kakatiya Nagar Section Sub. Dn. III, O & M Dn. III. O&M Dn. III, Goshamahal.
REPORTREPORT ACCOMPANYING THE ESTIMATE FOR Laying of 150mm dia DI water supply line from H.No:13-6-460/10/7, MMR School to H.No:13-6-460/15/1, Mahesh Nager under Karwan Section, Sub.Dn.III of O& M Division – III.
Amount of Estimate: Rs.7,75,000.00
The existing water supply line is 100mm dia in this stretch of Mahesh Nagar. There is no
feeder main only 100mm dia distribution line is there. Previously there are only individual
houses, now those are almost converted as two storied and three storied buildings and those
consumers applied for higher dia connections. Hence separate of 150mm dia DI water supply
line is essential for improvement of water supply to Mahesh Nagar . The matter was informed to
General Manager(Engg), O & M Division – III during his routine inspection to the section and
has instructed to submit proposals for laying of 150 mm dia D.I. water supply line for
improvement of water supply to the above area and also to cater supplies to MSB’s.
Accordingly an estimate is prepared with a proposal to laying of 150 mm dia water
supply line to extent of 210Rmt which will be connected to the existing 250 mm dia water supply
main at MMR school. Provision has been made in the estimate towards road restoration. The
total cost of the estimate is Rs.7,75,000.00. the estimate is prepared based on current SSR and
departmental approved rates. The expenditure may be chargeable to Board funds.
The estimate is here with submitted for favour of early approval.
Manager(Engg) Dy. General Manager(Engg) General Manager(Engg) Karwan Section Sub. Dn. III, O & M Dn. III. O&M Dn. III, Goshamahal.
REPORT ACCOMPANYING Estimate for Laying of 00mm/100mm dia DI water supply line from Subji Mandi Sump to New Ganga Nagar to improve existing water supply system and to eliminate pit taps at Ganga nagar under Karwan Section, Sub.Dn.III, O & M Dn.III.
Amount of Estimate: Rs.15.50 Lakhs
In existing old water supply system in Ganga nagar of Karwan Section 100mm dia water
supply line is there to catter the water supply to Ganga Nagar, Police quarters and Mekala mandi
and Joshi Wadi all above lanes and by lanes junctions made from 100mm dia water supply line
only. Now the population has increased enormously and distribution network of 100mm dia CI &
RCC water supply distribution network on 18( Eighteen) areas water supply lines. The same
can be seen in present distribution network plan enclosed. Due to increase of thick population
and distribution system low pressure and no water supply complaints in tail end areas of both
sides of the main road increased day by day.
The Hon’ble MLA Karwan Constituency also insisted many times to eliminate pittaps and
improve the low pressure problems in above Ganga Nagar and Joshi wadi areas and also the
GHMC corporator of ward No- requested to solve the water supply problems in ward of Karwan
, specially in tail end area.
The above situation in detail observed during the inspection of CGM(E), O & M Circle-III,
GM(E), O & M Dn-III along with DGM(E) / SD-IIIand Manager(Engg)/Karwan Section. After detail
observations in above Ganga Nagar, Police quarters and Mekala mandi and Joshi Wadi areas, it
has decided to lay 200mm dia water supply feeder main in Ganga Nagar 100mm dia in Joshi
Wadi water supply lines to inter connect existing distribution system to proposed feeder main and
cut off the sub mains after every four localities instead of lengthy supplies shown in the plan
enclosed, for proper distribution of water in all tail end areas.
Accordingly an estimate is prepared duly adopting approved rates all the specials for
connecting proposed 200/100mm dia feeder main to existing distribution main have taken in CI
as the DI specials will not suit to the existing CI & RCC old lines, and the expenditure may be
chargeable to 3rd 100 Days Programme.
Manager(Engg) Dy. General Manager(Engg) General Manager(Engg) Karwan Section Sub. Dn. III, O & M Dn. III. O&M Dn. III, Goshamahal.
REPORT ACCOMPANYING Estimate Laying of 100mm dia DI water supply line at Ghousia Bagh to replace damaged old RCC water supply line to avoid pollution from H.No13-5-41/17/2 to 13-5-41/17/13 and from H.No: 13-5-64 to 13-5-131, near Shabab Hotel under Karwan Section, Sub.Dn.III, O & M Dn.III.
Amount of Estimate: Rs.5.00 Lakhs
In existing old water supply system in Ghousia Bagh junctions made from 100mm dia
water supply line only. Now the population has increased enormously and distribution network of
100mm dia RCC water supply distribution network. The same can be seen in present
distribution network plan enclosed. Due to increase of thick population and distribution system
low pressure and no water supply complaints in tail end areas of both sides of the main road
increased day by day.
The Hon’ble MLA Karwan Constituency also insisted many times to eliminate pittaps and
improve the low pressure problems in above Ghousia Bagh areas and also the GHMC corporator
of ward No- requested to solve the water supply problems in ward of Karwan , specially in tail
end area.
The above situation in detail observed during the inspection of CGM(E), O & M Circle-III,
GM(E), O & M Dn-III along with DGM(E) / SD-IIIand Manager(Engg)/Karwan Section. After detail
observations in above Ghousia Bagh area, it has decided to lay 100mm dia water supply line in
Ghousia Bagh 100mm dia in water supply lines to inter connect existing distribution system to
proposed feeder main and cut off the sub mains after every four localities instead of lengthy
supplies shown in the plan enclosed, for proper distribution of water in all tail end areas.
Accordingly an estimate is prepared duly adopting approved rates all the specials for
connecting proposed 100mm dia feeder main to existing distribution main have taken in CI as the
DI specials will not suit to the existing RCC old lines, and the expenditure may be chargeable to
3rd 100 Days Programme.
Manager(Engg) Dy. General Manager(Engg) General Manager(Engg) Karwan Section Sub. Dn. III, O & M Dn. III. O&M Dn. III, Goshamahal.
REPORT ACCOMPANYING Estimate for Replacement of old RCC/AC damaged200/100mm dia with 200mm/100mm dia DI pipe toavoid frequent pollution complaints at Mahboob colony under Karwan Section, Sub.Dn.III, O & M Dn.III.
Amount of Estimate: Rs.16.00 Lakhs
In existing old water supply system in Mahboob colony junctions made from 100mm dia
water supply line only. Now the population has increased enormously and distribution network of
100mm dia RCC water supply distribution network. The same can be seen in present
distribution network plan enclosed. Due to increase of thick population and distribution system
low pressure and no water supply complaints in tail end areas of both sides of the main road
increased day by day.
The Hon’ble MLA Karwan Constituency also insisted many times to eliminate pittaps and
improve the low pressure problems in above in Mahboob colony areas and also the GHMC
corporator of ward No- requested to solve the water supply problems in ward of Karwan ,
specially in tail end area.
The above situation in detail observed during the inspection of CGM(E), O & M Circle-III,
GM(E), O & M Dn-III along with DGM(E) / SD-IIIand Manager(Engg)/Karwan Section. After detail
observations in above in Mahboob colony area, it has decided to lay 100mm dia water supply
line in in Mahboob colony 100mm dia in water supply lines to inter connect existing distribution
system to proposed feeder main and cut off the sub mains after every four localities instead of
lengthy supplies shown in the plan enclosed, for proper distribution of water in all tail end areas.
Accordingly an estimate is prepared duly adopting approved rates all the specials for
connecting proposed 100mm dia feeder main to existing distribution main have taken in CI as the
DI specials will not suit to the existing RCC old lines, and the expenditure may be chargeable to
3rd 100 Days Programme.
Manager(Engg) Dy. General Manager(Engg) General Manager(Engg) Karwan Section Sub. Dn. III, O & M Dn. III. O&M Dn. III, Goshamahal.