BAPETEN was established in 1998 based on
the Act No. 10 Year 1997 on Nuclear Energy
Article 4
The Government establishes a Regulatory Body,
under and directly responsible to the President.
The Regulatory Body shall have the task to
control any activity using nuclear energy.
To accomplish the task under clause (1), the
Regulatory Body establishes regulations, conduct
licensing processes and inspections.
Objects or facilities to be controlled :
1. Radioactive Materials and Radiation Facilities
2. Nuclear Installations and Materials
1. Radioactive Materials and Radiation Facilities
Public Health:
Diagnostic,
Therapy, etc.
Industry:
Radiography,
Gauging/Logging
Tracer, etc.
Research, etc
2. Nuclear Installations and Materials comprises:
Nuclear reactor,
Multi Purpose Reactor ( 30 MW) in Serpong
TRIGA Mark II Reactor ( 2 MW ) in Bandung
TRIGA Mark II Reactor ( 100 kW ) in Jogjakarta
Nuclear Fuel Cycle Facilities:
RR Fuel Element Production Installation
Experimental Fuel Element Installation
Radiometallurgy Installation
Transfer Channel–Interim Spent Fuel Storage Facility.
Nuclear Materials:
Nuclear fresh and spent fuels.
GENERAL AFFAIR BUREAU
ORGANIZATION & LEGAL
BUREAU
PLANNING BUREAU
CHAIRMAN
EXECUTIVE SECRETARY DEPUTY CHAIRMAN FOR LICENSING &
INSPECTION
DEPUTY CHAIRMAN FOR NUCLEAR SAFETY
ASSSESSMENT
DIRECTORATE FOR LICENSING OF RADIATION FACILITY
& RADIOACTIVE MATERIAL
DIRECTORATE FOR LICENSING OF NUCLEAR
INSTALLATION & MATERIAL
DIRECTORATE FOR INSPECTION OF RADIATION
FACILITY & RADIOACTIVE MATERIAL
DIRECTORATE FOR TECHNICAL &
EMERGENCY PREPAREDNESS&
RESPONSE
DIRECTORATE FOR INSPECTION OF NUCLEAR
INSTALLATION & MATERIAL
ASSESSMENT CENTER FOR REGULATORY SYSTEM & TECHNOLOGY OF NUCLEAR
INSTALLATION & MATERIAL
DIRECTORATE FOR REGULATION OF RADIATION FACILITY & RADIOACTIVE
MATERIAL
DIRECTOR FOR REGULATION OF NUCLEAR INSTALLATION & MATERIAL
ASSESSMENT CENTER FOR REGULATORY SYSTEM & TECHNOLOGY OF RADIATION
FACILITY & RADIOACTIVE MATERIAL
INTERNAL
AUDITOR
TRAINING UNIT
Government Regulation (GR)
GR No.43/2006 on Licensing of Nuclear Reactor
Under review
Chairman Regualation (CR)
CR No. 4/2009 on Decommissioning of Nuclear
Reactor
CR No.6/2011 on Decommissioning of Nuclear
Fuel Cycle Facilities
Other Regulation
Apply for
Decommissioning Permit Conduct safety review
Performing
Decommissioning Submit safety review report &
Issue Decommissioning Permit
Apply for
Release of Site Statement Conduct safety review
Release from
Regulatory Control
Submit safety review report &
Issue Release of Site Statement
Applicant BAPETEN
Decommissioning Program Prelimineary SARThe Plan
SAR The summary
Operation Phase The Program
DP, review period : 5 years
a) Installation Description
b) Organization Structure
and schedule
c) Decommissioning options
d) Characterization Survey
plan
e) Cost estimate
f) Safety assessment
g) Environment assessment
h) Radiation protection
program
i) Security and safeguards
program
j) Emergency planning
k) Radioactive waste
management plan
l) Decommissioning activity
m) Surveillance and
maintenance
n) Final radiaological survey
Review of historical documentation
Identification of potential contamination
sources and locations
Characterization surveys
Data interpretation of and results
Review of historical documentation
Identification of contamination sources and
locations
Measurements made and analyses performed
Conclusions and summary
Appendices
Identification of contamination sources and
locations
Measurements made and analyses performed
Comparison with clearence level
Conclusion and summary
Appendices
Faciltiy description
Decommissioning
objectives
Release criteria
Decommissioning
activities
Remaining entities
Final radiological
status
Site release
Waste volumes
Personels doses
Abnormal
occurences,
incidents, and
accidents (if any)
Lesson learned
Phosphate acid purification plant
Uranium: 110-180 ppm in phosphate
Cooperation between Industrial Ministry with
National Nuclear Energy Agency (BATAN)
Commissioning April – Juliy 1989
Result: 7264 kg U3O8 with 75% concentration,
sent to Center of
Stopped because there is no market.
Des 25, 2004: Apply for decommissioning
permit with Decommissiong Program as
attachment.
October 14, 2004: BAPETEN issued
decommissioning permit after evaluate the
Decommissioning Program
January -October, 2008: Conduct of
Decommissioning
September 12, 2008: Apply for Release from
Regulatory Control with Report of
Decommissioning Activity as attachment.
August 25, 2009: BAPETEN issued Statement
of Release from Regulatory Control after
evaluating and verification of documents and
the site.